Hydrogenpro Asa · OSL:HYPRO

Hydrogenpro Asa — Redeye Hydrogen & Fuel Cells Event 2024

16 slides from Hydrogenpro Asa's conference presentation, Sep 24, 2024

  1. Slide 1: Redeye - Hydrogen & Fuel Cells Event

    Redeye - Hydrogen & Fuel Cells Event 24 September 2024

  2. Slide 2: HydrogenPro is a global provider of market-leading, large-scale green hydrogen technology & systems

    HydrogenPro is a global provider of market-leading, largescale green hydrogen technology & systems 1 THE WORLD’S LARGEST ELECTROLYSER • 5.5 MW single stack suitable for renewable energy input • A modular system that can be scaled to any size for large-scale industrial applications • Pressurised hydr

  3. Slide 3: Serving industrial applications and hard-to-abate sectors

    Serving industrial applications and hard-to-abate sectors H2O The world’s largest electrolyzer Renewables Water Game-changing electrode technology  5.5 MW single stack suitable for renewable energy  Significantly lower power consumption needed for input the same H2 output  Modular system that can

  4. Slide 4: Transformational growth since IPO in October 2020

    Transformational growth since IPO in October 2020 IPO (October 2020) FY 2023 Distributor Value chain position Technology owner & OEM 0 MW Manufacturing capacity (p.a.) 500 MW 2nd Generation Electrode technology 3rd Generation NOK 15 mm Backlog NOK 423mm NOK 27mm1 Revenue NOK 568mm 10 # of employees

  5. Slide 5: HydrogenPro delivers 2 of the 10 largest projects estimated to come online in 2025

    HydrogenPro delivers 2 of the 10 largest projects (excl. China) estimated to come online in 2025 (Electrolyser capacity MW p.a.) 800 500 320 250 220 200 200 100 100 100 Project 1 Project 2 Project 3 Project 4 ACES Project 6 Project 7 Salzgitter Project 9 Project 10 Source: IEA “Hydrogen production p

  6. Slide 6: HydrogenPro – among top industry leaders

    HydrogenPro – among top industry leaders Electrolyzer OEM mapping based on delivered capacity and orderbook Challengers Leaders 1–4GW 8 leaders in the overall electrolyzer OEM landscape Orderbook (firm +non-firm)1 400MW–1GW 50–400MW 10–50MW 7 competitive 150+ companies active !"# “challengers” <10MW

  7. Slide 7: A scalable and flexible business model with recurring revenues

    A scalable and flexible business model with recurring revenues Scope of product offering Service and overhaul Electrolyzer Electrolyzer Current technology assembly scope Gas separator skids Plant Lifetime Electrode technology delivery overhaul Technology revenue revenue provider 1 + Remote and digit

  8. Slide 8: Global presence with expansion opportunities

    Global presence with expansion opportunities Pillars of HydrogenPro’s global Pilot testing in Herøya Fabrication facility for fabrication strategy Industrial Site, Porsgrunn, electrodes in Denmark Norway Develop organizational flexibility to serve each individual region  Through HydrogenPro’s own m

  9. Slide 9: Manufacturing capacity of 3rd generation technology increased to 350 MW p.a.

    Manufacturing capacity of 3rd generation technology increased to 350 MW p.a. – operational in Q1 2025 › Optimization work conducted  Increase number of flight bars  Increase drying positions evt. Baths  Evaluate the process time in each bath  Evaluate the use of the control system › Annual capac

  10. Slide 10: 500 MW manufacturing site – Tianjin

    500 MW manufacturing site – Tianjin Key facility facts Modern electrolyzer manufacturing facility in Tianjin Established in 2021. Specializes in manufacturing and assembly of hydrogen systems, including steel systems structures and high-pressure piping Substantial value-add to the Group Tianjin faci

  11. Slide 11: Winning the publicly funded Salzgitter project proves the strength in our business model

    Winning the publicly funded Salzgitter project proves the strength in our business model SALZGITTER PROJECT • 100 MW SIZE & USE • Green steel production • The first development stage of SALCOS receives around € 700 million in federal funding and € 300 million from the state PUBLIC FUNDING government

  12. Slide 12: Large global sales pipeline

    Large global sales pipeline Definition Number of Projects Size (GW) Value ($bn)1 Pipeline • All active projects with received invitation to 154 36.6 10.1 bid last three years Prioritized • Projects HydrogenPro prioritizes • Concluded FEED on 43 7.6 2.4 some projects with high probability to reach FI

  13. Slide 13: HydrogenPro's superior positioning vs. other technologies

    HydrogenPro’s superior positioning vs. other technologies PEM Alkaline High pressure Atmospheric pressure High pressure 3rd Gen Plant efficiency Low cooling need No noble materials Suitable for renewable energy High pressure on O2 Suitable for P2X1 plants Proven for large-scale plants Legend: Best c

  14. Slide 14: HydrogenPro is trailblazing the electrolyzer technology revolution

    HydrogenPro is trailblazing the electrolyzer technology revolution 3rd Generation 2nd Generation High-pressure alkaline system based on next-generation electrode technology 1st Generation High-pressure alkaline systems developed Game-changing technology that allows for significant opex Atmospheric p

  15. Slide 15: Key investment highlights

    Key investment highlights Vast TAM and massive growth potential for green H2 underpinned by secular tailwinds Favorable government policies provide critical support; new end markets unlock a bigger TAM for green H2 HydrogenPro’s 3rd-generation technology drives significant LCOH reductions Technology

  16. Slide 16: Powering innovation. Energizing tomorrow.

    POWERING INNOVATION. ENERGIZING TOMORROW. \4ydrogenPro

HydrogenPro — Redeye Hydrogen & Fuel Cells Event 2024 on 6ix