    Table of Contents 1. Babcock Africa – Roger O’Callaghan 2. CVF Project – Archie Bethel, Babcock Engineering Services 3. Rail – Janette Anderson, First Engineering 4. Networks – Bob Whiley, Eve Group 5. Infrastructure Services – Kevin Thomas/Vice Admiral Peter Dunt 2

  3. Slide 3: Babcock Africa: Investment in South Africa

    Babcock Africa Investment in South Africa • South Africa is the power house of economic development in Sub Saharan Africa • South Africa has a time zone close to that of the UK and English is the language of commerce – this reduces operational management challenges • Europe is our largest trading pa

  4. Slide 4: Investment in South Africa: Macro economic growth forecasts

    Investment in South Africa Macro economic growth forecasts 6.0 5.5 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 World GDP Growth (% p.a.) UK GDP Growth (% p.a.) SA GDP Growth (% p.a.) SA Govt Target (6% by 2009) 4

  5. Slide 5: South Africa

    South Africa • GDP - real growth rate: 4,0% (2005 est.) • GDP - per capita: purchasing power parity - $8,700 (2005 est.) • Inflation rate (consumer prices) – 3.9% (2005 est.) • Prime Bank Rate: 10,5% • Land area - 1,219,912 sq km – slightly less than twice the size of Texas • Natural resources – Gol

  6. Slide 6: Babcock Africa

    Babcock Africa • Babcock Africa Services… Providing training, engineering and technology support to the aviation, energy and process industries. Sole distributor of leading brands in construction and industrial equipment throughout South Africa • Core Values – Integrity – Customer Driven – Motivated

  7. Slide 7: Ownership

    Ownership Babcock International Group plc Babcock Africa Services (Pty) Ltd Babcock Technology Babcock Brands Babcock Babcock Babcock Babcock Babcock Babcock Babcock Ntuthuko Fabrication Engineering Aviation Equipment Rental Welding Sphere Holdings 25% 75% Babcock Africa (Pty)Ltd 7

  8. Slide 8: Financials

    Financials £’000’s 6 months Year End to Sept 2005 March 2005 • Group Turnover 65 305 109 069 • Operating Profit 3 832 5 547 • Operating Cash Flow* 2 888 4 165 • Total Employees at period end 727 642 • Total Average Employees 697 637 * Operating cash flow is cash generated from operations after capit

  9. Slide 9: Broad Based Black Economic Empowerment

    Broad Based Black Economic Empowerment • Black empowerment codes of practice were developed to allow meaningful participation of previously disadvantaged people in South Africa’s economy • Currently the code is practiced by all organs of state and public entities and when gazetted the codes will be

  10. Slide 10: Locations

    NDOLA ZAMBIA Locations GABORONE BOTSWANA WINDHOEK NAMIBIA PIETERSBURG NELSPRUIT RUSTENBURG MIDDELBURG JOHANNESBURG NIGEL MBABANE SWAZILAND WOLMARANSTAD SECUNDA KIMBERLEY RICHARDS BAY BLOEMFONTEIN DURBAN BRANCHES EAST LONDON GEORGE AGENTS CAPE TOWN PORT ELIZABETH 10

  11. Slide 11: Integrated Risk Management

    Integrated Risk Management • The business is committed to adhere to the national standards that govern the management of occupational safety, health, environment, risk assessments and quality • The successful management of Health and Safety is a key management objective. We strive to provide safe an

  12. Slide 12: Africa Divisional Financials

    Africa Divisional Financials • Currently split into two operational divisions • The current contribution of each division is as follows: TECHNOLOGY BRANDS TURNOVER 21% 79% OPERATING PROFIT 27% 73% AVERAGE GROSS MARGIN 21.6% 12.3% ROS 8.4% 6% AVERAGE EMPLOYEES 222 478 12

  13. Slide 13: Babcock Technology

    Babcock Technology • Babcock Engineering – Specialize in the provision of capital plant including steam generators to the energy sector. Services include turnkey construction management and operations, repair and maintenance, spare parts and technical support for Babcock Engineering installed plant

