Stelco — Corporate Update (December 2019)
30 slides from Stelco's corporate update, Dec 11, 2019
Slide 1: Lake Erie Works Community Liaison Committee Meeting
Lake Erie Works Community Liaison Committee Meeting 11 December 2019
Slide 2: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 3: Know Your Emergency Exits
Know Your Emergency Exits Review Evacuation Routes of the room you are located in
Slide 4: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 5: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 6: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 7: Cokemaking Rehabilitation Project
Cokemaking Rehabilitation Project • Work to-date: • Half of battery removed from service to undergo repairs • As a result, only half of the number of coke ovens in service a ffects lea k ra tes recorded in da ily a udits • Minis try of Environment ha s a pproved Stelco’s pla n to minimize emis s i
Slide 8: Cokemaking Rehabilitation Project (2)
Cokemaking Rehabilitation Project (2) • MECP has accepted Stelco’s plan to minimize emissions during the project • Key aspects include: • Continue to conduct daily Method 303 battery audits • Continue to adhere to regular practices on operating side of battery, incl. luting • Installation of water -
Slide 9: Site-Specific Standard Order (Particulates): Performance Review – During Rehabilitation Project
Site-Specific Standard Order (Particulates): Performance Review – During Rehabilitation Project Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Aug 1 – Nov 30, 2019 0.0-10.00% 0.0 – 2.6
Slide 10: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages During Rehabilitation Project Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7%
Slide 11: Site-Specific Standard Order (Particulates): Performance Review – Daily Observations
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – During Rehabilitation Project Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Aug 1 – Nov 30, 2019 Range 0 – 78.33% (Average) (13.30%) August 1 – November
Slide 12: Site-Specific Standard Order (Particulates): Performance Review – Additional Items
Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community complaints for the period of August to November 2019 related to the Site-Specific Standard • Additional: • 1 noise inquiry – related to backup safety alarm of front end loader vehicle • 1 dus
Slide 13: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 14: Capital Projects
Capital Projects • Blast Furnace Re-Line scheduled for Q2 2020 o Modernization of LEW blast furnace • Pig iron ca s ting ca pa bilities o Construction to coincide with blast furnace re-line o Cast excess pig iron into ingots and sell to other steelmakers and/or utilize internally • Cogenera tion o U
Slide 15: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 16: BOF Slag Fines as a Phosphorus Removal Substrate
BOF Slag Fines as a Phosphorus Removal Substrate December 11, 2019 Sean McNamara
Slide 17: Phosphorus Contamination in Lake Erie
Phosphorus Contamination in Lake Erie
Slide 18: Slide 18
Slide 19: Barley Prize Phosphorus Treatment System
Barley Prize Phosphorus Treatment System
Slide 20: Holland Marsh drainage ditch in winter
Holland Marsh drainage ditch in winter
Slide 21: Pumphouse
Pumphouse
Slide 22: Holland Marsh drainage ditch in summer
Holland Marsh drainage ditch in summer
Slide 23: Solidification
Solidification The purpose of a sacrificial cell: CaO(s) + CO2 (g) = CaCO3 (s) Calcium carbonate formation is increased in the filtration system as aqueous CO2 reacts much more readily with solid lime vs gaseous CO2 CaO(s) + H2CO3 (aq) = CaCO3 (s) + H2O (l) Slag replacement is performed based on uni
Slide 24: Phosphorus Removal
Phosphorus Removal Excess lime (CaO) in the slag is highly reactive with a variety of phosphorus compounds, forming calcium phosphate, most of which are adsorbed to the slag substrate while some others precipitate out of solution
Slide 25: Performance
Performance • Three month trial (March – May) • Captured 81% of the total influent phosphorus load • Lab trials have shown capture rates up to 99%
Slide 26: Thank You.
Thank You. stelcocanada.com
Slide 27: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 28: Proposed 2020 CLC Meeting Dates
Proposed 2020 CLC Meeting Dates Wed. Feb. 5 Wed. May 13 Wed. Aug. 12 Wed. Nov. 4
Slide 29: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi
Slide 30: Thank You.
Thank You. stelcocanada.com