Moab Minerals Limited · ASX:MOM
Moab Minerals — Investor Presentation (October 2025)
16 slides from Moab Minerals's investor presentation, Oct 20, 2025
Slide 1: Investor Presentation
October 2025 For personal use only INVESTOR PRESENTATION Exploring Resources, Building the Future ASX:MOM Zambia & Tanzania
Slide 2: Disclaimer & Forward-Looking Statements
Disclaimer & Forward-Looking Statements For personal use only This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necess
Slide 3: Investment Highlights
Investment Highlights For personal use only Zambian and Tanzania Asset Portfolio Sasare Gold & Copper Project – Zambia • 10km strike of copper anomalies in the north of the license • Historic Sasare Gold Mine in the southeast of the license Manyoni Uranium Project – Tanzania • September 2025 Maiden
Slide 4: Corporate Snapshot
Corporate Snapshot For personal use only Board of Directors Pro-Forma Capital Structure* ~4.775b 963,129,460 Mr Malcolm Day Shares on issue Total options on issue at completion Unlisted Options Managing Director ● Unlisted ($0.016 exp 4/7/2027) 20.5m Civil engineer and licenced surveyor with 25 year
Slide 5: Imbas Management
Imbas Management For personal use only Mr Byron Dumpleton Director NED Theta Gold Mines Ltd (ASX:TGM) 6.1Moz >: Byron Dumpleton was the former Chief Geologist at Red 5 Limited, which was an ASX-listed gold producer that developed the Siana Gold mines Philippines before re-entering Australia to devel
Slide 6: Sasare Gold and Copper Project
Sasare Gold and Copper Project For personal use only • Moab is set to acquire 100% ownership of Imbas Mining Pty Ltd, which has the right to acquire up to 80% ownership of the Sasare Gold and Copper Project in Zambia. • Highly prospective portfolio with significant exploration targets identified for
Slide 7: Why Mine in Zambia?
Why Mine in Zambia? For personal use only • English-based law structure, with defined legal framework for the Mining Industry: • The Mines and Minerals Development Act No. 11 of 2015 (sets the rules for mining rights, mine safety, taxation, and environmental responsibilities) • Stable and predictabl
Slide 8: Sasare Copper & Gold Project
Sasare Copper & Gold Project For personal use only • Exploration Licence: 36652 HQ LEL • 5135.64 ha (51.36 sq km) • 430km by road east of Lusaka (Zambia’s capital • 370km to Petauke via hwy, 60km by regional roads north from Petauke • Granted forManyoni Project an initial period of 4 years (PL 12224
Slide 9: Exploration Target IOCG - Gold
Exploration Target IOCG - Gold For personal use only Exploration Target for Sasare gold prospect Lower range Upper range Contained Gold Contained Gold Tonnes (Mt) Grade (Au g/t) Tonnes (Mt) Grade (Au g/t) (Moz) (Moz) 31.0 0.8 0.8 41.0 1.7 2.3 Assumptions used to develop the Gold Exploration Target2:
Slide 10: Sasare Gold Mine ~ 1.6km of Mineralised Strike
Sasare Gold Mine ~ 1.6km of Mineralised Strike For personal use only Yellow line shows the Sasare structural corridor ~1.6km Sasare East Main Adit Sasare East adit entry Assumptions used to develop the Gold Exploration Target cont. • Historic mining was from 2 parallel quartz veins of 0.8 to 3m wide
Slide 11: Exploration Target IOCG - Copper
Exploration target IOCG - Copper For personal use only Exploration Target for Mwese copper prospect Lower metal range (HG shoot option) Upper metal range (Bulk option) Contained Contained Tonnes (Mt) Grade (Cu %) Tonnes (Mt) Grade (Cu %) Copper (Mt) Copper (Mt) 14.0 1.6 0.2 106.0 0.7 0.7 Assumptions
Slide 12: Drilling and Trenching Copper Intersections
Drilling and Trenching Copper Intersections For personal use only Mweze: section shows holes SMD1 and 2, MZR5, MZR8 and MZR24 drilled and the trenches MZ1, MZ1A and MZ2A at the Mweze copper prospect (section window +/- 30m, note MZR24 is the hole coming into page shown in bottom of diagram) Mweze pr
Slide 13: Drilling and Trenching Copper Intersections
Drilling and Trenching Copper Intersections For personal use only Over 10 km of copper anomalism from geochemical surveys Eagle Eye prospect drilling:10,11,12 ● EER12 – 8m @ 1.51% from 54m including 6m @ 1.83% Cu (PL 12188/2023, 12190/2023, 12191/2023 and 12323/2023) ● EER6 – 11m @ 0.80% Cu from 30m
Slide 14: Exploration Activities
Exploration Activities For personal use only Preliminary reconnaissance work Photo below shows rock samples from Exploration licence: Quartz with cavities with visible gold observed, coarse started: grained and micaceous quartz vein that shows cavities/vague. – Community Engagement – Reconnaissance
Slide 15: Manyoni Uranium Project - Tanzania
Manyoni Uranium Project - Tanzania For personal use only • September 2025 JORC 2012 MRE of 27.19M lbs U3O8 for 136ppm - 25% increase in contained U3O8 13 • Scoping study planned for CY2026 • Drilling has confirmed consistent flat lying mineralisation • Mineralisation within flat lying palaeochannel
Slide 16: Contact
For personal use only ASX:MOM Contact +61 (8) 6166 9107 mal@moabminerals.com.au moabminerals.com.au Level 1, 2A / 300 Fitzgerald Street North Perth, WA, 6006