  14. Slide 14: Babcock Brands

    Babcock Brands • Babcock Equipment – Specialize in the sales and support of Earthmoving Machinery – Sole distributors of Volvo, Bomag, Winget & Sullair products • Babcock Plant – Specialize in the hire of equipment into the Mechanical Construction Industry – i.e. Cranes, Welding Machines, Mechanical

  15. Slide 15: Overall Market Share – Equipment

    Overall Market Share – Equipment Total Market 2001 – Nov 2005 45.0% 40.0% 35.0% 30.0% 25.0% 22.9 20.0% 17.7 16.7 15.0% 12.5 10.0% 8.2 7.3 5.0% 5.2 4.9 3.3 1.3 0.0% 2001 2002 2003 2004 Jan - Nov 2005 Bell Equipment Barlow orld Equipment Komatsu SA Liebherr SA Daew oo SA Babcock Bateman Equipment Hita

  16. Slide 16: Future Opportunities

    Future Opportunities • Most of our future opportunities are focussed on prospective government outsourcing plans – Increased maintenance of new and refurbished power stations ₤20m pa – Facilities maintenance within various government and public enterprise departments ₤200m pa – Elementary flying tra

  17. Slide 17: Future Aircraft Carrier Project (CVF) Strategic Context

    Future Aircraft Carrier Project (CVF) Strategic Context “ The 2004 Defence White Paper emphasised the importance of versatile maritime expeditionary forces to project power across the globe in support of British interests and delivering effect on to land at a time and place of our choosing“ “ The tw

  18. Slide 18: Project Scope

    Project Scope • Build 2 New CVF Class Aircraft Carriers to Replace the Existing 3x CVS Invincible Class Carriers; • Project Cost c. £3.5bn; • Weight = 60,000 Tonne Length = 280m; • Preliminary In Service Date Targets – CVF 01 Queen Elizabeth 2012 – CVF 02 Prince of Wales 2015 18

  19. Slide 19: Procurement Strategy: MoD / Industry Alliance

    Procurement Strategy Ministry of Defence / Industry Alliance • The Aircraft Carrier Alliance (ACA) has been established to design and build the two warships • Industry Alliance Partners – Babcock Group – BAE Systems – Halliburton KBR – Thales – VT Group • The ACA is based on best practice models dev

  20. Slide 20: Benefits of Alliance approach

    Benefits of Alliance approach • Recognises that there is no single location in UK capable of building two Carriers • Utilises facilities and skills from around the country • Minimises requirement to ramp up workforce at a single location followed by major downsizing • Optimises the level of new capi

  21. Slide 21: Roles and Responsibilities

    Roles and Responsibilities • Babcock : – Block 1 Construction, – Whole Ship Assembly and Integration (Hook Up). • BAE Systems : – Integration of Design, Build, Commissioning, – Mission Systems, – Leadership of Engineering Team, – Construction of lower Block 3 and 4. • KBR : – Programme Management, I

  22. Slide 22: Build Strategy

    Build Strategy Ramp UB09 UB05 UBLMC UBFGP Upper Blocks all Competed Upper Blocks all Competed Lower Block 4 Lower Block 3 Lower Block 2 LB01 BAE Clyde BAE Barrow VT Group BES UB20 UB15 UB11 UB08 UB05 UBRTP UBNQP UBLMP UBHKP UBFGP 23 11 Lower 18 Block 4 14 07 Lower Block 10 3 06 UB22 UBUXP UB03 25 UB

  23. Slide 23: ACA Commercial Model

    ACA Commercial Model • Alliancing is underpinned by the creation of a common culture focused on best for project decision making • Underlying feature is the principle of Risk Sharing as opposed to Risk Transfer whereby risk lies with the partner most suited to managing the risk • Commercial model in

  24. Slide 24: Babcock Rosyth Alliance Role

    Babcock Rosyth Alliance Role • Representation on the Alliance Management Board • Provision of Facilities and Services at Rosyth to Support Whole Ship Assembly • Construct Front Block of Ship • Participate in Joint Alliance Teams: – Procurement – Stage 3 Design – Whole ship Testing and Commissioning

  25. Slide 25: 60 Acre Basin, Non-Tidal, Sheltered

    60 Acre Basin (24.28 hectares) Non- Tidal, Sheltered Basin Characteristics • Capable of Storing Hull Blocks • Testing and Commissioning Location • Trials in non-tidal environment 457M M • Accommodates both Future512 Aircraft Carriers simultaneously Depth = 13 m 25

