  1. Slide 1: Lake Erie Works Community Liaison Committee Meeting

    Lake Erie Works Community Liaison Committee Meeting 11 December 2019

  2. Slide 2: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  3. Slide 3: Know Your Emergency Exits

    Know Your Emergency Exits Review Evacuation Routes of the room you are located in

  4. Slide 4: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  5. Slide 5: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  6. Slide 6: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  7. Slide 7: Cokemaking Rehabilitation Project

    Cokemaking Rehabilitation Project • Work to-date: • Half of battery removed from service to undergo repairs • As a result, only half of the number of coke ovens in service  a ffects lea k ra tes recorded in da ily a udits • Minis try of Environment ha s a pproved Stelco’s pla n to minimize emis s i

  8. Slide 8: Cokemaking Rehabilitation Project (2)

    Cokemaking Rehabilitation Project (2) • MECP has accepted Stelco’s plan to minimize emissions during the project • Key aspects include: • Continue to conduct daily Method 303 battery audits • Continue to adhere to regular practices on operating side of battery, incl. luting • Installation of water -

  9. Slide 9: Site-Specific Standard Order (Particulates): Performance Review – During Rehabilitation Project

    Site-Specific Standard Order (Particulates): Performance Review – During Rehabilitation Project Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Aug 1 – Nov 30, 2019 0.0-10.00% 0.0 – 2.6

  10. Slide 10: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages During Rehabilitation Project Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7%

  11. Slide 11: Site-Specific Standard Order (Particulates): Performance Review – Daily Observations

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – During Rehabilitation Project Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Aug 1 – Nov 30, 2019 Range 0 – 78.33% (Average) (13.30%) August 1 – November

  12. Slide 12: Site-Specific Standard Order (Particulates): Performance Review – Additional Items

    Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community complaints for the period of August to November 2019 related to the Site-Specific Standard • Additional: • 1 noise inquiry – related to backup safety alarm of front end loader vehicle • 1 dus

  13. Slide 13: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  14. Slide 14: Capital Projects

    Capital Projects • Blast Furnace Re-Line scheduled for Q2 2020 o Modernization of LEW blast furnace • Pig iron ca s ting ca pa bilities o Construction to coincide with blast furnace re-line o Cast excess pig iron into ingots and sell to other steelmakers and/or utilize internally • Cogenera tion o U

  15. Slide 15: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  16. Slide 16: BOF Slag Fines as a Phosphorus Removal Substrate

    BOF Slag Fines as a Phosphorus Removal Substrate December 11, 2019 Sean McNamara

  17. Slide 17: Phosphorus Contamination in Lake Erie

    Phosphorus Contamination in Lake Erie

  18. Slide 18: Slide 18

  19. Slide 19: Barley Prize Phosphorus Treatment System

    Barley Prize Phosphorus Treatment System

  20. Slide 20: Holland Marsh drainage ditch in winter

    Holland Marsh drainage ditch in winter

  21. Slide 21: Pumphouse

    Pumphouse

  22. Slide 22: Holland Marsh drainage ditch in summer

    Holland Marsh drainage ditch in summer

  23. Slide 23: Solidification

    Solidification The purpose of a sacrificial cell: CaO(s) + CO2 (g) = CaCO3 (s) Calcium carbonate formation is increased in the filtration system as aqueous CO2 reacts much more readily with solid lime vs gaseous CO2 CaO(s) + H2CO3 (aq) = CaCO3 (s) + H2O (l) Slag replacement is performed based on uni

  24. Slide 24: Phosphorus Removal

    Phosphorus Removal Excess lime (CaO) in the slag is highly reactive with a variety of phosphorus compounds, forming calcium phosphate, most of which are adsorbed to the slag substrate while some others precipitate out of solution

  25. Slide 25: Performance

    Performance • Three month trial (March – May) • Captured 81% of the total influent phosphorus load • Lab trials have shown capture rates up to 99%

  26. Slide 26: Thank You.

    Thank You. stelcocanada.com

  27. Slide 27: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  28. Slide 28: Proposed 2020 CLC Meeting Dates

    Proposed 2020 CLC Meeting Dates Wed. Feb. 5 Wed. May 13 Wed. Aug. 12 Wed. Nov. 4

  29. Slide 29: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Capital Projects Update 6. BOF Slag Fines as a Phosphorus Removal Substrate 7. Communi

  30. Slide 30: Thank You.

    Thank You. stelcocanada.com