Bmc Minerals Ltd · ASX:BMC

Bmc Minerals — PDAC 2026 Convention

35 slides from Bmc Minerals's conference presentation, Mar 4, 2026

  1. Slide 1: ASX Announcement: Corporate Presentation

    ASX Announcement 4 March 2026 Corporate Presentation BMC Minerals Ltd. (ASX:BMC) (BMC or the Company) is pleased to release a copy of its latest corporate presentation to delegates at the Prospectors & Developers Association of Canada (PDAC) 2026 Convention. This announcement is authorised for relea

  2. Slide 2: BMC Minerals Corporate Presentation March 2026 PDAC

    For personal use only BMC Minerals Corporate Presentation March 2026 PDAC Ag Au Cu Zn Pb

  3. Slide 3: Important Information

    IMPORTANT INFORMATION Purpose of presentation: This presentation has been prepared by BMC Minerals Ltd. (“BMC” or the “Company”) for information purposes only. This presentation has been provided to you solely on the basis that you (“Recipient”) agree in favour of BMC, their respective related bodie

  4. Slide 4: Important Information: Forward-looking statements

    IMPORTANT INFORMATION Forward-looking statements: This presentation contains “forward-looking statements” and “forward-looking information”, including statements and forecasts which include (without limitation) expectations regarding the financial position of BMC, production targets, industry growth

  5. Slide 5: Metal Equivalent Calculations

    METAL EQUIVALENT CALCULATIONS Metal grade equivalents (reserves): Metal equivalent grade is the sum of the value of the grade of each metal, divided by the price of the metal being used for metal equivalent reporting. Metal grades used for calculations are the diluted mined reserve grades: Ag 138g/t

  6. Slide 6: Canada's Premier Polymetallic Project

    CANADA’S PREMIER POLYMETALLIC PROJECT Kudz Ze Kayah Project - Expected to be Canada’s Largest Silver and Zinc Producer For personal use only High grade, high margin Advanced stage Kudz Ze Kayah (KZK) is host ~US$150m of capital spent to date to a high Probable Ore Reserve with camp and nearby establ

  7. Slide 7: Key Value Drivers at KZK

    KEY VALUE DRIVERS AT KZK Strategic initiatives and priority workstreams for the next 12–18 months For personal use only Permitting Exploration Engineering Construction financing 20,000m of diamond drilling Decision Document for ABM Technical Report refresh in Construction financing and geophysics to

  8. Slide 8: Board Composition

    BOARD COMPOSITION A highly credentialled board with deep experience in mine development, operations and capital markets For personal use only STEVEN MICHAEL MICHAEL MCCLELLAND ALEX CHRISTOPHER NATALIA STRELTSOVA IVAN MULLANY SCOTT DONALDSON DAVID ELLIS Non-Executive Chair CEO & Managing Director Non

  9. Slide 9: Capital Structure

    CAPITAL STRUCTURE Well funded to deliver on our plan for exploration, permitting, feasibility optimisations and engineering design For personal use only BMC Minerals Limited Key metric Major shareholders % held2 Ticker BMC BMC (UK) 64.7% Shares on issue1 ~275m Victor Smorgon Group 10.0% Share price1

  10. Slide 10: Kudz Ze Kayah Project History

    KUDZ ZE KAYAH PROJECT HISTORY Yukon Environmental and Socio-Economic Assessment Cominco Resources BMC acquires the KZK Project Maiden BMC Ore Board (YESAB) recommend to Feasibility Study For personal use only (now Teck Resources) from Teck. Krakatoa Zone Reserve Estimate the Canadian and Yukon revie

  11. Slide 11: High-Grade Polymetallic Mineral Resource

    HIGH-GRADE POLYMETALLIC MINERAL RESOURCE Majority of ABM & Krakatoa Mineral Resource converted to Ore Reserves underpinning the mine plan Probable Ore Reserve size (Moz AgEq)1,2,3 For personal use only ICE DEPOSIT5 107Moz 70Moz 50Moz 50Moz 25Moz Commodity Silver Gold Copper Zinc Lead KUDZ ZE KAYAH P

