Atalaya Mining Copper SA · LSE:ATYM

Atalaya Mining Copper SA — Atalaya Mining — Investor Presentation (November 2015)

31 slides from Atalaya Mining Copper SA's investor presentation, November 2015

  1. Slide 1: Riotinto Copper Project

    RIOTINTO COPPER PROJECT An established operating copper company in Europe November/December 2015

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document invitation to subscribe for or purchase any securities and of economic evaluations; changes in project parameters as (“Presentation”) has been prepared by Atalaya Mining Plc neither this Presentation nor anything contained herein shall plans cont

  3. Slide 3: Uses and Attributes of Copper

    Uses and Attributes of Copper Copper has been in use for 7,000 years • Electricity (wiring, power generators) • Heating (pipes, radiators) Old tech • Household utensils Largest use of • Industrial machinery and equipment copper in • Jewellery a single structure • Electronics (cars, mobile phones, TV

  4. Slide 4: The Case for Copper

    The Case for Copper Copper supply/demand balance  Global copper supply is forecast to be in deficit in 2016 following production cuts and mine disruptions  Production cuts in 2015 resulted from 16% fall in LME prices  Short term demand negligible; medium and longer term much more robust Source: C

  5. Slide 5: Short Term Copper Supply

    Short Term Copper Supply LME inventories trending down from both scrap supply reductions and mine production curtailments  Recent supply has continued to weaken with decreasing grades and disruptions impacting production  Many new projects behind schedule owing to technical complexities, slow ramp

  6. Slide 6: Long Term Copper Supply

    Long Term Copper Supply Supply: growth will continue to be challenged  A growing number of new projects are located in riskier jurisdictions with lack of infrastructure, hence greater capital intensity  Power and water availability increasingly an issue  Declining grades, resulting in higher cost

  7. Slide 7: Short Term Demand for Copper

    Short Term Demand for Copper China offers plenty of growth potential despite slowdown in GDP growth China  China is in transition from an investment- led to a consumer-based economy – lower growth off a higher base  Chinese interest rate cuts are now geared towards stimulating consumer spending Ot

  8. Slide 8: Long Term Demand for Copper

    Long Term Demand for Copper Infrastructure projects for G20 nations will total US$60 trillion by 2030  China and India will account for 50% of global demand by 2020  Estimated that ⅔ of world’s population will live in cities, up from ~ 54% today  Global growth anticipated at 4% YoY between 2013 a

  9. Slide 9: Atalaya – highly leveraged to the copper price

    Atalaya – highly leveraged to the copper price There are no associated discounts. Here’s why:  Operates in politically safe jurisdiction  Low capital intensity project  Low grade but consistent orebody which is well understood  Profitable at current copper prices  Fully financed - no debt  Exp

  10. Slide 10: Project Overview

    Project Overview existing infrastructure refurbished ahead of schedule  Commissioning currently under way – first concentrate produced in Aug 2015  Nominal capacity at 5 Mtpa – expected from Jan 2016  Ramping up to 7.5Mtpa for 37,500tpa Cu in concentrate (Phase 1 Expansion) ahead of schedule and

  11. Slide 11: Existing Infrastructure = low capex

    Existing Infrastructure = low capex Power  Connection to the grid at 31MW HV – site is fully energized Water  5 million m³ of clean water available. Water in pits to be treated and re-used, minimizing use of external water and discharge Tailings  Capacity of ~4 years with minimal work required –

  12. Slide 12: Significant capex savings

    Significant capex savings  $62m direct cost savings  $24m currency related savings  $31m deferred costs (may PRIMARY CRUSHER BEFORE & AFTER be unnecessary) CONSTRUCTION TIME REDUCED from 36 months FINE ORE STOCKPILE BEFORE & AFTER to < 2 yrs FIRST PRODUCTION Achieved in < 1 year instead of 18 mon

  13. Slide 13: Operating Plan Overview

    Operating Plan Overview Q4 and looking ahead to 2016  Ramp-up started in  Key components for 1st  Phase 2 expansion to October - over 90% of expansion received on 9.5Mtpa to be financed production target site from cash flow and/or achieved working capital  Advancing start-up of  Commercial prod

  14. Slide 14: Phase 1 Expansion – 7.5Mtpa

    Phase 1 Expansion – 7.5Mtpa  Engineering and design completed  Mill civil works nearly finished  Mill parts delivered in late November  Expected completion date (mid-2016)  Budget likely to be improved June August November 14

  15. Slide 15: Phase 2 Expansion – 9.5Mtpa

    Phase 2 Expansion – 9.5Mtpa  Anticipate an earlier Phase 2 completion date at lower under way cost to expand production to  Installation will coincide 9.5Mtpa with with production reaching new milling and flotation 7.5 Mtpa capacity  Secondary mill almost complete  Estimated arrival of main comp

  16. Slide 16: Exploration

    Exploration Organic growth potential  Priority exploration targets include existing mineralisation at Cerro Colorado and neighbouring deposits  Minimal exploration conducted at depth where high grade potential exists around historical underground workings  Conceptual studies ongoing on treatment

