Pure Gold Mining Inc

Pure Gold Mining — Investor Presentation (February 2021)

27 slides from Pure Gold Mining's investor presentation, Feb 3, 2021

  1. Slide 1: Welcome to the Heart of Red Lake

    Welcome to the Heart of Red Lake.

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This Presentation contains forward‐looking statements, including but not limited to statements in Alternative performance measures are furnished to provide additional information. These non- Neither this presentation nor any copy hereof may be distributed in any other juri

  3. Slide 3: North America's newest high-grade gold producer

    PureGold is North America’s newest high-grade gold producer. Our growth story has only just begun.

  4. Slide 4: Our first million ounces are now in production

    Our first million ounces are now in production. Our Phase One mine is on track for Commercial Production in Q2 2021. 4

  5. Slide 5: One of the highest-grade gold mines on the planet

    THE PUREGOLD MINE ONE OF THE HIGHEST-GRADE GOLD MINES ON THE PLANET 9.0 g/t It’s Simple. Higher Grades → Richer Ore and it’s better for the environment too. The gold grades at our PureGold Mine are over 6.5x higher than the global industry average. 1 1.35 g/t Global Industry Average (1) Source: S&P

  6. Slide 6: Building a long-life growth company in Red Lake, Ontario

    BUILDING A LONG-LIFE GROWTH COMPANY IN RED LAKE, ONTARIO THE BIRTHPLACE OF GOLD MINING GIANTS >30 M oz +16 g/t Au Red Lake Historic production Average head grade is a rare Tier-One Gold Camp 100 years US$54 Bn Total value of gold mined to in an A century of gold production date 1 OECD Jurisdiction 3

  7. Slide 7: Only two producing mines in Red Lake and we own one

    THERE ARE ONLY TWO PRODUCING MINES IN RED LAKE AND WE OWN ONE 7

  8. Slide 8: PureGold is a growth company: 3000 metres and 100 years to go

    PUREGOLD IS A GROWTH COMPANY WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production (1) Mineral Resources are inclusive of Mineral Reserves; see Page titled ‘Mineral Reserves & Resources’ for full report tables 8

  9. Slide 9: PureGold is a growth company: 3000 metres to go

    PUREGOLD IS A GROWTH COMPANY WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production 1995 HGZ Discovery AD-11-01 14.3 g/t Au / 2.0m Evolution’s current mine plan to ~3000 m depth Note: Conceptual mineralization shapes indicated are conceptu

  10. Slide 10: 8 Zone: our potential game changer

    8 ZONE: OUR POTENTIAL GAME CHANGER HIGH-GRADE ZONE AT DEPTH “The ultra-high grade hits in the 8 Zone remind me a lot of the High Grade Zone 8-Zone that built Goldcorp, as well as SMC at Macassa and the Swan Zone at Fosterville. These are the types of discoveries that 8-Zone have the potential to be

  11. Slide 11: Barely scratched the surface along our 7-kilometre trend

    WE’VE BARELY SCRATCHED THE SURFACE ALONG OUR 7-KILOMETRE TREND Note: See news releases dated September 26, 2017 and June 18, 2018. Note: Plot includes historic drill hole results which were completed prior to the implementation of National Instrument 43-101. A full discussion and cautionary language

  12. Slide 12: Barely scratched the surface along our 7-kilometre trend

    WE’VE BARELY SCRATCHED THE SURFACE ALONG OUR 7-KILOMETRE TREND Note: Plot includes historic drill hole results which were completed prior to the implementation of National Instrument 43-101. A full discussion and cautionary language regarding historic sampling practices can be found in the NI43-101

  13. Slide 13: Our Phase One mine is now producing gold

    Our Phase One mine is now producing gold. We’ll be mining here for a long time.

  14. Slide 14: Our Phase One mine by the numbers

    OUR PHASE ONE MINE BY THE NUMBERS $2.3B $1.2B $787/oz Revenue 1 Pre-Tax Free Cash Flow 1,2 All in Sustaining Costs (USD) 2 $1,013/oz $1,350/oz 9.0 Margin (USD) 1,2 Margin (CAD) 1,2 Grams / tonne 2,3 #4 #16 Extracting the low hanging fruit Grade in Canada 3 Grade in the World 3 We’ve only just begun

  15. Slide 15: A full-cycle company with a phased organic growth strategy

    PUREGOLD IS A FULL-CYCLE COMPANY WITH A PHASED ORGANIC GROWTH STRATEGY Dream ✓ Phase 3 Big. Phase 2 Expansion Target: 1200+ tpd Game-Changing Optimization Exploration Phase 1 Target: 800-1000 tpd • Expand mining and processing capacity Potential Feasibility Study • Establish second mine access • Int

