Veris Gold Corp

Veris Gold — Investor Presentation (October 2012)

26 slides from Veris Gold's investor presentation, October 2012

  1. Slide 1: Back in Sustainable Production

    Back in Sustainable Production www.verisgold.com October 2012

  2. Slide 2: Cautionary Statement

    Cautionary Statement This presentation contains “forward-looking statements” within the meaning of applicable Canadian securities regulations and Section 21E of the United States Securities Exchange Act of 1934, as amended and the Private Securities Litigation Reform Act of 1995. All statements othe

  3. Slide 3: VGC Properties

    VGC Properties  Jerritt Canyon - historical production of Nevada approximately 8 million oz gold since 1981  100% owned.  Permitted and Producing.  Current Reserve & Resource includes: 374,800 oz Proven, 686,000 oz Probable, 1.03M oz Measured & 1.29M oz Indicated.  Fully permitted mill capacity

  4. Slide 4: Jerritt Canyon Roasting Facility is a Valuable Strategic Asset

    Jerritt Canyon Roasting Facility is a Valuable Strategic Asset  Currently, Veris Gold has the only permitted and operational roaster with spare capacity in the region. 6,000 tons/day engineered capacity roaster mill (fully permitted and operating), plus 5,000 tons/day engineered capacity wet mill (

  5. Slide 5: Jerritt Canyon Property

    Jerritt Canyon Property Jerritt Canyon has historically been a prolific gold producing district  13 open pits & 7 underground mines Murray Mine UG Marlboro Canyon OP SSX Mine UG Mill Site >1 Moz mined* 1.2 Moz mined* North Generator OP Smith Mine UG Burns Basin OP 0.4 Moz mined* 119 sq. miles of cl

  6. Slide 6: Milestones – Past, Present, Future

    Milestones – Past, Present, Future  $200mm plant and mine refurbishment completed H1 2012.  Steady state production achieved - June 2012.  Positive cash flow achieved - June 2012.  Initiate 1 for 10 share consolidation (roll-back) – achieved October 2012.  Additional permitted roaster capacity

  7. Slide 7: Jerritt Canyon: Production, Resource & Costs Overview

    Jerritt Canyon: Production, Resource & Costs Overview * Estimates are based on as per April 27, 2012, NI 43-101 Technical Report, Jerritt Canyon Property, Nevada, Jerritt Canyon historic and targeted production* Elko County, USA, and are approximate. Calendar Year Gold Production (ozs) Calendar Year

  8. Slide 8: 2012 Production – Shipped Ounces

    2012 Production – Shipped Ounces Au oz per month, 2012 18000 16000 14000 12000 10000 8000 6000 4000 2000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Actual Targeted www.verisgold.com 8

  9. Slide 9: Production Sources & Targets

    Production Sources & Targets Smith SSX Starvation Canyon Stockpile Toll Milling Ounces per month 6000 20000 18000 5000 16000 14000 4000 Toll Milling Ounces per month 12000 Processed TPD Stockpile 3000 10000 Starvation Canyon 8000 2000 SSX 6000 4000 1000 Smith 2000 0 0 Aug-12 Feb-13 Aug-13 Feb-14 Aug

  10. Slide 10: Underground Mining Operations

    Underground Mining Operations  Smith underground mining restarted Q1/2010.  1,200 tons/day targeted  Currently contract mined  Consider take back of mining operations in-house  SSX/Steer underground mining re-started Q4/2011.  1,200 tons/day targeted  In-house mining operation  Starvation Ca

  11. Slide 11: Improving Production Costs

    Improving Production Costs  Newmont ore deal expired December 2011 Historic and projected cash costs – was the biggest factor in rising cash costs for 2009, 2010, 2011. $1,500 Historic Projected $1,300  Started mining SSX/Steer underground Cash Cost ($/oz ) $1,100 mine in-house Q4 2011. Lower cost

  12. Slide 12: Third Party Ore Potential

    Third Party Ore Potential  Permitted capacity of 6,000 tpd (5,400 tpd factoring in availability).  Jerritt underground production of 3,000 tpd from current mines leaving approx. 2,400 tpd for 3rd party ore processing at full permit capacity.  Current terms being considered for 3rd party processin

  13. Slide 13: Jerritt Canyon Reserves & Resources

    Jerritt Canyon Reserves & Resources Jerritt Canyon Reserves: as of December 31, 2011 (Published on April 27, 2012) PROVEN PROBABLE PROVEN & PROBABLE Tons Grade Gold Tons Grade Gold Tons Grade Gold (Ktons) (oz/st) (K oz) (Ktons) (oz/st) (K oz) (Ktons) (oz/st) (K oz) 1,980.2 0.189 374.8 4,076.7 0.168

