Egdon Resources plc

Egdon Resources — FY2021 Earnings Presentation

19 slides from Egdon Resources's earnings presentation, Nov 3, 2021

  1. Slide 1: Preliminary Results for the 12 months ended 31 July 2021 and Business Update

    Egdon Resources plc Preliminary Results for the 12 months ended 31 July 2021 and Business Update

  2. Slide 2: Egdon at a Glance

    Egdon at a Glance • AIM: EDR • Established oil & gas exploration & production company formed in 1997 • Onshore UK focus • Growing Production and Revenues • Significant onshore exploration and appraisal assets • Nearshore gas appraisal opportunity • Material shale gas position • Identified Energy Tra

  3. Slide 3: Strategy

    Strategy Focus on growth in production and Maintain geographical Conventional revenue through conventional UK Focus production, appraisal and focus on the UK Oil & Gas exploration projects A near-term focus on developing low Maintain our significant carbon energy transition projects, portfolio of un

  4. Slide 4: Highlights

    Highlights • Wressle: Completion of site reconfiguration, facilities installation and well recompletion, with test production ongoing since late January 2021 and the proppant squeeze operation successfully completed in July 2021 • Production: 90 barrels of oil equivalent per day (“boepd”) (2020: 145

  5. Slide 5: Financials

    Financials • Gross oil and gas revenues during the year increased by 13.4% to £1.09 million (2020: £0.96 million). • Loss for the year ended 31 July 2021 of £1.68 million after write-downs, pre-licence costs and impairments of £0.48 million (2020: loss of £4.75 million after write-downs, pre-licence

  6. Slide 6: Subsequent Events

    Subsequent Events • Wressle: Coiled tubing operation completed in August 2021, with test production recommencing and flow rates exceeding pre-operational expectations. During September, we reported facility constrained instantaneous flow rates of up 884 barrels of oil per day (“bopd”) along with 480

  7. Slide 7: Production

    Production • Production was 90 boepd for the last reporting period • Initial production guidance for reporting period 2021/22 is 240 boepd reflecting increasing Wressle production • Oil and gas prices have recovered very strongly from lows seen in 2020 and are expected to remain high as worldwide ac

  8. Slide 8: Wressle – Exceeding Expectations

    Wressle – “Exceeding Expectations” Wressle (EDR 30%) • Ashover Grit Gross 2P Reserves 0.62 mmbls • Significant additional potential in Penistone Flags reservoir of 2C 1.53 mmbls • Site works completed with well placed on test production since 30 January 2021 • Proppant squeeze and subsequent coiled

  9. Slide 9: Keddington – Accessing remaining reserves

    Keddington– “Accessing remaining reserves” Keddington (EDR: 45%) • Existing production site with gross Mean Contingent Resources of 567,000 bbls remaining to be produced and further upside • Detailed reservoir engineering work currently being finalised to support the final target selection for a sid

  10. Slide 10: Waddock Cross – Redevelopment to increase production

    Waddock Cross – “Redevelopment to increase production” Waddock Cross (EDR: 55%) • Shut-in Bridport Sandstone oil field (Dorset) • Significant Stock Tank Oil Initially in Place (STOIIP) volume of 57 mmbbls • New horizontal well = commercial oil production (500-800 bopd) and c. 1 mmbls per well recove

  11. Slide 11: Exploration / Appraisal

    Exploration / Appraisal • Our portfolio of conventional assets provides potential for material growth via exploration and appraisal drilling success • The Company continues to progress those opportunities that offer maximum near-term impact • The initial focus is on Biscathorpe, North Kelsey and Res

  12. Slide 12: Biscathorpe – Appraisal of an Oil Discovery

    Biscathorpe – “Appraisal of an Oil Discovery” Biscathorpe (Egdon 35.8%) • Biscathorpe-2 well identified a possible material and commercially viable hydrocarbon resource • A planning application for side-track drilling, testing and long- term production was rejected on 1 November 2021 and subject to

  13. Slide 13: North Kelsey – Exploration to Add Reserves

    North Kelsey – “Exploration to Add Reserves” North Kelsey (PEDL241: Egdon 50%) • Prospect mapped from 3D seismic, with multiple reservoir targets = Wressle analogue • Gross Mean Prospective Resources of 6.47 mmbls in multiple reservoir targets • Licence equity equalised during the period with Union

  14. Slide 14: Resolution – Appraisal of Large Offshore Gas Discovery

    Resolution – “Appraisal of Large Offshore Gas Discovery” Resolution & Endeavour Gas Discoveries (Egdon 30%) • Farm-in completed with Shell U.K. Limited • Resolution Gas Discovery (P1929) = Early North Sea discovery (Total: 1966) Pensacola Prospect to be • CPR (Schlumberger) assessed gross Mean Conti

  15. Slide 15: Shale Gas – Maintaining a Significant Asset Position

    Shale Gas – “Maintaining a Significant Asset Position” • The Group holds a significant unconventional resources portfolio in Northern England, totalling 151,742 net acres (614km2 net) with estimated Mean volumes of undiscovered GIIP of 37.6 TCF (net) • Primary focus is the Gainsborough Trough where

  16. Slide 16: Energy Transition

    Energy Transition • The UK is committed by law to reaching “net zero” carbon emissions by 2050 • The Committee on Climate Change identifies the continuing need for oil and gas up to and beyond 2050 • The Energy Transition presents a number of business opportunities • Egdon sees the potential for rep

  17. Slide 17: Geothermal - Heat as a Potential Business

    Geothermal - “Heat as a Potential Business” • Geothermal energy projects can utilise Egdon’s core skills, knowledge, and operating experience • Our existing wells and fields have promising potential for geothermal heat generation • Repurposing extends the economic life of wells • Shut-in well at Duk

  18. Slide 18: Outlook

    Outlook • Initial production guidance for 2021-22 is 240 boepd, with Wressle being the significant contributor Our key activities and focus for the coming year will be: • Optimise oil and gas production from the Ashover Grit reservoir at Wressle • Progress monetisation of associated gas production f

  19. Slide 19: Disclaimer

    Disclaimer This document comprises the written materials/slides for a presentation (together with any accompanying information communicated verbally (including any questions and answers session and any material distributed with it), the Presentation) by Egdon Resources plc (the Company). This Presen

Egdon Resources — FY2021 Earnings Presentation on 6ix