  17. Slide 17: District Potential

    District Potential World’s largest VMS system  Licences are located at eastern end of the highly prospective Iberian pyrite belt, which extends ~230km between Seville in the east and Atlantic coast near Lisbon in the west  140mt copper ore have been produced from Project Riotinto since Roman times

  18. Slide 18: Corporate Snapshot

    Corporate Snapshot Overview¹ Major Shareholders Atalaya Mining Plc Holder # shares % ISC Exchanges AIM:ATYM / TSX:AYM Urion Mining International (Trafigura) 25,684,344 22.0 Share price (GB pence) 70.0 Share price (CAD) 1.30 Hong Kong Xiangguang International Shares Outstanding 116,679,555 25,588,527

  19. Slide 19: Investment Case

    Investment Case Project de-risked Well positioned to survive low copper price environment Production commencement Fully financed ahead of through Phase schedule and 1 Expansion under budget (7.5Mtpa) A NEW COPPER COMPANY THAT DELIVERS Infrastructure refurbished – Supportive low capital strategic int

  20. Slide 20: Contact

    Contact Alberto Lavandeira Adán CEO Telephone: +34 959 59 28 50 Email: info@atalayamining.com Investor Relations North America Michelle Roth Roth Investor Relations Telephone: +1 732 792 2200 Email: michelleroth@rothir.com Investor Relations UK and Europe Carina Corbett 4C Communications Ltd Telepho

  21. Slide 21: Appendix

    APPENDIX 21 21

  22. Slide 22: Strong Technical & Financial Expertise

    Strong Technical & Financial Expertise Over 36 years’ experience operating and developing mining projects. Former President, CEO and COO of Rio Narcea Alberto Lavandeira Gold Mines (1995-2007), which built three mines including Chief Executive Officer Aguablanca. Director of Samref Overseas S.A (200

  23. Slide 23: Strong Technical & Financial Expertise

    Strong Technical & Financial Expertise Roger Davey Over 40 years’ experience in the mining industry. Former Senior Mining Engineer at NM Rothschild & Sons; former Director, VP and GM, AngloGold (Argentina). Currently a Chairman director of Orosur Mining Inc. and Condor Gold Plc. Non-Executive Over 3

  24. Slide 24: Strong Technical & Financial Expertise

    Strong Technical & Financial Expertise Damon Barber Senior Managing Director of Liberty Metals & Mining Holdings, LLC. Formerly held positions with mining companies and served as the Head of Deutsche Bank's Metals Non-Executive Director Mining investment banking practice in Asia-Pacific. Spent more

  25. Slide 25: Cost Breakdown from NI 43-101

    Cost Breakdown from NI 43-101 (*) Possible savings identified by Behre Dolbear from possible reductions in mining and maintenance contractor charges, lower lime costs and a steepening of pit wall angles to reduce waste mining none of which are assured at this time. (**) Excludes Non operating costs

  26. Slide 26: Reserves and Resources

    Reserves and Resources Open Pit Mineral Reserves and Resources¹ Ore (Mt) Copper (%) Copper (kt) Reserves Proven 39 0.38 148 Probable 84 0.54 458 Total Reserves 123 0.49 606 Resources Measured 48 0.38 180 Indicated 155 0.49 760 Total Measured & 203 0.46 930 Indicated Inferred 2 0.50 10 1. Behre Dolbe

  27. Slide 27: Transaction Impact

    Transaction Impact Shareholder Structure (Post Transaction) Trafigura 100% Liberty Orion Mine Urion Other XGC Minerals Finance Holdings 27.52% 13.98% 21.93% 14.56% 22.01% 4% KEFI Investor Description % ISC Atalaya Minerals Mining Plc Plc One of the world’s leading independent commodity 22.01% 100% t

  28. Slide 28: Transaction Impact (cont’d)

    Transaction Impact (cont’d) Key Investor Rights (post transaction) Company Agreement Terms • Subscription • Pre-emptive right over further issues of equity shares1 XGC Agreement • One board seat2 • Offtake Agreement • Offtake granted over 49.12% of life of mine reserves in the Technical Report Orion

  29. Slide 29: Astor Management

    Astor Management Company Agreement Terms • Exclusive agreement to provide agency services to Company on all concentrate sold Agency Agreement • For the first 932,000 dmt concentrate sales a base marketing fee of EUR11.25/dmt of concentrate sold is payable plus with EMED Marketing additional escalati

  30. Slide 30: Mining Industry in Spain

    Mining Industry in Spain 1 2 6 Significant Mining Rio Tinto Copper Project Aguas Teñidas Infrastructure Copper Copper, zinc Substation located 3 4 Power 1km from mine site 5 10 7 Supplied from Las Cruces 9 SPAIN Aguablanca Copper Nickel, copper Campofrio reservoir 3km away Water 5 6 and Aguas Limpia

  31. Slide 31: eee -ereeeseneagses

    eee -ereeeseneagses

Atalaya Mining — Investor Presentation (November 2015) on 6ix