Neometals Ltd · ASX:NMT

Neometals — TZMI Congress 2020

23 slides from Neometals's conference presentation, Nov 2, 2020

  1. Slide 1: Barrambie - Waking the Sleeping Giant

    For personal use only BARRAMBIE - WAKING THE SLEEPING GIANT TZMI Congress 2020 November 2020 ASX Code: NMT OTC/Nasdaq Intl: RDRUY

  2. Slide 2: Disclaimer

    DISCLAIMER Summary information: This document has been prepared by Neometals Ltd (“Neometals” or “the Company”) to provide summary information about the Company and its associated entities and their activities current as at the date of this document. The information contained in this document is of

  3. Slide 3: Neometals innovatively develops opportunities in minerals and advanced materials

    Neometals innovatively develops opportunities in minerals For personal use only and advanced materials essential for a sustainable future • ASX-listed project developer • Focus on minerals & materials for EV and energy storage sectors • 4 core projects with partners and Nickel exploration via Mt Edw

  4. Slide 4: Neometals project portfolio

    Lithium-Ion Battery Recycling Project (Feasibility Stage, For personal use only 50:50 Incorporated JV) Vanadium Recovery Project (Pre-Feasibility Stage, option to form 50:50 Incorporated JV) Lithium Refinery Project Vanadium Recovery (Feasibility Stage, MOU LiB Recycling for 50:50 Incorporated JV) B

  5. Slide 5: Chinese titanium industry structural changes present Neometals with a strategic opportunity

    Chinese titanium industry structural changes present For personal use only Neometals with a strategic opportunity • For environmental and economic reasons China is transitioning to feedstocks suitable for Chloride Pigment production • Preference for high grade feedstocks such as synthetic rutile, hi

  6. Slide 6: The Opportunity: Growing Chinese Demand for Feedstocks Suitable for Chloride Pigment

    THE OPPORTUNITY: GROWING CHINESE DEMAND FOR FEEDSTOCKS SUITABLE FOR CHLORIDE PIGMENT For personal use only Source: Source: TZMI August 2020 Forecast *Jazan smelter has capacity of 500ktpa TiO2 slag 6

  7. Slide 7: The Solution: Wake the Sleeping Giant

    For personal use only THE SOLUTION WAKE THE SLEEPING GIANT Barrambie Titanium and Vanadium Project 100% Neometals Owned 7

  8. Slide 8: Barrambie Overview

    BARRAMBIE OVERVIEW Globally one of the highest-grade hard-rock titanium assets For personal use only • 100% owned • Tier 1 jurisdiction • Granted mining lease • EPA approval • >A$30M spent to date in exploration / evaluation (inc. 55,000m of drilling) • Established a large resource base • Evaluated

  9. Slide 9: The Solution: Wake the Sleeping Giant

    THE SOLUTION: WAKE THE SLEEPING GIANT For personal use only Barrambie by Ore Body Size* (Mt) Barrambie Contained Metal* (Mt) *Please refer to ASX announcement 17 April 2018 titled “Updated Barrambie Mineral Resource Estimate” 9

  10. Slide 10: Solution 1: Beneficiation in Australia - Pyromet Refinery in China

    SOLUTION 1: BENEFICIATION IN AUSTRALIA – PYROMET REFINERY IN CHINA For personal use only Schematic Barrambie Development 10

  11. Slide 11: Solution 1: Smelt Barrambie Fe/V/Ti Concentrate in China

    SOLUTION 1: SMELT BARRAMBIE FE/V/TI CONCENTRATE IN CHINA For personal use only Pig Iron 11 11

  12. Slide 12: Solution 2: Potential Reductive Roast Alternative

    SOLUTION 2: POTENTIAL REDUCTIVE ROAST ALTERNATIVE For personal use only Schematic Barrambie Development Reductive roast reduces vanadium level in titanium slag and creates additional options for processing high vanadium iron concentrate 12 12

  13. Slide 13: Solution 2: Potential Reductive Roast Alternative

    SOLUTION 2: POTENTIAL REDUCTIVE ROAST ALTERNATIVE For personal use only 13 13

  14. Slide 14: The Strategy: Secure Strong Partner

    THE STRATEGY: SECURE STRONG PARTNER For personal use only Conditional MOU signed for 50:50 operating JV with leading Ti-V Research Institute IMUMR • IMUMR has Chinese national mandate to develop upstream supply chains for strategic industries. China is half of global titanium pigment production • IM

  15. Slide 15: Next Steps

    NEXT STEPS: For personal use only • Complete bench scale testwork and financial modelling of the final two flow sheets (NMT) • Select final flowsheet (NMT/IMUMR) • Complete scale up work/ demonstration plant on selected flowsheet (IMUMR) • Complete development studies (NMT/IMUMR) 15

  16. Slide 16: For personal use only

    For personal use only Structural changes in Narrowing focus to final Chinese titanium market flowsheet selection presents opportunity Large and high grade resource Mining licence in Tier 1 jurisdiction Consistent strategy - partnering to reduce risks and realise returns

  17. Slide 17: Neometals Corporate Overview

    For personal use only NEOMETALS CORPORATE OVERVIEW 17

  18. Slide 18: Corporate Dashboard

    CORPORATE DASHBOARD ASX: NMT OTC:RDRUY Neometals For personal use only Shares on Issue1 m 545.4 Share Price (30-Oct-20) A$ 0.19 12 Month Share Price Performance Market capitalisation A$m 106.3 (30-Oct-20) 0.30 12,000 Cash (30-Sep-20) 2 A$m 76.6 Debt A$m - 10,000 Investments 0.25 A$m 7.3 (est 30-Sep-

  19. Slide 19: Appendix: Barrambie Mineral Resource and Reserve Estimates

    For personal use only APPENDIX BARRAMBIE MINERAL RESOURCE AND RESERVE ESTIMATES 19

  20. Slide 20: Appendix - Mineral Resource and Ore Reserve Estimate

    APPENDIX – MINERAL RESOURCE AND ORE RESERVE ESTIMATE For personal use only 20

  21. Slide 21: Barrambie Mineral Resource Estimate

    BARRAMBIE MINERAL RESOURCE ESTIMATE For personal use only Global Mineral Resource as at 17 April 20181 Classification Tonnes (M) TiO2 (%) V2O5 (%) Indicated 187.1 9.61 0.46 Inferred 93.0 8.31 0.40 Total 280.1 9.18 0.44 High Grade V2O5 Mineral Resource at (0.5% V2O5 cut-off)2 Classification Tonnes (M

  22. Slide 22: Barrambie Ore Reserve Estimate

    BARRAMBIE ORE RESERVE ESTIMATE For personal use only Barrambie Project Ore Reserve Estimate 22 May 20192 Ore Reserve Ore Tonnes (M) V2O5 (%) TiO2 (%) Category Probable 39.9 0.78 15.1 Cut-off based on 0.6% V2O5 cut-off (prior to dilution) and net value (revenue minus selling, processing, administrati

  23. Slide 23: Barrambie Mineral Resource and Ore Reserve Estimate - Competent Person Attribution

    BARRAMBIE MINERAL RESOURCE AND ORE RESERVE ESTIMATE For personal use only Competent Person Attribution The information in this report that relates to the Barrambie Mineral Resource estimates is extracted from an ASX Announcement dated 17 April 2018 (see ASX Announcement “Updated Barrambie Mineral Re

Neometals — TZMI Congress 2020 on 6ix