  26. Slide 26: CVF Construction and Assembly Sequence

    CVF Construction and Assembly Sequence 2008Time Lines 2009 2010 2011 2012 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 00 17 38 42 48 57 61 Start Start S

  27. Slide 27: Additional Opportunities

    Additional Opportunities • In addition to the work allocated to Babcock through membership of the Alliance we also intend competing for additional work packages including : – Whole Ship Dimensional Control, – Construction of Block bottoms, – Competition for Upper blocks, – Support to major equipment

  28. Slide 28: Summary

    Summary • Involvement in ACA represents a major commercial opportunity for Babcock • Revenue flow from the project will commence in 2006 through involvement in areas such as design and programme planning • Construction activity at Rosyth will commence in 2008 and continue through 2013 • Hook Up , As

  29. Slide 29: First Engineering

    First Engineering Janette Anderson Chief Executive Analyst & Investor Seminar 24 January 2006

  30. Slide 30: Content

    CONTENT 1. Overview of our business 2. Key customers 3. Our competitors 4. Current challenges 5. Our growth strategy 30

  31. Slide 31: Overview of our Business

    Overview of our Business • Re-invention from maintenance based business to project led business • 3 Business Units - £200m turnover – Track – Signalling & Technology – Power,Civils & Facilities • Vision is to double the size of the business in 5 years 31

  32. Slide 32: UK Wide Business

    UK Wide Business Where we are 1 Glasgow 11 Croydon 2: (Perth 12 London 7 ee 13 Romford 5 Edinburgh 14 ‘Derby 6 Manchester 15 Crewe 7 Birmingham 16 Middlesborough 8 York 17 Liverpool 9 Leeds 18 Swindon LO: Wigan 19 Reading

  33. Slide 33: Track Group

    Track Group • Plain Line Track Renewals • High Output Track Renewals • Plant • Consultancy 33

  34. Slide 34: Track Group: Plain Line Track Renewals

    Track Group : Plain Line Track Renewals • Plain line Track Renewals - £72m • Renewal of rail, sleepers, ballast & ancillaries • Scotland & NW 5+5 framework contracts for NR • Double digit growth in 05/06 and similar level projected for 06/07 • Key component for Multi-disciplinary works 34

  35. Slide 35: Track Group: High Output

    Track Group: High Output • Highly mechanised entire track renewals - £23m business • JV with European No.1 H/O specialist • System 2 – 2 yr contract now extended to 5 yrs until March 2009 • System 3 - contract awarded June 2005, until March 2009 • JV offers European opportunities 35

  36. Slide 36: Track Group: Plant

    Track Group : Plant Net £7m turnover business 36

  37. Slide 37: Track Group: Consultancy

    Track Group : Consultancy • Circa £12m turnover business • Range of professional rail focused services • Drives business innovation & improvement • Framework contracts and early access to clients • Utilises partnerships / JVs in target areas • Integrating component of multi-disciplinary projects 37

  38. Slide 38: Signalling & Technology: Signalling

    Signalling & Technology Signalling - circa £37m business (6% of UK market) • Design, installation, test and commission • UK wide projects –WCRM, SAK, Caerphilly • 1st Tier supplier to NR • Scotland & NW 5yr framework contracts for NR • Key component for multi-disciplinary works • Key partner for pro

  39. Slide 39: Signalling & Technology: Technology

    Signalling & Technology Technology (£10m) • Design, installation, maintenance of control, information & telecommunication systems • 1st Tier supplier to Network Rail • Projects / framework contracts in Scotland, NE & NW • Customer base – – Network Rail – Train Operating Companies • Future : non-rail

  40. Slide 40: Power, Civils & Facilities

    Power, Civils & Facilities Power (£13m) • Turnkey Rail projects – electrification & power supply • Growth opportunities – targeting additional project work from £200m+ pa market – utilities and industrial markets – distribution market – railway Overhead Line (short term) Civils (£22m) • Light civils

  41. Slide 41: Power, Civils & Facilities: Facilities Management

    Power, Civils & Facilities Facilities Management (£12m) • Property and M&E maintenance and response • Upgrade Projects • 1st Tier supplier to NR • Projects / framework contracts in Sc, NE, Midlands and London • Customer base – – Network Rail – Train Operating Companies 41

