Slide 1: Corporate Presentation
Corporate Presentation Advancing a pre-production lithium brine operation in Argentina February 2025 ASX:PUR
Slide 2: Competent Persons Statement and Forward Looking Statements
Competent Persons Statement Forward Looking Statements Statements contained in this announcement regarding exploration results are Statements relating to the estimated or expected future production, operating based on, and fairly represent, information compiled by Mr. Leandro Sastre Salim, results,
Slide 3: Why Invest?
WHY INVEST? LIMITED OPPORTUNITY: Lithium demand will TRIPLE by 2030. Argentina is leading the global lithium expansion. Strategic investors are already moving in. A UNIQUE AND HIGH-GRADE, LARGE-SCALE RESOURCE–1.104Mt @ ATTRACTIVE INVESTOR 505.8mg/L Li1 in the heart of the Lithium Triangle (Tier-1 PR
Slide 4: Focused Strategy: Problem, Solution, Opportunity, Execution
FOCUSED STRATEGY PROBLEM → SOLUTION → OPPORTUNITY → EXECUTION 1. Problem: Growing Global Lithium Demand, but Supply 2. Solution: Conventional Brine Lithium Production in Argentina Constraints • Brine extraction is the most cost-effective method, especially in • Lithium demand is soaring due to elect
Slide 5: Corporate Overview
CORPORATE OVERVIEW CAPITALISATION DATA(1) BOARD OF DIRECTORS A$0.085 82.57m ASX:PUR SHARE PRICE SHARES ON TICKER ISSUE A$7.01M ~A$0.5M ~25.1M Mr Peter Wall Mr Aaron Revelle Mr Tom Eadie Mr Stephen MARKET CAP NET CASH TOTAL OPTIONS ON ISSUE Non-Executive Managing Director & Non-Exec Director Layton C
Slide 6: The Lithium Triangle - Meeting Future Lithium Demand
THE LITHIUM TRIANGLE - MEETING FUTURE LITHIUM DEMAND Prime position in a Tier 1 Address BOLIVIA • More than 50% of the estimated global lithium resources and 40% of current world production is located in the salt flats of Bolivia, Chile and Argentina, an area known as the ‘Lithium Triangle’. RINCON
Slide 7: Argentina – A Tier 1 Address
ARGENTINA – A TIER 1 ADDRESS Emerging as a premier mining jurisdiction in South America Gold • Major Mines: Veladero (Barrick), Cerro Negro (Newmont) – Tier-1 gold producers. • Economic Importance: Mining contributes 0.82% of GDP, 6.1% • Exploration & Growth: San Juan & Santa Cruz host major gold of
Slide 8: Argentina – A Tier 1 Address: Brine Chemistry
ARGENTINA – A TIER 1 ADDRESS The Argentine Salars located within the provinces of Salta, Catamarca and Jujuy have been the focus of significant development activity over the past 5 years. Majority of the area is now consolidated amongst a few companies. Brine Chemistry Li Concentration v Mg/Li Ratio
Slide 9: Rio Grande Sur Project Overview
RIO GRANDE SUR PROJECT OVERVIEW Advancing a Lithium Brine Asset to Production Strategic Lithium Project: 9,260ha in Salta Province, Rio Grande Salar, positioned in Argentina’s Lithium Triangle (for reference, Argosy Minerals' Rincon Project ~2,700ha, MC: A$37.8M). JORC Resource: 1.104Mt LCE @ 50
Slide 10: JORC Mineral Resource Estimate
JORC MINERAL RESOURCE ESTIMATE Brine Resource Avg. Li In situ Li Volume (mg/l) (kt) kt LCE Category (GL) Indicated 215.3 515.1 111.2 591.8 Inferred 194.4 495.4 96.3 512.5 Total 409.7 505.8 207.5 1,104.3 Notes on the Mineral Resource Statement: 1. The effective date of this statement is December 1, 2
Slide 11: Stage 1 Drill Campaign Generating Significant Results
STAGE 1 DRILL CAMPAIGN GENERATING SIGNIFICANT RESULTS To date Pursuit has completed DDH-1 and DDH-2 of the planned Stage 1 Drilling Campaign with substantial lithium results achieved. High grade assays include the following intervals: DDH-1 • 629mg/L (“milligrams per liter of Lithium”) from an inter
Slide 12: Staged Drilling Campaign
STAGED DRILLING CAMPAIGN • DDH-1 and DDH-2 confirmed exceptional South North grades. Resource expansion targets DDH- 3 and DDH-4 at Mito in the north. DDH-5 DDH-7 • Stage 2 includes a DDH-1 pumping well at Maria PW-1 DDH-7 Magdalena, selected due DDH-5 to exceptional DDH-1 results, optimising aquife
