  1. Slide 1: ASX Announcement: Investor Presentation

    ASX Announcement 2 May 2022 | ASX: SLS For personal use only INVESTOR PRESENTATION Solstice Minerals Limited (Solstice Minerals or Company) is pleased to release the attached investor presentation. This announcement has been authorised for release by the Executive Director. For further information p

  2. Slide 2: Investor Presentation May 2022

    For personal use only Investor Presentation May 2022 ASX:SLS

  3. Slide 3: Important Notices and Disclaimers

    IMPORTANT NOTICES AND DISCLAIMERS Nature of Document For personal use only This presentation has been prepared by Solstice Minerals Limited (Solstice Minerals) and is current as at May 2022, unless otherwise specified. It contains general background information, is in a summary form and does not pur

  4. Slide 4: Important Notices and Disclaimers

    IMPORTANT NOTICES AND DISCLAIMERS For personal use only Disclaimer/Forward Looking Information This presentation contains certain statements which may constitute ‘forward-looking information’ which are based on the expectations, estimates and projections of Solstice Minerals as of the date on which

  5. Slide 5: Solstice Snapshot

    SOLSTICE SNAPSHOT For personal use only  Eastern Goldfields of Western Australia (WA) advanced gold and base metal exploration Gold & Base  Belt scale approach in areas of excellent mineral endowment and existing mining infrastructure Metals  Focus on Hobbes Licence with significant drill interce

  6. Slide 6: Quality Projects in Highly Prospective Terrane

    QUALITY PROJECTS IN HIGHLY PROSPECTIVE TERRANE  Eastern Goldfields gold and base metal exploration For personal use only  Significant ground holding within the highly prospective Keith-Kilkenny and Laverton Tectonic Zones - approximately 2,620km2 of granted licences and applications  “Belt style”

  7. Slide 7: Experienced Board and Management Team

    EXPERIENCED BOARD AND MANAGEMENT TEAM For personal use only Solstice Minerals is led by a highly experienced team with a proven track record of delivering shareholder value Craig Williams Alastair Morrison Matthew Yates Robert Rigo Non-Executive Chairman Executive Director Non-Executive Director Non

  8. Slide 8: Corporate Overview

    CORPORATE OVERVIEW For personal use only Number of Sources of Funds $ Capital Structure on Listing Securities Offer proceeds (before costs) $12,000,000 Total Issued Shares (ASX code: SLS) 100,000,000 Cash consideration paid by OreCorp Limited as part $5,000,000 15,000,000 of the consideration for in

  9. Slide 9: Western Australia: Gold & Base Metal Exploration Projects in the Eastern Goldfields

    WESTERN AUSTRALIA For personal use only GOLD & BASE METAL EXPLORATION PROJECTS IN THE EASTERN GOLDFIELDS

  10. Slide 10: Belt Scale Approach Builds Land Position in Eastern Goldfields

    BELT SCALE APPROACH BUILDS LAND POSITION IN EASTERN GOLDFIELDS  Team have extensive experience in the WA Goldfields For personal use only with previous WA discoveries at Nimary-Jundee, Dalgaranga and Mertondale  The Keith-Kilkenny Tectonic Zone (KKTZ) and Laverton Tectonic Zone (LTZ) host numerous

  11. Slide 11: Yarri Project – Advanced and Focused

    YARRI PROJECT – ADVANCED AND FOCUSED For personal use only  Project area located between the KKTZ and LTZ, a structural corridor hosting significant gold mines & advanced projects including Porphyry, Deep South and Carosue Dam  Key Hobbes Licence (E31/1117 – 80%) – infill drill program in Q2/Q3 20

  12. Slide 12: Hobbes Licence (80%) – Advanced Exploration, Maiden RC Drill Program Complete

    HOBBES LICENCE (80%) - ADVANCED EXPLORATION, MAIDEN RC DRILL PROGRAM COMPLETE  Broad thick zones of supergene gold mineralisation For personal use only  Historical drilling limited, often ineffective - wide spaced drill testing of primary mineralisation  25m @ 2.52g/t gold from 87m and 9m @ 7.68g

  13. Slide 13: Hobbes Prospect – Significant Supergene Mineralisation

    HOBBES PROSPECT – SIGNIFICANT SUPERGENE MINERALISATION For personal use only  Supergene blanket minimum 1km in strike length, 400m across strike and up to 30m thick  Shallow (40-65m) vertical depth below surface  Open in all directions  High grade supergene mineralisation up to 22m @ 3.22g/t gol

  14. Slide 14: Hobbes Prospect Drilling Update – Section 6,701,750

    HOBBES PROSPECT DRILLING UPDATE – SECTION 6,701,750 (LOOKING NORTH) For personal use only  Current interpretation indicates primary mineralisation trends west- northwest >500m in strike and is open along strike and down dip  Robust primary mineralised zones up to 25m @ 2.52g/t gold from 87m (NHD00

