Gpm Metals Inc. · TSXV:GPM
Gpm Metals — Corporate Update (October 2024)
16 slides from Gpm Metals's corporate update, October 2024
Slide 1: GPM Metals 2024 Project Updating
GPM Metals 2024 Project Updating
Slide 2: Management Team
',@ GPM Metals Management Team Daniel Noone (B.Sc. Geology, MBA) - Chairman Mr. Noone has more than 30 years of international mineral exploration and development experience ranging from implementing grass roots programs through to feasibility studi He is currently the VP Exploration and Director of
Slide 3: GPM Capital Structure
a GPM Metals GPM CAPITAL STURCTURE Common Shares Outstanding 125,445,726 Warrants 39,039,584 Options 5,900,000 Shares Fully Diluted 170,385,310 Significant Shareholders: Rosseau Asset Management - 25% Patrick Sheridan - 10% Dan Noone - 5%
Slide 4: Project Highlights: The Eastern Australian Cratonic Edge
Goorm seins PROJECT HIGHLIGHTS The Eastern Australian Cratonic Edge HYC Macarthur River, Mount Isa Mine complex, Century Dugald River Lady Lorreta. Producers and past producers Oxidised Terrestrial Anoxic/Euxinic Witt} } } Evaporites Siliciclasties Deposit Black Shales Mafic Voleanics o ee Le z P Fl
Slide 5: In Ground Value of Major Mines in District
In Ground Value of Major Mines in District • The target size is the upper quartile • Unusual size distribution of deposits • A handful of mega-deposits each surrounded by 2 or 3 small ones
Slide 6: Walker River Highlights
Highlight 1 Walker River, located along the NW trend of hosting world-class McArthur River and Century Zn deposits Highlight 2 The airborne gravity survey was conducted in late 2023. Where covered in MAP Highlight 3 •Data acquired along 250 m spaced E/W flight lines Highlight 4 •Excellent data quali
Slide 7: ecmmename,
Eo) ecmmename,
Slide 8: Walker River Airborne Gravity Survey: Six Targets Generated
2 @ GPM Metals WALKER RIVER AIR BONE GRAVITY SURVEY: SIX TARETS GENERATED. DRILLING PLANNED ON: #1, 2 AND 3 Elevation gD @ 2.20 g/cc Conformed High priority + Associated with previously acquired 2 mGal response * Semi discrete along regional fault, i.e. great structural location * Possibly akin to s
Slide 9: Walker River Airborne Gravity Survey: Target #1 Cross Section
a GPM Metals a WALKER RIVER AIRBORNE GRAVITY SURVEY Target #1 — Cross section 851 2387 N 0.1 \? he °° g/cc Target 1 2km SS
Slide 10: Walker River Airborne Gravity Survey: Targets #1 & #5 Cross Section
o> GPM Metals WALKER RIVER AIRBORNE GRAVITY SURVEY Target #1 & #5 — Cross section 58 3387 E 0.1 w 2 g/cc Target 5 Target 1
Slide 11: Walker River AGG Targets: Radiometrics Govt. vs. GPM Survey
an GPM Metals WALKER RIVER AGG TARGETS: RADIOMETRICS - GOVT. VS. GPM SURVEY 2016 GPM * K (alteration?) noted near targets 1&6
Slide 12: Geochem Adjacent to Target #1
axe PM Metals GEOCHEM ADJACENT TO TARGET #1 > supergene? Transitional? Ca
Slide 13: Walker River AGG Target: Dyke Anomaly
¢ 18 GPM Metals WALKER RIVER AGG TARGET 1 — DYKE ANOMALY Radiometric & Satellite imagery Govt. KUTh ternary * Distinct vegetation difference around Target 1 associated with radiometric response * Why lack of trees? Suggestion of NNE oriented (folded?) bedding
Slide 14: Dyke Prospect
DYKE PROSPECT Satellite image with gravity profile * Gravity high and Tl anomaly associated with distinct vegetation pattern 2 mGal GPM EL - granted GPM EL Application anomaly * Suggestion of truncation in the north by NW oriented drainage DH What is DH? * Ditto in the south (possibly within ELA) TI
Slide 15: Magnetics
9 GPM —e MAGNETICS 2023 GPM RTP 1VD 250 m line spacing
Slide 16: Sale and Purchase Agreement with Rio Tinto
On June 19, 2024, DPG Resources Australia Pty Ltd, a subsidiary of the Company, entered a new Sale and Purchase Agreement with Rio Tinto. This replaces their existing Farm-in Agreement and involves Rio Tinto transferring assets to DPG, including exploration licenses ELs 385 and 24305, and applicatio