Slide 13: TEM / CSAMT Survey Results
TEM / CSAMT SURVEY RESULTS • The interpretation of the TEM and CS-AMT survey results defined the presence of multiple low resistivity layers across the tenements. These layers are considered highly prospective for Lithium brines. • Pursuit’s drilling campaign validated results, confirming multiple h
Slide 14: TEM Survey Results
TEM SURVEY RESULTS • The available drilling and the TEM data suggest that tenements are located on two distinct geological regimes. • The Maria Magdalena and Isabel Segunda tenements have a TEM profile which supports a typical “Salar Core” halite-dominated salar profile. These sequences are are cons
Slide 15: Near Term Production from 250t Operational Pilot Plant
NEAR TERM PRODUCTION FROM 250t OPERATIONAL PILOT PLANT ASX: PUR 15 15
Slide 16: Lithium Carbonate Production from Demonstrated Process
LITHIUM CARBONATE PRODUCTION FROM DEMONSTRATED PROCESS • The processing method of the pilot plant is based on standard industry practices having recently been optimised for Rio Grande brines. • The dynamic simulation yielded the following results: • Effective area required for the solar evaporation
Slide 17: Lithium Carbonate Production from Demonstrated Process
LITHIUM CARBONATE PRODUCTION FROM DEMONSTRATED PROCESS • The pond simulation for the design of the evaporation ponds at site as well as the mass balance simulation for the plant has been completed with multiple different output levels identified. • The results have demonstrated that Rio Grande brine
Slide 18: Evaporation Ponds Proposed Area at Rio Grande
EVAPORATION PONDS PROPOSED AREA AT RIO GRANDE ASX: PUR 18 18
Slide 19: Global Brine Resource Comparison
GLOBAL BRINE RESOURCE COMPARISON 2,000 1,500 Lithium Concentration in Brine (mg/Li) Atacama, Chile Albemarle + SQM – 1400mg/Li Hombre Muerto Rio Tinto – 1200/mg Li Hombre Muerto West 1,000 Sal de Vida Galan – 866/mg Li Rio Tinto – 752/mg Li Rio Grande Sur - Target – 600-700/mg Li Neo Lithium – 790/m
Slide 20: Focused on Growth Pipeline and Project Execution
FOCUSED ON GROWTH PIPELINE AND PROJECT EXECUTION OUR EXECUTION PATH AND GO FORWARD PLAN IS BASED ON MAXIMISING LONG TERM SHAREHOLDER VALUE Q1/Q2 2025 Q4 2025 / Q1-Q2 2026 Q3/Q4 2026 Initial Production & Strategic Growth Feasibility Study & Expansion Commercial Production • Commissioning of 250 tpa p
Slide 21: Lithium Market Demand
LITHIUM MARKET DEMAND Rising EV Adoption Unlocks Major Growth for Lithium Juniors Global lithium demand projections have surged, driven by government mandates, EV adoption targets, and automaker commitments. By 2030, lithium demand could rise 225% to 2.6 million tons LCE, reflecting a 16% CAGR. Unde
Slide 22: Lithium Market Demand
LITHIUM MARKET DEMAND Rising EV Adoption Unlocks Major Growth for Lithium Juniors Citigroup forecasts lithium’s supply glut has peaked, with a market deficit expected by 2026. The last major price surge was driven by just an 8% shortfall, and by 2027, the deficit is set to widen. With lithium demand
Slide 23: ESG – Commitment to Sustainability
ESG – COMMITMENT TO SUSTAINABILITY Pursuit Minerals is committed to creating long-term value for all our stakeholders through integrating ESG best practice into the ongoing development of the Rio Grande Sur Project Transparency & Accountability Constructive Stakeholder Engagement Transparent corpora
Slide 24: Summary & Conclusion
SUMMARY & CONCLUSION Strategically Prospective Asset Growth Potential Emerging Long-term Our People Located Jurisdiction Sustainability JORC Indicated & Stage 1 drilling A highly A Tier-1 lithium Inferred resource confirmed high- Argentina is A phased experienced asset in the heart with geophysical