Rokmaster Resources Corp. · TSXV:RKR
Rokmaster Resources — J Metals Investors Forum 2021
19 slides from Rokmaster Resources's conference presentation, Sep 17, 2021
Slide 1: Expanding the Gold-Polymetallic Revel Ridge Project
ROKMASTER RESOURCES CORP. TSX.V: RKR OTCQB: RKMSF FSE: 1RR1 EXPANDING the Gold – Polymetallic REVEL RIDGE Project “One B.C’s largest undeveloped precious & polymetallic deposits” J Metals Investors Forum Sept. 17, 2021. www.rokmaster.com
Slide 2: Cautionary Statement
2 Cautionary Statement This presentation contains “forward-looking information” within the meaning of applicable Canadian securities regulations and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking i
Slide 3: The Team
3 The Team John Mirko – President, CEO & Director Michael (“Mike”) Cowin – Chairman & Director Adam Pankratz, MBA, MA – Director Dennis Cojuco – CFO and Corporate Secretary Craig Parry – Senior Advisor Mark Rebagliati, P. Eng. – Geological Consultants Ted Muraro P.Eng. James (“Jim”) Oliver, Ph.D., P
Slide 4: Share Structure
4 Share Structure Share Information: Trading Symbols: Issued and Outstanding 103,881,712 RKR (TSX.V) Stock Options 6,900,000 RKMSF (OTCQB) Share Purchase Warrants 43,072,516 1RR1 (Frankfurt) Special Warrants for Duncan Property* 7,200,000 Agent Compensation Options 1,585,875 Agent Compensation Warra
Slide 5: Agenda
5 Agenda 1. The Project and Current Mineral Resource Estimate 2. Summary of 2020 / 2021 Underground Drill Program 3. Development of free gold – Distribution & Controls 4. 2021 Surface Drilling: Yellowjacket, Main Zone & New Zones 5. 2021 Objectives
Slide 6: Revel Ridge Project - 14,277 Ha
6 Revel Ridge Project - 14,277 Ha Significant replacement value in today’s dollars: • 12.5 km year-round road access road off Hwy.23 N • >3 km of operational underground workings • 41,000 m of historic diamond drilling in 315 holes • Mining equipment, underground & surface facilities, 40-person camp
Slide 7: Geology and Mineralization
7 Geology and Mineralization • RRMZ (Main Zone) is a remarkably continuous, large, tabular, structurally controlled, orogenic gold system. • RRMZ Averages 8 g/t AuEq over 2.5 m. • RRYZ (Yellowjacket Zone) stacked subparallel carbonate hosted Ag-Zn-Pb zones. • RRYZ averages 60 g/t Ag + 12% Zn-Pb
Slide 8: Current Mineral Resource Estimate
8 Current Mineral Resource Estimate RRMZ M&I: 4,200,000 MT / 1,089,000 ounces AuEq @ 8.07 g/t AuEq * RRMZ Inf: 4,562,000 MT / 961,000 ounces AuEq @ 6.55 g/t AuEq * (excludes both Hanging Wall and Footwall Zone resources) RRYZ Ind: 764,000 MT @ 9.98% Zn + 2.61% Pb + 62.8g/t Ag • Preliminary Economic
Slide 9: Current Mineral Resource Estimate: 2021 PEA Highlights
9 Current Mineral Resource Estimate: 2021 PEA Highlights ▪ High-grade underground mine - Mill-feed averaging $300/T NSR value (diluted) - Based only on all drilling up to 2012 ▪ Years 1-4 mill-feed will average $400/T NSR (diluted) ▪ After-tax NPV5.0% of C$423M and 29.5% IRR - US$1,561/oz Au, US$20.
Slide 10: RRMZ Mineral Resource Domains - Isometric Projection
10 RRMZ Mineral Resource Domains – Isometric Projection, Looking W (2012 Data)
Slide 11: RRMZ Down Plane DDH's
11 Summary of 2020 / 2021 Underground Drill Program: RRMZ Down Plane DDH’S ▪ Test 1,100 m of strike & > 500 m on dip plane ▪ Underground drilling 16,400 m NQ core ▪ 75-80% of all (42) underground drillholes make PEA cut-off
Slide 12: New KM Scale Structure: Northwestern Continuation of RRMZ
12 New KM Scale Structure: Northwestern Continuation of RRMZ Beyond 2020 AuEq Resource ▪ RRMZ intersected approx. 1,800 NW of 830 portal and 2021 Resource ▪ Surface drill program targets substantive, new gold resources at the “camp scale” RR20-11
Slide 13: DDH RR20-11 288.6 m to 294.77 m
13 DDH RR20-11 288.6 m to 294.77 m 288.64 – 290.47 • 1.83 m @ 9.54 g/t Au, 75.66 g/t Ag, 3.81% Pb, 10.91% Zn (17.30 g/t AuEq) 288.64 – 292.56 • 3.92 m @ 5.28 g/t Au, 43.22 g/t Ag, 1.95% Pb, 6.96% Zn (9.97 g/t AuEq) 286.40 – 294.77 • 8.37 m @ 2.76 g/t Au, 23.35 g/t Ag, 0.95% Pb, 3.39% Zn (5.09 g/t Au
Slide 14: Au - As Zonation?
14 Au – As Zonation? ▪ Historical Met. Bulk Samples 830 m level, 1 – 20 micron Au ▪ DDH RR21-40 cores a 4 m intercept, 460 m vertically below the 830 m level of Main Zone with: 11.55 g/t Au and 0.021 % As over a 3 m interval ▪ Decrease in As content two orders of magnitude below deposit average ▪ Fo
Slide 15: Development of Free Gold: Gold Zonation Late-Stage Quartz Gold Veins
Development of Free Gold: 15 Gold Zonation Late-Stage Quartz Gold Veins at Deeper RRMZ
Slide 16: Development of Free Gold: Au in Sheeted Quartz Veinlets
16 Development of Free Gold: Au in Sheeted Quartz Veinlets ▪ Visible Au grains noted in drillholes RR21-28, 36, and 40 ▪ Au characterized by 50 – 250 micron grains in quartz veinlets ▪ 3 samples average 38% of gold > 106 microns 0 2.0 mm
Slide 17: 2021 Surface Drilling: RRMZ - RRYZ
17 2021 Surface Drilling: RRMZ - RRYZ Targeting Resource Expansion: ▪ Expand RRYZ to Northwest, target shallow Ag rich Pb-Zn ▪ Expand RRMZ to Northwest, RRMZ thickens at depth? ▪ Currently completed approx. 8,500 m NQ surface drilling in 33 DDH’s ▪ View longitudinal section graphic for 3D modelling
Slide 18: 2021 Objectives
18 2021 Objectives 1. Complete first pass underground program 16,400 m, 75 - 80% hits 2. Investigate Free Au distribution 3. Surface drilling program > 10,000 m 4. Drill additional 2000 m of RRMZ Strike Length 5. Expand surface geochem – geology over 4 km RRMZ strike NW and SE 6. Revise NI43-101 AuE
Slide 19: 2021 Objectives: Proposed Work Plan and Budget
19 2021 Objectives: Proposed Work Plan and Budget 2nd Option Payment (paid): $1,000,000 >16,000 m surface and underground diamond drilling: $5,000,000 Mine Permitting, Variability $1,500,000 Sampling & Metallurgy: Mine & mill engineering: $1,000,000 Contingency $500,000 Revelstoke rail concentrate l