Pure Gold Mining — Investor Presentation (February 2021)
27 slides from Pure Gold Mining's investor presentation, Feb 3, 2021
Slide 1: Welcome to the Heart of Red Lake
Welcome to the Heart of Red Lake.
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This Presentation contains forward‐looking statements, including but not limited to statements in Alternative performance measures are furnished to provide additional information. These non- Neither this presentation nor any copy hereof may be distributed in any other juri
Slide 3: North America's newest high-grade gold producer
PureGold is North America’s newest high-grade gold producer. Our growth story has only just begun.
Slide 4: Our first million ounces are now in production
Our first million ounces are now in production. Our Phase One mine is on track for Commercial Production in Q2 2021. 4
Slide 5: One of the highest-grade gold mines on the planet
THE PUREGOLD MINE ONE OF THE HIGHEST-GRADE GOLD MINES ON THE PLANET 9.0 g/t It’s Simple. Higher Grades → Richer Ore and it’s better for the environment too. The gold grades at our PureGold Mine are over 6.5x higher than the global industry average. 1 1.35 g/t Global Industry Average (1) Source: S&P
Slide 6: Building a long-life growth company in Red Lake, Ontario
BUILDING A LONG-LIFE GROWTH COMPANY IN RED LAKE, ONTARIO THE BIRTHPLACE OF GOLD MINING GIANTS >30 M oz +16 g/t Au Red Lake Historic production Average head grade is a rare Tier-One Gold Camp 100 years US$54 Bn Total value of gold mined to in an A century of gold production date 1 OECD Jurisdiction 3
Slide 7: Only two producing mines in Red Lake and we own one
THERE ARE ONLY TWO PRODUCING MINES IN RED LAKE AND WE OWN ONE 7
Slide 8: PureGold is a growth company: 3000 metres and 100 years to go
PUREGOLD IS A GROWTH COMPANY WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production (1) Mineral Resources are inclusive of Mineral Reserves; see Page titled ‘Mineral Reserves & Resources’ for full report tables 8
Slide 9: PureGold is a growth company: 3000 metres to go
PUREGOLD IS A GROWTH COMPANY WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production 1995 HGZ Discovery AD-11-01 14.3 g/t Au / 2.0m Evolution’s current mine plan to ~3000 m depth Note: Conceptual mineralization shapes indicated are conceptu
Slide 10: 8 Zone: our potential game changer
8 ZONE: OUR POTENTIAL GAME CHANGER HIGH-GRADE ZONE AT DEPTH “The ultra-high grade hits in the 8 Zone remind me a lot of the High Grade Zone 8-Zone that built Goldcorp, as well as SMC at Macassa and the Swan Zone at Fosterville. These are the types of discoveries that 8-Zone have the potential to be
Slide 11: Barely scratched the surface along our 7-kilometre trend
WE’VE BARELY SCRATCHED THE SURFACE ALONG OUR 7-KILOMETRE TREND Note: See news releases dated September 26, 2017 and June 18, 2018. Note: Plot includes historic drill hole results which were completed prior to the implementation of National Instrument 43-101. A full discussion and cautionary language
Slide 12: Barely scratched the surface along our 7-kilometre trend
WE’VE BARELY SCRATCHED THE SURFACE ALONG OUR 7-KILOMETRE TREND Note: Plot includes historic drill hole results which were completed prior to the implementation of National Instrument 43-101. A full discussion and cautionary language regarding historic sampling practices can be found in the NI43-101
Slide 13: Our Phase One mine is now producing gold
Our Phase One mine is now producing gold. We’ll be mining here for a long time.
