  1. Slide 1: Update and Review

    Update and Review Joe Ranford – General Manager 1

  2. Slide 2: Premier's Awards – Environmental Excellence in Mining

    Premier’s Awards Environmental Excellence in Mining  Awarded at the SACOME Annual Resource Dinner on 13th April 2015  Special Commendation awarded to Terramin for the work undertaken for the TSF Phytocap Cover design, including vegetation cover trials, landfill cover soil moisture testwork, geotec

  3. Slide 3: Key points for Quarter 1

    Key points for Quarter 1  Closure Plan feedback received from Regulators – May 2015  Currently working through a list of issues which need to be clarified from the Regulators - formal feedback received Tuesday 19th May 2015  4 spot fires along AZM boundary have been attended by CFS in February/Ma

  4. Slide 4: Terramin Upcoming Activities

    Terramin Upcoming Activities  Lime continues to be stored onsite  Normet trials - research and development of equipment  Bird in Hand pre-feasibility and baseline environmental monitoring continues 4

  5. Slide 5: Quarterly Environment Report

    Quarterly Environment Report Environment and Community: Matt Daniel 5

  6. Slide 6: Environment News at AZM

    Environment News at AZM  Care and Maintenance Plan approved 23rd March 2015  2014 MARCR submitted  Currently being reviewed by DSD  Annual TSF audit completed in February  Arsenic trends in TSF D confirmed to be endemic to the region  Employed school leaver as a general helper around site  Pa

  7. Slide 7: Lead deposition and Dust deposition – PM10 for Q1 2015

    PM10 (ug/m3) 10 20 30 40 50 60 0 03/01/2015 10/01/2015 16/01/2015 22/01/2015 28/01/2015 03/02/2015 PEPR Criteria 09/02/2015 15/02/2015 24/02/2015 02/03/2015 Pm10 TSP PM10(Hi-Vol) 05/03/2015 11/03/2015 17/03/2015 23/03/2015 Lead deposition (ug/m3) 0.1 0.2 0.3 0.4 0.5 0.6 0 3/01/2015 10/01/2015 17/01/

  8. Slide 8: Points of interest – Closure Plan

    Points of interest – Closure Plan 1. Mine void recharge 2. Seepage flow rates and TSF decant pond volume 3. Seepage water quality vs. TSF decant water quality 4. Ecosystem Function Analysis 8

  9. Slide 9: Mine void recharge: Groundwater Elevation

    1. Mine void recharge Groundwater model updated Predicted versus Actual Groundwater Level Recovery Time (days) 1 10 100 1000 10000 100 50 0 Groundwater Elevation (m AHD) DH02 bottom of hole -50 Predicted GWL recovery for DH02 Observed GWL in Bore DH02 Predicted GWL recovery Mine Void -100 Observed G

  10. Slide 10: Seepage flow rates & TSF decant pond volume

    2. Seepage flow rates & TSF decant pond volume TSF Seepage Drain Flows Drain 1 Drain 2 Drain 3 Drain 4 Drain 5 Total Flow (L/min) 25.00 20.00  TSF water reports to seepage drains 15.00 through an osmotic Flow rate (L/min) filter 10.00  Water seeps through 1.5mm HDPE liner, this filters many TSF 5.

  11. Slide 11: Zinc content TSF and regional groundwater

    10 12 16 14 0 2 4 6 8 01/04/2009 20/07/2009 01/09/2009 01/01/2010 10/02/2010 17/03/2010 31/03/2010 18/05/2010 06/08/2010 27/08/2010 10/09/2010 01/10/2010 22/10/2010 05/11/2010 19/11/2010 Zinc content Zinc - mg/L (TSF decant pond) 03/12/2010 21/12/2010 12/01/2011 09/02/2011 23/02/2011 09/03/2011 23/0

  12. Slide 12: Lead content TSF and regional groundwater

    0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 01/04/2009 20/07/2009 01/09/2009 01/01/2010 10/02/2010 17/03/2010 31/03/2010 18/05/2010 06/08/2010 27/08/2010 10/09/2010 01/10/2010 22/10/2010 05/11/2010 19/11/2010 Lead - mg/L (TSF decant pond) Lead content 03/12/2010 21/12/2010 12/01/2011 09/

  13. Slide 13: FMEA Risk Assessment of Leakage of TSF over 1000 years

    3. FMEA Risk Assessment of Leakage of TSF over 1000 years  Worst case scenarios modelled over 1000 years  TSF decant water quality, not seepage water quality  no HDPE liner at base  decant pond at highest volume (17ML)  Haven’t allowed for proven ability of the soil to neutralise some acidity a

  14. Slide 14: 1000 year groundwater modelling

    3. 1000 year groundwater modelling TSF “worst case” scenario Modelled zinc plume – worst case scenario of TSF liner failure • TSF decant water • No HDPE liner • 17ML water in decant pond • No adsorption of metals by soils 14

  15. Slide 15: Ecosystem Function Analysis

    4. Ecosystem Function Analysis  First annual EFA survey reported in 2014 MARCR  Assesses Landscape Function, Erosion, and Vegetation  Compared against control site at Betty Westwood Reserve 15

  16. Slide 16: EFA transect sites

    EFA transect sites  “…Use of Ecosystem Function Analysis–  Provides evidence that a site is recovering from an impact (such as mining)  Provides a diagnostic tool  Provides evidence that sustainability is being achieved”  Ministerial Guideline 21: Field guide for landscape function analysis for

  17. Slide 17: Ecosystem Function Analysis 2014 key points

    4. Ecosystem Function Analysis 2014 key points  Soil surface indices positive  Erosion in transects limited  Vegetation growing well  Recommendation: two transects at each site to improve statistical strength Comparison of stability, infiltration and nutrient cycling across the site 80 70 60 Con

  18. Slide 18: Outlook - 2015

    Outlook - 2015  Environmental monitoring as per Care and Maintenance Plan  National Pollution Index report  Ecosystem Function Analysis  Closure Plan feedback incorporation  Infill planting during winter 2015 18

  19. Slide 19: Thanks to Charles for his contributions from 2007 - 2015

    Thanks to Charles for his contributions from 2007 - 2015 19