Suncor Energy Inc. · TSX:SU

Suncor Energy — Corporate Update (March 2015)

15 slides from Suncor Energy's corporate update, Mar 18, 2015

  1. Slide 1: Adelaide Wind Power Project Update

    Due to changes to the Competition Act, pending regulatory guidance, this document is provided for historical En raison des changements apportés à la Loi sur la concurrence, en attendant l'orientation réglementaire, ce document information purposes only and does not constitute an active or current re

  2. Slide 2: Agenda

    Agenda • Welcome and introductions • Safety moment • Project update- Adelaide • Community update • Other projects update - Cedar Point • Questions • Wrap-up and next steps

  3. Slide 3: Safety moment: Cellphone distractions

    Safety moment Cellphone distractions SUNCOR )

  4. Slide 4: Introduction: Cellphone use

    Introduction Cellphone use • Cell phone use has been increasing over the years • 78% of Canadian households indicated they had a cell phone in 2010, a 4% increase from 2008 • 13% states they use a cell phone and no landline 4

  5. Slide 5: Opportunity: The danger

    Opportunity The danger • Walking and browsing: – 61.2 % of students surveyed at the University of Tsukuba said they frequently collide with passerby's when using mobile devices while walking. • Texting and driving: – “…the impairment a driver experiences using a cell phone equals that of a person dr

  6. Slide 6: Don't drive or walk and text!

    Action Don’t drive or walk and text! • Don’t risk your safety, and the safety of those around you, by checking your cellphone while driving or walking. 6

  7. Slide 7: References

    References Sources • http://www.asiaone.com/News/Latest%2BNews/Digital1/Story/A1Story20130530-426077.html • http://www.stgeorgeutah.com/news/archive/2013/06/03/kessler-distracted-driver-triggers-three-car- accident-two-sent-to-hospital/ • http://www.bloomberg.com/apps/news?pid=newsarchive&sid=aGo6Kk

  8. Slide 8: Project update and summary

    Project update and summary • We are 100% operational • Site restoration and minor adjustments (will be completed in the spring) • Need road bans to be lifted to move the material • Fields need to thaw and dry out to allow effective material movement • Contact information 8

  9. Slide 9: Contact information

    Contact information Adelaide Questions • Email adelaide@suncor.com • Call toll-free 1-866-344-0178, option #3 Operations • Jason Weir- Operations Manager • Phone (226) 626-3517 • Email jweir@suncor.com 9

  10. Slide 10: Community Update

    Community Update 5 aa

  11. Slide 11: Cedar Point Update

    Cedar Point Update

  12. Slide 12: Location Map- Suncor Energy Products Inc.

    Location Map- Suncor Energy Products Inc. Cedar Point Wind Farm Glendale Gustin Grove jThomson Line, GP? T —_ Ra enswood Line | 1@ N lena® ee A _ DGPS! a 5 z 8 ene? Jericho : Kinnaird Road Jericho Road @ Gedar Point Lin ic) Elarton Road Beach, Pwo eo" @ Lake Huron @P Hubbard Line ere, | GY ewes i me

  13. Slide 13: Construction Milestones

    CONSTRUCTION MILESTONES 2015 Activity Feb Mar Apr May Jun Jul Aug Sep Oct Project Survey Mobilization & Start Construction Construct Entrances Install Transmission Line Install Collection System Construct Substation Construct Access Roads Construct Turbine Foundations Turbine Installation Substantia

  14. Slide 14: Contact Information

    CONTACT INFORMATION Emergencies • Dial 9-1-1 or your local emergency response number Cedar Point Questions • Email cedarpoint@suncor.com • Call toll-free 1-866-344-0178 Landowners with leases • Contact Contract Land Services (Bruce Lyle or Earl Moore) Media inquiries • Call 403-296-4000 14

  15. Slide 15: 15

    15

Suncor Energy — Corporate Update (March 2015) on 6ix