Noble Mineral Exploration Inc. · TSXV:NOB
Noble Mineral Exploration — Investor Presentation (March 2025)
26 slides from Noble Mineral Exploration's investor presentation, March 2025
Slide 1: Quebec & Newfoundland Presentation - March 2025
TSX-V: NOB – FWB: FW7 – OTCQB: NLPFX Quebec & Newfoundland Presentation - March 2025
Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Certain statements contained in this presentation that are forward- looking in nature are based on the current beliefs and assumptions of the Company’s management. When used in this presentation, the words "may," "could," "should," "anticipate," "believe," "estimate," "exp
Slide 3: Disclosure of Exploration Results & Historical Estimates
DISCLOSURE OF EXPLORATION RESULTS & HISTORICAL ESTIMATES • Exploration activities were conducted on Noble’s Projects prior to the adoption of National Instrument 43- 101 (“NI 43-101”), as well as more recently when NI 43-101 was in force. • Historical Exploration results that pre-date the adoption o
Slide 4: Project Generator Focused on Battery and Critical Minerals
PROJECT GENERATOR FOCUSED ON BATTERY AND CRITICAL MINERALS • Cere-Villebon ~1,573 ha near Val d’Or, Quebec with historic Copper-Nickel-PGM results on the property drilling in 2023; • Buckingham Graphite ~3,700 ha in the Outaouais area of Western Quebec with large flake recoverable graphite with infi
Slide 5: Exploration Projects
EXPLORATION PROJECTS 2025 March 2025
Slide 6: Cere-Villebon Property Quebec
CERE-VILLEBON PROPERTY QUEBEC The Cere Villebon property consists of 45 claims (1,573 hectares). The property is road and power accessible, located only 4 kilometers east of Highway 117, the highway that connects Montreal to Val d’Or; The Cere Villebon property consists of pyrrhotite and chalcopyrit
Slide 7: Cere-Villebon Property Quebec
CERE-VILLEBON PROPERTY QUEBEC A drill program and geophysical survey have been completed on the Cere Villebon Project southeast of Val d’Or, Quebec. The program included 7 diamond drill holes for a total of 1,955 meters. Significant mineralization was encountered in holes 1 and 5 and are summarized
Slide 8: Significant Historic Results from Cere-Villebon
SIGNIFICANT HISTORIC RESULTS FROM CERE-VILLIBON March 2025
Slide 9: Cere-Villebon Significant 2023 Results Hole 1 and 5
CERE-VILLEBON SIGNIFICANT 2023 RESULTS FORWARD-LOOKING STATEMENT FROM HOLE 1 AND 5 Hole 1 From (m) To (m) Width (m) Cu (%) Ni (%) Co (%) Pt (g/t) Pd (g/t Pt+Pd (g/t) 101.50 102.50 1.00 0.41 0.46 0.02 0.35 0.63 0.98 137.35 148.00 10.65 0.12 0.25 0.01 0.06 0.13 0.19 162.00 225.00 63.00 0.24 0.38 0.02
Slide 10: Cere-Villebon Chargeability Anomaly
CERE-VILLEBON CHARGEABILITY ANOMALY FORWARD-LOOKING STATEMENT Chargeability Anomaly Showing Mineralization in Hole 1 and 5 March 2025
Slide 11: Cere-Villebon Chargeability Anomaly
CERE-VILLEBON CHARGEABILITY ANOMALY FORWARD-LOOKING STATEMENT March 2025
Slide 12: Cere-Villebon Deposit North Zone
CERE-VILLEBON DEPOSIT NORTH ZONE i March 2025
Slide 13: Cere-Villebon Deposit South Zone
CERE-VILLEBON DEPOSIT SOUTH ZONE March 2025
Slide 14: Cere-Villebon Mineralized Drill Core Section 2023
CERE-VILLEBON MINERALIZED DRILL CORE FORWARD-LOOKING STATEMENT SECTION 2023 March 2025
Slide 15: NHSP Project North Shore of Quebec
NHSP PROJECT NORTH SHORE OF QUEBEC March 2025
Slide 16: NHSP Airborne EM Mag Results
NHSP AIRBOURNE EM MAG RESULTS March 2025
Slide 17: Buckingham Graphite Project (Outaouais Quebec)
BUCKINGHAM GRAPHITE PROJECT (Outaouais Quebec) March 2025
Slide 18: Buckingham 2015 & 2016 Drill Locations
BUCKINGHAM 2015 & 2016 DRILL LOCATIONS March 2025
Slide 19: Ashburton 2015 Buckingham Drill Results
ASHBURTON 2015 BUCKINGHAM DRILL RESULTS March 2025
Slide 20: Ashburton 2016 Buckingham Drill Results
ASHBURTON 2016 BUCKINGHAM DRILL RESULTS • Ashburton Ventures 2015 and 2016 drill campaigns for a total of 3,782m • 20 KG Bulk Sample subjected to flotation testing for Graphite • Head Grade at 20.7% Cg • 94.8% purity • 32% large flake (+65 mesh) to Jumbo (+28 mesh) • Purity in large fractions 94.8-
Slide 21: Buckingham Drill Core
BUCKINGHAM DRILL CORE March 2025
Slide 22: Island Pond Project in Central Newfoundland
ISLAND POND PROJECT IN CENTRAL NEWFONDLAND • Unexplored • VMS Gold Target • Airborne EM/Mag Q2 2022 March 2025
Slide 23: Project Generator Focused on Battery and Critical Minerals
PROJECT GENERATOR FOCUSED ON BATTERY AND CRITICAL MINERALS • Project 81 ~25,000ha in the Timmins-Cochrane area of Northern Ontario, for which it holds the mineral rights for VMS and Gold available for option; • Carnegie/Kidd 2 – Multiple VMS targets for drilling Winter 2023 located 3-4 kms north of
Slide 24: Noble Mineral Exploration Share Capital
NOBLE MINERAL EXPLORATION SHARE CAPITAL TSX.V: NOB (Toronto) Listings: FWB: NB7 (Frankfurt) OTCQB: NLPXF (US) Common Shares: 237,299,404 Warrants ($0.11- 0.175): 9,587,833 Stock Options/RSU’s: 10,440,000 Fully Diluted: 257,327,237 Recent Share Price: $0.045 Market Capitalization: $10.6 million 52 We
Slide 25: The Discovery Curve
THE DISCOVERY CURVE Production from RELATIVE SHARE PRICE Depleting Asset Deposit Defined NOBLE Early Stage Target Resource Definition, Mine Construction Exploration Drilling PFS/Permitting March 2025
Slide 26: Management and Contact
TSX-V: NOB - FWB: NB7 - OTCQX: NLPXF Management: H. Vance White, President & Chief Executive Officer Wayne Holmstead P Geo (ON) Exploration Manager Mitchell E Lavery P. Geo. and Isabelle Robillard P.Geo. M Sc. QP for Quebec Content Corinna de Beer, Corporate Communications 2500 – 120 Adelaide St. W