  42. Slide 42: Key Customers & Targets

    Key Customers & Targets • Network Rail • Train Operating Companies, eg ScotRail, Virgin, GNER • Scottish Executive • EWS (English, Welsh & Scottish Railways) • Welsh Assembly • Transport for London • Docklands Light Railway 42

  43. Slide 43: Network Rail's Challenges

    Network Rail’s Challenges • Spend £26bn budget over 5 years • Improve performance by 30% • Implement the renewals programme ~ £2.5bn/year • Safe, efficient and effective delivery essential 43

  44. Slide 44: Network Rail's £26bn budget

    Network Rail’s £26bn budget • Opex £ 5.4bn • Maintenance £ 5.3bn • Non WCRM Renewals £10.3bn • WCRM Renewals £ 2.9bn • ORR funded enhancements £ 1.5bn • Other funded enhancements £ 0.7bn • TOTAL £26.1bn 44

  45. Slide 45: Network Rail's Plan

    Network Rail’s Plan • Smarter long term commercial arrangements • Integrated teams • Fit for purpose… and on budget • Targeted efficiency plans by renewal type 45

  46. Slide 46: Our Competitors

    Our Competitors Who are they ? COMPETENCIES Track High Facilities Competitors Renewals Output Signalling Technology Power Civils Management First Engineering 9 9 9 9 9 9 9 Carillion 9 9 9 9 9 Balfour Beatty 9 9 9 9 9 Amec Spie 9 9 9 9 9 Amey 9 9 9 9 9 Grant Rail 9 9 9 Jarvis 9 9 9 9 9 Serco 9 9 West

  47. Slide 47: Current Challenges

    Current Challenges • Cost Base – Overheads reduction plan • Systems – IFS implementation 2005/06 • Innovation – Non intrusive cross-over • Project work - margins • Culture change 47

  48. Slide 48: Our Strategy for Growth

    Our Strategy for Growth • Organic - partnerships / JVs • New geographies – York, Midlands, London, Ireland • New Customers 48

  49. Slide 49: An Overview of Eve Group's Services & Markets

    An Overview of Eve Group’s Services & Markets 49

  50. Slide 50: Group

    Group Transmission / Telecom Telecom / Consultancy Services Asset Management Telecom Network Maintenance 50

  51. Slide 51: Contribution Towards Company Turnover 2005 - 2006

    Contribution Towards Company Turnover 2005 - 2006 51% 49% £38m turnover £36m turnover Telecom Transmission £3.9m operating £2.2m operating profit profit 51

  52. Slide 52: Communications Services

    Communications Services Mobile Telecom Broadcast 52

  53. Slide 53: Telecom Clients

    Telecom Clients = orange” vodafone ONNECTING PEOPLE SIEMENS NEC P u ; . 2 ae O, ERICSSON 2 -++-f. -VMobiles NORTEL y —— yy ss

  54. Slide 54: Telecom Services

    Telecom Services Antenna, Feeder Network & Steelwork Optimisation Installation Microwave Inspection & Dishes & Maintenance of Waveguides Antennas, Feeders & Structures Tower & Structure Design, Analysis Storage, Logistics Supply & Erection & Material Supply Site Construction, Civils Works BTS/Node B

  55. Slide 55: Telecom Market Share

    Telecom Market Share 15% 21% Eve Eve Other Other companies companies Acquisition, Design & Rigging & Optimisation Construction 6% 16% 14% Eve Eve In-house Other companies Other 80% companies Installation & Maintenance Commissioning 55

  56. Slide 56: Network Care: Market Position

    Market Position 1st Line Network Care 2nd Line Service Centre NOC Equipment I&C Antennas Construct A,D&C Design Acquire Infratec Galliford TCI Alan ICEE DMN NTL THUS NG WirelessEve Campbell 56

  57. Slide 57: Telecom Services: Maintenance and Construction

    Telecom Services Acquisition la de D ep ra ce es R pg ig U n Operations & Maintenance Telecom Construction Services I,C y pl & up I S er w To Rigging 57

