Comstock Resources, Inc. · NYSE:CRK

Comstock Resources — Q3 2023 Earnings Presentation

19 slides from Comstock Resources's earnings presentation, Oct 31, 2023

  1. Slide 1: 3rd Quarter 2023 Results

    NYSE:CRK 3rd Quarter 2023 Results OCTOBER 30, 2023

  2. Slide 2: Disclaimer

    Disclaimer This presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements give our current expectations or forecasts of future events. These statements include

  3. Slide 3: 3rd Quarter 2023 Highlights

    3rd Quarter 2023 Highlights • Weak natural gas prices weighed heavily on the third quarter results. • Natural gas and oil sales for the quarter were $316 million (1) • Cash flow from operations was $167 million or 60¢ per diluted share (2) • Adjusted EBITDAX was $209 million • Adjusted net income wa

  4. Slide 4: Western Haynesville Midstream Partnership

    Western Haynesville Midstream Partnership • Comstock is partnering with Quantum Capital Solutions to fund the expansion of its existing Western Haynesville midstream assets • Comstock will contribute the Pinnacle gathering and treating system to the partnership • Quantum will contribute 100% of the

  5. Slide 5: Q3 2023 Financial Results

    Q3 2023 Financial Results $ in millions 5 5

  6. Slide 6: Nine Months 2023 Financial Results

    Nine Months 2023 Financial Results $ in millions 6 6

  7. Slide 7: Natural Gas Price Realizations

    Natural Gas Price Realizations Per Mcf 3Q 2022 4Q 2022 1Q 2023 2Q 2023 3Q 2023 NYMEX Settlement Month Average $ 8.20 $ 6.26 $ 3.42 $ 2.10 $ 2.55 NYMEX Differential (0.48) (0.69) (0.44) (0.29) (0.22) Realized Prices $ 7.72 $ 5.57 $ 2.98 $ 1.81 $ 2.33 $7.72 $5.57 $2.98 $2.33 $1.81 NYMEX Contract Settl

  8. Slide 8: Low Operating Costs / High Margins

    Low Operating Costs / High Margins Operating Costs Per Mcfe / EBITDAX Margin 8 8

  9. Slide 9: 2023 Drilling Program

    2023 Drilling Program ($ in millions) Nine Months 2023 Haynesville Drilling Program Haynesville Bossier Total Gross Net Gross Net Gross Net Third Quarter Nine Months Operated - ` 2023 2023 Drilled 43 32.6 9 8.7 52 41.3 Turned to Sales 50 36.1 7 6.9 57 43.0 ($ in millions) Haynesville Drilling Progra

  10. Slide 10: Balance Sheet

    Balance Sheet Capitalization New Bank Credit Facility ($ in millions) 9/30/2023 Cash and Cash Equivalents $20 $1.5 Billion Senior Secured Revolving Credit Facility: Revolving Credit Facility $345 • $2 billion borrowing base (reaffirmed in October 2023) Secured Debt $345 • Maturity date November 15,

  11. Slide 11: Drilling Inventory

    Drilling Inventory • Average lateral length of location inventory is 8,949 feet • Over 25 years of drilling based on 2023 activity As of September 30, 2023 Haynesville Operated Non-Operated Total Lateral Length Gross Net Gross Net Gross Net WI Net Mft Avg Net ft Up to 5,000 ft 147 117 359 53 506 169

  12. Slide 12: Drilling Statistics

    Drilling Statistics Average Lateral Length (feet) 12

  13. Slide 13: 3rd Quarter Drilling Results

    3rd Quarter Drilling Results Completed 21 operated wells (average lateral length of 10,460 ft.) Bossier with average IP rate of 29 Mmcf/d LL Turned To IP Well Name (feet) Sales (Mmcf/d) Caddo 1 Peters 26-35 #1 9,842 07/10/2023 18 2 Peters 26-35 #2 9,661 07/10/2023 18 3 Nation 26-35 #1 9,832 07/12/20

  14. Slide 14: D&C Costs

    D&C Costs (Laterals > 8,500 ft.) ($ per Lateral Foot) $1,595 $1,561 $1,506 $1,541 $1,446 $1,329 $1,215 $1,026 $1,040 $932 $888 $842 $941 $1,021 $806 $764 $569 $643 $664 $653 $719 $565 $523 $425 $451 $457 $397 2017 2018 2019 2020 2021 2022 2023 Q1 2023 Q2 2023 Q3 Completion Drilling 14

  15. Slide 15: 2023 Outlook

    2023 Outlook • Focused on proving up our Western Haynesville play and continuing to add to our extensive acreage position • Building a great asset in the Western Haynesville that will be well positioned to benefit from the growth in natural gas demand starting in the second half of 2024 • Western Ha

  16. Slide 16: Guidance

    Guidance Guidance 4Q 2023 Production (Mmcfe/d) 1,450 - 1,550 D&C Costs ($ in Millions) $240 - $280 Infrastructure/Other ($ in Millions) $15 - $25 2 Acreage ($ in Millions) $30 - $40 Expenses ($/Mcfe) - Lease Operating ($/Mcfe) $0.24 - $0.28 Gathering & Transportation ($/Mcfe) $0.32 - $0.36 Productio

  17. Slide 17: Hedging Program

    Hedging Program Building 2024 Hedge Program (Mmcf/d) 2023 Total Swaps Q4 250 Collars 250 $3.00 x $10.28 2024 Total Swaps 350 $3.55 Q1 350 Collars 2024 Total Swaps 350 $3.55 Q2 350 Collars 2024 Total Swaps 350 $3.55 Q3 350 Collars 2024 Total Swaps 350 $3.55 Q4 350 Collars 17

  18. Slide 18: Non-GAAP Financial Measures

    Non-GAAP Financial Measures Adjusted Net Income Quarter Ended September 30, Nine Months Ended September 30, $ in thousands except per share amounts 2023 2022 2023 2022 Net income (loss) $ 14,720 $ 351,185 $ 103,517 $ 607,974 Unrealized (gain) loss on hedging contracts (3,932) (33,154) 31 102,616 Los

  19. Slide 19: Non-GAAP Financial Measures

    Non-GAAP Financial Measures Operating Cash Flow Quarter Ended September 30, Nine Months Ended September 30, $ in thousands 2023 2022 2023 2022 Net income (loss) $ 14,720 $ 355,596 $ 103,517 $ 621,063 Reconciling items: Deferred income taxes (benefit) 3,608 78,060 28,878 148,389 Depreciation, depleti

Comstock Resources — Q3 2023 Earnings Presentation on 6ix