  14. Slide 14: Jerritt Canyon Reserves & Resources

    Jerritt Canyon Reserves & Resources  Updated NI 43-101 filed April 27, 2012.  As of December 31, 2011, the ore stockpile contains 802,600 tons averaging 0.072 opt Au for 57,700 oz total - stockpile now being milled along with ore being produced from Smith Mine and SSX/Steer.  Consolidated histori

  15. Slide 15: Resource Expansion & Exploration Opportunities

    Resource Expansion & Exploration Opportunities  Underground and surface exploration planned at both the Smith and SSX/Steer mines to expand resource and reserves organically.  Exceptional recent drill results including Mahala Basin validate belief that new resources will be found nearby existing m

  16. Slide 16: Ketza River Project, Yukon Territory

    Ketza River Project, Yukon Territory Resources* Tonnage Grade Gold Ownership 100% owned (purchased in 1997) (K tonnes) (g/t) (koz) Measured 167.8 5.38 29 Location Near Ross River, Yukon Territory Indicated 2,212.3 5.46 389 Measured & Indicated 2,380.1 5.46 418 340-tpd CIL circuit, a camp and Inferre

  17. Slide 17: Management Team

    Management Team Randy Reichert Co-Chief Executive Officer 24 years mining industry experience, Oriel Chief Operating Officer Resources, Bema Gold and Teck Corp. Board Director Shaun Heinrichs Co-Chief Executive Officer 15 years accounting experience, beginning with Chief Financial Officer Ernst & Yo

  18. Slide 18: Capital Structure

    Capital Structure Share Structure (as of September 30, 2012) Shares Outstanding 99,690,167 Warrants – Total 14,600,474 Weighted Average exercise price of $4.20 Options – Total 6,206,551 Weighted Average exercise price of $3.00 Shares Fully Diluted 120,497,192 Major Shareholders Orifer 19.01% Sprott

  19. Slide 19: Corporate Summation and Catalysts

    Corporate Summation and Catalysts Strategic asset in mining friendly Nevada:  Desirable roaster capacity in region with prolific refractory ore supplies.  Production ramp-up underway (ongoing news flow).  Production cost reduction plan in place and underway (ongoing news flow). Resource growth po

  20. Slide 20: Additional Reference Slides

    Additional Reference Slides www.verisgold.com 20

  21. Slide 21: Deutsche Bank Gold Facility

    Deutsche Bank Gold Facility  Since August 2011, two gold forward loans Delivery Schedule (1) Deal Structure with Deutsche Bank (“DB”) have been DB Ounces Maximum VGC Payment Price implemented to raise gross proceeds of Oz in Excess of DB Deliveries DB Portion Initial financing from DB ~$140M USD, w

  22. Slide 22: West Mahala Surface Drilling 2011

    West Mahala Surface Drilling 2011 www.verisgold.com 22

  23. Slide 23: Proposed Starvation Canyon Underground Mine Workings

    Proposed Starvation Canyon Underground Mine Workings Underground Ore Stopes North 2011 Assay Result Highlights TJ-364 6.10m @ 6.86 g/t Starvation TJ-364a 9.15m @ 7.68 g/t Canyon UG Mine Portal TJ-366 28.97m @ 18.86 g/t TJ-367 7.62m @ 6.31 g/t Ventilation TJ-368 9.15m @ 9.50 g/t Raise 4.57m @ 9.60 g/

  24. Slide 24: Current Ketza River Work

    Current Ketza River Work  Socio-Economic Participation Agreement signed April 2012.  Community and First Nations consultation meetings.  Type A water license application for the Mill, truck shop & warehouse Main camp & Office existing tails. buildings  2011 drill program including 4,402m of Tail

  25. Slide 25: Board of Directors

    Board of Directors Shaun Heinrichs, BBA, CA, CPA (Illinois) Gerald Ruth Co-CEO, Co-President, CFO and Director Director Randy Reichert, M.Sc. P.Eng. Jay Schnyder, B.A. Co-CEO, Co-President, COO and Director Director Graham C. Dickson, B.Sc. A.R.C.S Jean-Edgar de Trentinian Senior VP Acquisitions & C

  26. Slide 26: Contact Information

    Contact Information Veris Gold Corp. Richard Moritz Suite 900 – 688 West Hastings St. Senior Director, Vancouver, BC V6B 1P1 Institutional Investor Relations Canada Email: rmoritz@verisgold.com Tel: +1 (604) 688 9427 Fax: +1 (604) 688 9426 Nicole Sanches www.verisgold.com Investor Relations Manager