  58. Slide 58: Past & Current Telecom Contracts

    Past & Current Telecom Contracts • Roll-out and upgrade of 2G & 3G networks for UK mobile network operators (ca £140m over last 5 years – ongoing contracts) • First UK supplier to provide I&C services direct to a mobile network operator, T-Mobile (ca £1.2m/yr) • ADC contract secured with T-Mobile fo

  59. Slide 59: Broadcast Clients

    Broadcast Clients argiva nationalgrid Wireless Global force in communications

  60. Slide 60: Broadcast Services

    Broadcast Services • Site design • Tower & mast design, supply and erection • Antenna supply • Antenna alignment • Installation • Testing • Commissioning 60

  61. Slide 61: Broadcast: Digital Switchover Project

    Broadcast: Digital Switchover Project • EU directive • Project scope: modification of 1100+ transmitter stations • £50m bids submitted • £10m to be submitted • Project duration 2006 – 2012 • Contract framework to be negotiated Q1 & Q2 2006 61

  62. Slide 62: Past & Current Broadcast Contracts

    Past & Current Broadcast Contracts • Alexandra Palace BBC Transmitter – construction and on- going maintenance (1936 to present day) • Bilsdale TV mast • UHF re-engineering (£3m) • Roll-out of Channel Five (£750k) • Naval submarine communications mast (£18.7m) 62

  63. Slide 63: Key Market Opportunities

    Key Market Opportunities • 3G mobile network build (£1.2bn over 5 yrs) • Mobile network maintenance (£70m over 5 years) • Upgrades on 2G mobile network • Switchover to digital TV (£100m) 63

  64. Slide 64: Transmission Services

    Transmission Services 64

  65. Slide 65: Transmission Clients

    Transmission Clients baboodk “ ; ScottishPower AN gas and electricity Scottish and Southern ‘ Energy plc % National Grid WESTERN POWER == DISTRIBUTION Serving the South West and Wales CE Electric UK NED Northern ji - et —9)//5 Boctrictty al EDFENERGY “a

  66. Slide 66: Transmission Services

    Transmission Services Earth wire Conductor Insulators Tower steelwork Foundations 66

  67. Slide 67: Transmission Market Share

    Transmission Market Share 2% 17% Eve 38% Balfour Beatty AMEC Others 45% 67

  68. Slide 68: Transmission Services

    Transmission Services • Overhead power line design • New build power transmission lines, including tower supply, erection and restringing • Refurbishment of power transmission lines • Installation of optical fibre communications on power transmission lines • Asset management 68

  69. Slide 69: Transmission Services: Maintenance and Construction

    Planning & Engineering D es al en t R sse ew ig n A Maintenance Transmission Construction Services M .A. on R. C ito E. ec er n rin tio Er ow g T Stringing 69

  70. Slide 70: Transmission Innovation & Design

    Transmission Innovation & Design • CARE Degradation modelling software programme • SkySafe™ Scaffoldless re-conductoring system • CTC Composite core conductor 70

  71. Slide 71: London – Mill Hill Route

    London — Mill Hill Route babcock

  72. Slide 72: Complex challenges

    Complex challenges Stable crossing M1 motorway crossing 72

  73. Slide 73: Stable Crossing

    Stable Crossing [Aerial Photo 1:25k - Til = Microsoft Photo Eto ox 28 File Edit View Image Effects Tools Window Help . B| x| 0 x

  74. Slide 74: M1 Motorway Crossing

    M1 Motorway Crossing ( Aerial Photo 1:25k - Tiles TE

  75. Slide 75: Past & Current Transmission Contracts

    Past & Current Transmission Contracts • Construction of UK’s first power transmission networks • Severn river crossing • Construction of UK’s first 400kV transmission line • Highest transmission line in UK – Corrieyairak Pass • Longest temporary 400kV line diversion in UK • Introduction of GAP condu

  76. Slide 76: Key Market Opportunities

    Key Market Opportunities • RETS – construction of new transmission lines from coastal and remote areas to main centres of population (£2.5bn) • Refurbishment of UK power transmission network infrastructure • Refurbishment of networks for Scottish & Southern and Scottish Power • Distribution Network