Slide 14: Our Phase One mine by the numbers
OUR PHASE ONE MINE BY THE NUMBERS $2.3B $1.2B $787/oz Revenue 1 Pre-Tax Free Cash Flow 1,2 All in Sustaining Costs (USD) 2 $1,013/oz $1,350/oz 9.0 Margin (USD) 1,2 Margin (CAD) 1,2 Grams / tonne 2,3 #4 #16 Extracting the low hanging fruit Grade in Canada 3 Grade in the World 3 We’ve only just begun
Slide 15: A full-cycle company with a phased organic growth strategy
PUREGOLD IS A FULL-CYCLE COMPANY WITH A PHASED ORGANIC GROWTH STRATEGY Dream ✓ Phase 3 Big. Phase 2 Expansion Target: 1200+ tpd Game-Changing Optimization Exploration Phase 1 Target: 800-1000 tpd • Expand mining and processing capacity Potential Feasibility Study • Establish second mine access • Int
Slide 16: Phase 2 optimization underway
PHASE 2 OPTIMIZATION UNDERWAY EXTRACTING THE LOW-HANGING FRUIT PHASE 2 INITIATIVES TO DATE ONGOING PHASE 2 INITIATIVES • Our mine was designed with a US$1,275/oz gold Initiatives To Date price in mind • Ramp development has • Higher gold prices present an opportunity to been +50% faster than optimiz
Slide 17: Our next million ounces have already been discovered
OUR NEXT MILLION OUNCES HAVE ALREADY BEEN DISCOVERED 2.1 Moz Indicated Resource 1 0.5 Moz Inferred Resource 1 (1) Mineral Resources are inclusive of Mineral Reserves; see Page titled ‘Mineral Reserves & Resources’ for full report tables 17
Slide 18: We are North America's newest high-grade gold producer
We are North America’s newest high- grade gold producer. Our growth story has only Just Begun.
Slide 19: Responsible mining is a duty and a commitment
At PureGold, responsible mining is not an oxymoron. It is both a duty and a commitment.
Slide 20: Responsible mining & sustainability
THE PUREGOLD MINE RESPONSIBLE MINING & SUSTAINABILITY RESPONSIBLE MINING INITIATIVES ENVIRONMENTAL • Landmark First Nations agreements • Hydroelectric grid power RESPONSIBILITY • Electrification of underground • New mill detox circuit and water treatment plant ENRICHING OUR • Air and noise abatement
Slide 21: You're in good company
YOU’RE IN GOOD COMPANY KEY STRATEGIC SHAREHOLDERS +30% OWNERSHIP Eric Sprott #1 Gold Producer in World #3 Gold Producer in World $30 Million Investment Former Red Lake Mine Operator Cornerstone Investor (to 2019) (1) S&P Capital iQ, public disclosure. 21
Slide 22: 2020 was a transformational year
2020 WAS A TRANSFORMATIONAL YEAR FIRST GOLD PRODUCTION ON TIME AND ON BUDGET 22
Slide 23: Key catalysts in 2021
UNLOCKING THE FULL POTENTIAL OF PUREGOLD KEY CATALYSTS IN 2021 H2 2021 • Continue to optimize mine and mill performance and H1 2021 throughput Ramp up mine and mill to • Commence updated technical report based on new steady state throughput of mineral resources 800 tpd • Initiate engineering work fo
Slide 24: Capital structure and analyst coverage
PUREGOLD MINING INC ANALYST COVERAGE JANUARY 2021 CAPITAL STRUCTURE 1 Basic Shares Outstanding 397.5 million Warrants 34.9 million Exercise price $0.85, July 18, 2022 expiry ITM Options Outstanding 13.7 million Fully Diluted ITM Shares Outstanding 446.2 million Fully Diluted ITM Market Capitalizatio
Slide 25: This is what we do. It's in our DNA
THIS IS WHAT WE DO. IT’S IN OUR DNA. RED LAKE EXPERIENCE: 135 YEARS & 10 PROJECTS COLLECTIVELY Board of Directors Executive Management PureGold Mine Site • Graeme Currie, Chairman • Darin Labrenz, President & CEO • David Towle, Mill Manager • Mark O’Dea, Director • Sean Tetzlaff, CFO & Corporate Sec
Slide 26: Mineral resources & reserves
MINERAL RESOURCES & RESERVES THE PUREGOLD MINE MINERAL RESOURCES 1 Indicated Inferred Grade Contained Grade Contained Deposit Tonnes (kt) Deposit Tonnes (kt) (g/t Au) (koz Au) (g/t Au) (koz Au) Madsen 6,429 9.0 1,857 Madsen 889 8.4 241 Fork 203 6.6 43 Fork 331 5.8 61 Russet South 241 7.2 56 Russet S
Slide 27: Thank you
Thank you. Corporate Inquiries Corporate Address TSX.V:PGM , LSE:PUR Darin Labrenz 1900 – 1055 West Hastings Street President & CEO Vancouver, BC OTCMKTS:LRTNF V6E 2E9 www.puregoldmining.ca 604 646 8000 info@puregoldmining.ca
PureGold Mining — Investor Presentation (February 2021) on 6ix