  15. Slide 15: Hobbes Prospect – 3D Structural Interpretation

    HOBBES PROSPECT – 3D STRUCTURAL INTERPRETATION For personal use only  Consultants engaged to construct a 3D structural interpretation of Hobbes  Drill data modelled with a >0.5 g/t Au grade shell generated  Suggests structural control by two fault sets  subvertical to steeply dipping east and or

  16. Slide 16: Yarri Project – Statesman Well Prospect

    YARRI PROJECT – STATESMAN WELL PROSPECT, LAKE VIEW LICENCE (E31/1225) For personal use only  Lies along the western margin of the LTZ, approximately 25km ENE of Hobbes Licence  Gold mineralisation hosted in high grade quartz veins and along the contact between BIF and felsic schist  Striking NW >

  17. Slide 17: Yarri Project – Choirboy Prospect

    YARRI PROJECT – CHOIRBOY PROSPECT (E39/1914)  Western margin of the LTZ, approximately 35km north- For personal use only northeast of Hobbes Licence  Choirboy Prospect >800m strike  CBP001 - 8m @ 1.66g/t gold from surface  CBP007 - 4m @ 3.66g/t gold from 42m  CBP008 - 15m @ 0.95g/t gold from 61

  18. Slide 18: Yarri Project – The Gap, Jericho and Jericho North Prospects

    YARRI PROJECT – THE GAP, JERICHO AND JERICHO NORTH PROSPECTS (E39/1914) For personal use only  Selected rock-chip sampling at The Gap Prospect defined 180m continuous strike of >1.0g/t gold  Jericho Prospect – sparsely drilled with up to 1.7g/t gold (max downhole) over anomalous zone up to 900m lo

  19. Slide 19: Yarri Project – Lucerne Well Licence

    YARRI PROJECT – LUCERNE WELL LICENCE (E31/1150) For personal use only  Approximately 15km NE of Hobbes Licence  Exciting zone of > 5ppb gold-in-soil anomalism defined from UFF sampling  Strike NNE coincident with fault interpreted from aeromagnetics  Up to 1.7km length and 150 to 300m width  Un

  20. Slide 20: Yarri Project – Cosmo Licence

    YARRI PROJECT – COSMO LICENCE (E31/1175)  North of and contiguous with the Hobbes Licence For personal use only  Several anomalous > 10ppb gold-in-soil zones from UltraFine fraction (UFF) sampling  Strike NNW and subparallel to the KKTZ  Untested by historical drilling  Up to 1.8km length and 2

  21. Slide 21: Yarri Project – Kingsley Well Prospect

    YARRI PROJECT – KINGSLEY WELL PROSPECT, HORSE ROCK BORE LICENCE (E31/1121) For personal use only  Kingsley Well Prospect is 20km east of Hobbes Licence  > 10ppb gold-in-soil anomalism defined from UFF sampling  Striking NS up to 1km length and 100 to 150m width  Adjacent to NNE fault interpreted

  22. Slide 22: Kalgoorlie Project – Nickel Sulphide Potential

    KALGOORLIE PROJECT – NICKEL SULPHIDE POTENTIAL  Located approximately 80km NW of Kalgoorlie in the Kalgoorlie For personal use only Terrane, host to significant gold and nickel deposits  Interpreted strike extension of the Black Swan Komatiite Complex (BSKC) - 30km along strike from Silver Swan ni

  23. Slide 23: Yundamindra Project – Bunjarra Tenement

    YUNDAMINDRA PROJECT – BUNJARRA TENEMENT (E39/1976)  Eastern margin of the KKTZ, approximately For personal use only 60km northwest of Hobbes Licence  Limited historical gold exploration  Bunjarra Prospect  Wide spaced historical drilling  BWAC18-007 - 3m @ 5.35 g/t gold from 34m  YEAC0084 - 4m

  24. Slide 24: Ponton Project – Nippon Tenement

    PONTON PROJECT – NIPPON TENEMENT (E39/2184) For personal use only  Project comprises three granted licences and four applications covering 908km2  Three groups: Pinjin, Eastern and Southwestern  Solstice has targeted the eastern granted licence (E39/2184) with soil sampling over two aeromagnetic

  25. Slide 25: Proposed Exploration Timeline

    PROPOSED EXPLORATION TIMELINE 2022 2023 For personal use only Project Prospect Activity Q2 Q3 Q4 Q1 Q2 Q3 Q4 Hobbes Drilling RC & DD, MRE    Hobbes North Drilling AC  Yarri Hobbes South Drilling AC  Statesman Well Drilling RC  Choirboy Drilling RC  GSP Drilling DD, Geophysics   Kalgoorlie R

  26. Slide 26: Aims, Objectives and Value Generators

    AIMS, OBJECTIVES AND VALUE GENERATORS  For personal use only “Back to its roots” in the Eastern Goldfields where the team has previously made major discoveries – Nimary-Jundee, Dalgaranga and Mertondale  Extensive ground package assembled using consolidated belt scale approach within the highly pr