  77. Slide 77: 77

    77

  78. Slide 78: Prime Contracting – Babcock Infrastructure Services

    PRIME CONTRACTING Kevin Thomas Managing Director Babcock Infrastructure Services Analyst presentation 24th January 2006 78

  79. Slide 79: Babcock Infrastructure Services

    Babcock Infrastructure Services • Formed by Babcock in 2002 by merging newly acquired SGI with three small FM businesses (SGI acquired in June 2002 for £26m) • BIS business represented 6% of Group turnover in 2002/3 which will increase to 17% in 2006/7 • MoD Prime Contracts represent 90%+ of BIS tur

  80. Slide 80: Introduction to Prime Contracting

    Introduction to Prime Contracting The MoD owns one of the largest property estates in the UK Regional Prime Contracts replaced plethora of small advisory, audit and works management contracts used to maintain the estate 5 regional contracts covering all maintenance and works have now been let 2 func

  81. Slide 81: Examples of facilities maintained for MoD

    Examples of facilities maintained for MoD Living accommodation Fuel installations Operational airfields Historic buildings 81

  82. Slide 82: Prime Contracting: Key contract features

    Prime Contracting Key contract features • UK divided into 5 regions • Duration 7 years extendable to 10 • Core Services (OPEX) • Core Works (CAPEX) • Output Specification • Maximum Price Target Cost ¾ Pain / Gain Share • Open book accounting • TUPE 82

  83. Slide 83: Prime Contracting: Scope of work

    Prime Contracting Key contract features Scope of work: • Help Desk 1 • Reactive maintenance • M&E Servicing • Planned maintenance • Management of information – Develop and maintain asset register – Condition surveys – Statutory inspections – Health and Safety 4 • Energy and utility management 5 • Gr

  84. Slide 84: Regional Prime Contract Scotland

    1 Regional Prime Contract Scotland 1 – Contractor: Amec Turner – Assets: 9,000 – Value: £460 million – Start date: March 2003 84

  85. Slide 85: Regional Prime Contract South West

    2 Regional Prime Contract South West – Contractor: Babcock & Bovis – Assets: 7,222 – Value: £500 million – Start date: June 04 2 85

  86. Slide 86: Regional Prime Contract South East

    3 Regional Prime Contract South East –Contractor: Interserve & SEC –Assets: 5,695 –Value: £400 million –Start date: November 2004 3 86

  87. Slide 87: Regional Prime Contract Central

    4 Regional Prime Contract Central – Contractor: Carillion- Enterprise – Assets: 7,250 – Value: £550 million – Start date: November 20005 4 87

  88. Slide 88: Regional Prime Contract East

    5 Regional Prime Contract East – Contractor: Babcock DynCorp – Assets: 4,368 – Value: £500 million – Start date: 7 March 06 5 88

  89. Slide 89: Single Living Accommodation Modernisation

    Single Living Accommodation Modernisation UK wide – Contractor: Babcock Bovis – Assets: 9,000 new bedspaces – Value: £460 million – Start date: October 2002 89

  90. Slide 90: Defence Housing Executive - Married Quarters

    Defence Housing Executive - Married Quarters UK wide – Contractor: Carillion – Assets: 43,000 Properties – Value: £551m – Start date: 14 November 2005 90

  91. Slide 91: MPTC formula

    MPTC formula A = al Profit Target Profit Share Line \ Share Line 0/100 ye Target Cost Maximum Price = ! = Cost I £M | 91

  92. Slide 92: Maximum Price Target Cost Formula

    Maximum Price Target Cost Formula • If actual spend is below target cost: ¾ Contractor gets TC profit level plus 30% of saving ¾ DE gets 70% of saving • If actual spend is above target cost: ¾ Contractor gets TC profit level but bears 30% of cost overrun ¾ DE pays 70% of cost overrun • If actual spe

  93. Slide 93: Performance measurement and VFM

    Performance measurement and VFM • Prime Contracting has revolutionised the management of one of the largest property estates in the UK • The total financial savings are in excess of 30% • Comprehensive MI systems inform better estate planning • Administrative costs have halved • Maintenance performa

  94. Slide 94: Other Prime Contracting Opportunities

    Other Prime Contracting Opportunities Education Services: Local Authority Schools DfES Building Schools for the Future Programme Judicial Services: Courts and Police 94