  16. Slide 16: Phase 2 optimization underway

    PHASE 2 OPTIMIZATION UNDERWAY EXTRACTING THE LOW-HANGING FRUIT PHASE 2 INITIATIVES TO DATE ONGOING PHASE 2 INITIATIVES • Our mine was designed with a US$1,275/oz gold Initiatives To Date price in mind • Ramp development has • Higher gold prices present an opportunity to been +50% faster than optimiz

  17. Slide 17: Our next million ounces have already been discovered

    OUR NEXT MILLION OUNCES HAVE ALREADY BEEN DISCOVERED 2.1 Moz Indicated Resource 1 0.5 Moz Inferred Resource 1 (1) Mineral Resources are inclusive of Mineral Reserves; see Page titled ‘Mineral Reserves & Resources’ for full report tables 17

  18. Slide 18: We are North America's newest high-grade gold producer

    We are North America’s newest high- grade gold producer. Our growth story has only Just Begun.

  19. Slide 19: Responsible mining is a duty and a commitment

    At PureGold, responsible mining is not an oxymoron. It is both a duty and a commitment.

  20. Slide 20: Responsible mining & sustainability

    THE PUREGOLD MINE RESPONSIBLE MINING & SUSTAINABILITY RESPONSIBLE MINING INITIATIVES ENVIRONMENTAL • Landmark First Nations agreements • Hydroelectric grid power RESPONSIBILITY • Electrification of underground • New mill detox circuit and water treatment plant ENRICHING OUR • Air and noise abatement

  21. Slide 21: You're in good company

    YOU’RE IN GOOD COMPANY KEY STRATEGIC SHAREHOLDERS +30% OWNERSHIP Eric Sprott #1 Gold Producer in World #3 Gold Producer in World $30 Million Investment Former Red Lake Mine Operator Cornerstone Investor (to 2019) (1) S&P Capital iQ, public disclosure. 21

  22. Slide 22: 2020 was a transformational year

    2020 WAS A TRANSFORMATIONAL YEAR FIRST GOLD PRODUCTION ON TIME AND ON BUDGET 22

  23. Slide 23: Key catalysts in 2021

    UNLOCKING THE FULL POTENTIAL OF PUREGOLD KEY CATALYSTS IN 2021 H2 2021 • Continue to optimize mine and mill performance and H1 2021 throughput Ramp up mine and mill to • Commence updated technical report based on new steady state throughput of mineral resources 800 tpd • Initiate engineering work fo

  24. Slide 24: Capital structure and analyst coverage

    PUREGOLD MINING INC ANALYST COVERAGE JANUARY 2021 CAPITAL STRUCTURE 1 Basic Shares Outstanding 397.5 million Warrants 34.9 million Exercise price $0.85, July 18, 2022 expiry ITM Options Outstanding 13.7 million Fully Diluted ITM Shares Outstanding 446.2 million Fully Diluted ITM Market Capitalizatio

  25. Slide 25: This is what we do. It's in our DNA

    THIS IS WHAT WE DO. IT’S IN OUR DNA. RED LAKE EXPERIENCE: 135 YEARS & 10 PROJECTS COLLECTIVELY Board of Directors Executive Management PureGold Mine Site • Graeme Currie, Chairman • Darin Labrenz, President & CEO • David Towle, Mill Manager • Mark O’Dea, Director • Sean Tetzlaff, CFO & Corporate Sec

  26. Slide 26: Mineral resources & reserves

    MINERAL RESOURCES & RESERVES THE PUREGOLD MINE MINERAL RESOURCES 1 Indicated Inferred Grade Contained Grade Contained Deposit Tonnes (kt) Deposit Tonnes (kt) (g/t Au) (koz Au) (g/t Au) (koz Au) Madsen 6,429 9.0 1,857 Madsen 889 8.4 241 Fork 203 6.6 43 Fork 331 5.8 61 Russet South 241 7.2 56 Russet S

  27. Slide 27: Thank you

    Thank you. Corporate Inquiries Corporate Address TSX.V:PGM , LSE:PUR Darin Labrenz 1900 – 1055 West Hastings Street President & CEO Vancouver, BC OTCMKTS:LRTNF V6E 2E9 www.puregoldmining.ca 604 646 8000 info@puregoldmining.ca

PureGold Mining — Investor Presentation (February 2021) on 6ix