  12. Slide 12: KZK Feasibility Study Highlights

    KZK FEASIBILITY STUDY HIGHLIGHTS High-grade polymetallic project with compelling economics Annual Reserve For personal use only Ag Metal production1 grade3 Silver equivalent metrics1,2 Initial project life Probable Ore Reserve3 Ag 7.8Moz 138g/t PHYSICALS ~9 years 15.7Mt Au 57koz 1.3g/t Annual produc

  13. Slide 13: Commodity Price Assumptions

    COMMODITY PRICE ASSUMPTIONS Kudz Ze Kayah US$835m NPV7% (pre-tax) based on long term metal price assumptions well below current spot ± 10% price Feasibility For personal use only Consensus Difference between Feasibility Study Spot Difference between Feasibility Study movement Commodity Study long pr

  14. Slide 14: KZK Project Site Overview

    KZK PROJECT SITE OVERVIEW For personal use only 13

  15. Slide 15: Mining Overview

    MINING OVERVIEW Simple, open pit mining and high-grade massive sulphide Probable Ore Reserve  Majority of mining via open pit – 14.0Mt of ore (89% of Probable Ore Reserves) ABM ZONE For personal use only mined via open pits and 1.7Mt of ore (11% of Probable Ore Reserves) extracted via underground m

  16. Slide 16: Processing Overview

    PROCESSING OVERVIEW KZK has a proven flowsheet with flexible concentrate logistics​ Processing and logistics summary Concentrate production For personal use only LOM recoveries and Ag g/t Au g/t Cu % Zn % Pb % concentrate grades 2.0Mtpa; producing ~200ktpa1 of zinc concentrate, ~60ktpa1 copper conce

  17. Slide 17: Offtake Agreements

    OFFTAKE AGREEMENTS Long-term offtake agreements in place with globally recognised partners For personal use only Flexible concentrate offtake Pricing mechanism driven by Ensures future demand and Leveraged to any upside terms during early spot prices de-risks initial operations in commodity pricing

  18. Slide 18: Pre-Production Capital Cost Breakdown

    PRE-PRODUCTION CAPITAL COST BREAKDOWN Low capital cost intensity results in a ~2-year payback period at Feasibility Study pricing For personal use only Capital cost Contingency Open pit mining Area (US$m)1 US$55m US$51m Open pit mining 51 Processing 190 Owner’s and Infrastructure2 111 indirect costs

  19. Slide 19: Operating Cost Breakdown

    OPERATING COST BREAKDOWN KZK is a low-cost operation expected to generate impressive margins Operating cost summary1 Breakdown of All In Sustaining Cost (AISC US$/oz AgEq) For personal use only AgEq basis $0.65 $11.83 Area (US$/oz AgEq) $0.47 $0.91 Sustaining Mining 2.86 capital PMPA $2.15 $9.80 Pro

  20. Slide 20: Path to Mine Investment Decision

    PATH TO MINE INVESTMENT DECISION For personal use only Judicial review Permitting process Final Investment Technical Report Financing process completed on track Decision  Feasibility Study  Regulatory permitting  Key outstanding licences  BMC will explore a economic update applications submitted

  21. Slide 21: Permitting Process Overview

    PERMITTING PROCESS OVERVIEW Kudz Ze Kayah Project permitting well advanced For personal use only Stage 1: Stage 2: Environmental and socio-economic assessment phase Regulatory phase Mining and exploration  Carried out by YESAB  Carried out by the Federal and Yukon government in the Yukon departmen

  22. Slide 22: KZK Project – Finlayson Lake District

    KZK PROJECT – FINLAYSON LAKE DISTRICT The Kudz Ze Kayah Project mineral tenure remains under-explored Finlayson district ICE DEPOSIT1  4 separate polymetallic volcanic-hosted massive sulphide (VHMS) events For personal use only within the district FINLAYSON LAKE DISTRICT  All known deposits either

  23. Slide 23: A High-Margin Polymetallic Project

    A HIGH-MARGIN POLYMETALLIC PROJECT Significant Exploration Upside For personal use only High Grade Underexplored 372 sqkm tenure in the KZK is host to a high Probable Ore Reserve Finlayson district, a region renowned for grade of 597g/t AgEq (silver equivalent)1 its rich volcanic hosted massive sulp

  24. Slide 24: Appendix

    For personal use only APPENDIX

  25. Slide 25: Mineral Resources and Ore Reserves

    MINERAL RESOURCES AND ORE RESERVES Tonnes Ag Au Zn Cu Pb Ore Reserves Classification Mt g/t g/t % % % For personal use only ABM Zone Probable 13.4 131 1.3 5.9 0.9 1.5 Krakatoa Zone Probable 0.6 246 1.9 6.3 0.4 3.1 Total Open Pit Probable 14.0 136 1.3 5.9 0.9 1.6 Krakatoa Underground Probable 1.7 147

  26. Slide 26: Financial Metrics

    FINANCIAL METRICS Pre-tax free cash flows of ~US$246m per annum Pre-tax free cash flow1 US$283m US$283m For personal use only US$272m US$258m US$254m US$230m US$234m ~2-years US$157m Payback period Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Operating costs (per oz AgEq)1,2 US$11.79 US$1

  27. Slide 27: Production Profile

    PRODUCTION PROFILE Average annual production of ~32Moz1,2,3 pa over 8 years of processing Ore processed 3.0 For personal use only 2.2Mt 2.1Mt 2.1Mt 2.2Mt 2.0Mt 1.9Mt 2.0 1.7Mt High-grade feed 1.6Mt Average feed grade 1.0 of 597 g/t AgEq2,3 - Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Ag

  28. Slide 28: Exploration Prospects – ABM Corridor

    EXPLORATION PROSPECTS – ABM CORRIDOR High-grade intersections within 1km of proposed ABM mine For personal use only RHYOLITE PEAK1 (~1km west of ABM) 3.8m from 7.5m 5.1% Zn 128g/t Ag 0.8g/t Au 0.4% Cu 1.3% Pb CHARLIE 4.5m from 20.1m 8.7% Zn 291g/t Ag 1.7g/t Au 0.3% Cu 2.5% Pb 2.4m from 18.3m 6.7% Zn

  29. Slide 29: Exploration Prospects – KZK Project

    EXPLORATION PROSPECTS – KZK PROJECT GP4F – high-grade zinc, silver, gold intercepts For personal use only GP4F (~5km south-east of ABM)  ~5 to10m in thickness 8.9m @ 0.2% Cu, 4.0% Pb, 7.8% Zn,  ~500m down-dip and ~300m strike extent 1.8g/t Au, 117g/t Ag from 71.6m  Remains open both along strike

  30. Slide 30: Substantial ESG Credentials

    SUBSTANTIAL ESG CREDENTIALS ENVIRONMENTAL GOVERNANCE SOCIAL  BMC has received multiple awards for  A politically stable, well-  Multiple Agreements with First Nations For personal use only environmental and social performance established jurisdiction for both  Socio-Economic Participation Agreem

  31. Slide 31: Precious Metals Financing

    PRECIOUS METALS FINANCING Precious Metals Financing – Wheaton Precious Metals Under the terms of the Precious Metals financing, the Company is committed to delivering to Wheaton specified percentages of the Company’s refined gold and refined silver production, if any, as summarized as follows: Time

  32. Slide 32: Non-IFRS Terms

    NON-IFRS TERMS BMC uses certain financial measures to assess how the ABM Mine Project is projected to perform and to plan and to assess the overall effectiveness and efficiency of the potential future mining and processing operation. These financial measures (collectively referred to as Non-IFRS Fin

  33. Slide 33: Non-IFRS Terms

    NON-IFRS TERMS NPV: Net Present Value, is the value of all future cash flows (positive and negative) over the entire life of an investment discounted to the present. NPV analysis is a form of intrinsic valuation and is used extensively across finance and accounting for determining the value of a bus

  34. Slide 34: Exploration Results, Mineral Resources, Ore Reserves and Production Targets

    EXPLORATION RESULTS, MINERAL RESOURCES, ORE RESERVES AND PRODUCTION TARGETS JORC Disclosure The information in this presentation which relates to previously announced exploration results, estimates of Mineral Resources and Ore Reserves, Production Targets and Forecast Financial Information derived f

  35. Slide 35: Contact us

    For personal use only Contact us For more information contact: Michael McClelland | CEO & Managing Director investors@bmcminerals.com ASX:BMC | bmcminerals.com

BMC Minerals — PDAC 2026 Convention on 6ix