Wilh. Wilhelmsen Holding Asa Class A · OSL:WWI
Wilh. Wilhelmsen Holding Asa Class A — Wilhelmsen Ship Management — Corporate Update (2010)
26 slides from Wilh. Wilhelmsen Holding Asa Class A's corporate update, Dec 14, 2010
Slide 1: Wilhelmsen Ship Management - Lay Up Management
Wilhelmsen Ship Management - Lay Up Management The first lay-up service provider in the industry to be certified according to DNV Guideline on lay-up of ships - Labuan, East Malaysia 1
Slide 2: Labuan, East Malaysia
Wilhelmsen Ship Management >= Labuan, East Malaysia NN 59) ie More.. _|{ Map [| Satellite | Terrain | wae are Pandemi ° tanguyan osouth Ubian Municipal Taree of Bor aSepe ranglima MtBongao= Sugai Simunul ° ©2009 Google - Map data ©2009 AND, MaplT. Tele Atlas. Europa Technologies - ni 2
Slide 3: Vessel Anchorages in Labuan
Vessel Anchorages in Labuan VESSEL A. MAPLE ACE B. CAMELLIA ACE C. TAMPERE D. FIGARO E. THESEUS F. ATLANTIC BREEZE G. TOURCOING H. PACIFIC BREEZE I. TOSCA A J. RIGOLETTO B K K. SITEAM ACTINIA L. HYUNDAI JAKARTA F M. EPISKOPI N. BAUHINIA EE C D E G H O. KALAMATA P. TAKAMA Q. MOL RHINE R Q I J FF M R.
Slide 4: Location Labuan; East Malaysia (Borneo)
Location Labuan; East Malaysia (Borneo) Anchorage is designated by authorities for laying-up ships in Brunei Bay; bound by the following co-ordinates ( ref BA chart 1844 ): (i) Lat 5 deg 13.5 min North; Long. 115 deg 16.5 min East. (ii) Lat 5 deg 10.0 min North; Long. 115 deg 30.0 min East. (iii) La
Slide 5: Why Labuan?
Why Labuan ? • a secure and sheltered anchorage • located away from the typhoon belt • excellent holding ground in 22m - 30m of water • current condition of less than a knot • Lay-up area for 40 – 70 vessels depending on size We are licensed by Port and Harbour Authorities, Sabah for operating "Lay-
Slide 6: Cross Business Units Cooperation
Cross Business Units Cooperation Following WMS business units involved: • WSS - License holder - Agency services - Chemical supplier • WME - Administration of the electrical components and treatment • WSM/ Cold Lay Up / Lay up operations ( Wilhelmsen Assets Care ) 6
Slide 7: Contact & Contract structure, Labuan
Contact & Contract Kuala Lumpur Ship Owner / Charterer SLA (service level agreement) Steering Committee Monthly Reports Labuan ¾ Budgets WSS – Labuan WSM – Labuan ¾ Lay-up Logistics LICENCE HOLDER (Base Manager) ¾ Business Contracts Agency & Services ¾ Business Liaison Asst. Base Managers ¾ Local li
Slide 8: Background – Why us?
Background – Why us? • Wilhelmsen Maritime Services group of companies have vast experience in all maritime industry segments • ship care is our core business • We provide a complete lay-up solution to all ship owners and third party managers • Our lay up services is in compliance with the DNV Guide
Slide 9: Decision factors
Decision factors • Whether the vessel will continue to trade • Whether laid up only waiting for scrap value to rise – why preserve if vessel is retained only for scrap? • Whether for conversion, upgrading purposes (long term plan) 9
Slide 10: Decision factors: cold or hot lay up
Decision factors • Whether to go for cold lay up or hot lay up? Cost vs Scenario 10
Slide 11: Decision factors: hot vs cold lay up
Decision factors • Hot lay up (best preservation of asset but least favourable in financial terms) • Crewing to maintain • Fuel costs • Fresh Water • Other services cost • Enable safe and secure lay up with all services available • Cold lay up (optimal in terms of financial & physical preservation)
Slide 12: Decision factors: site and provider
Decision factors • Whether lay up site is safe from drastic weather conditions, • Mooring arrangement and security • Whether lay up service provider is competence & provide full range of services • Evaluation of their lay up procedures, whether in compliance with class, maker and insurance guideline
Slide 13: Phases of Lay up
Phases of Lay up De-activation Lay up Re-activation Decision and planning for Safe & Secure anchorage Successful reactivation lay up depends upon a thorough Periodic inspections and accurately recorded Proper de- de-activation (regular testing, inspection, de- de-activation equipment and system turn
Slide 14: Focus areas
Focus areas • Deck equipment • Lifeboats and davits • Engine room Systems containing water • Engine room equipment • Cargo hold & Tan ks preservation 14
Slide 15: Preservation Scope
Preservation Scope Focus areas onboard ships Hull Engine room Accommodation / Bridge Pump room Forecastle areas Bow Thruster rooms Sea Water pipelines Cargo Tanks Water Ballast tanks Deck, Engine and cargo handling equipments 15
Slide 16: Preservation work – onboard our lay up ships
Preservation work – onboard our lay up ships Dehumifier house on deck Portable Generator on deck Watchman cabin on deck GPS & Radio System in Watchmen cabin Engine Room return on dehumifier Dehumifier trunking to FRAMO room 16
Slide 17: Preservation work – onboard our lay up ships
Preservation work – onboard our lay up ships Dehumifier trunking on main engine Bilge alarm control panel cylinder head platform Dehumifier machine onboard Dehumifier trunking to main air compressor platform Dehumifier trunking to main air Dehumifier trunking to purifier room compressor platform 17
Slide 18: Our facilities in Labuan
Our facilities in Labuan WAC office & warehouse in Labuan Crew work boats on standby Warehouse on ground floor Radio room at the Warehouse Administration office in Labuan 18
Slide 19: Our office & facilities in Labuan
Our office & facilities in Labuan • Warehouse • Designated Wharf • 2 working boats • Office premises for 15 staff • Dehumifier units 86 pcs • Bilge Alarm, VHFs, Other Equipment • Fire Alarms 19
Slide 20: Our services - What do we provide?
Our services - What do we provide ? • Lay-up specifications tailored to suit vessel, specific equipment and owner requirements • Comprehensive preservation procedures for: - Engine Room – Accommodation - Deck – Hull • Comprehensive checklist of requirements to preserve the vessel as required by the
Slide 21: Our services - What do we provide?
Our services - What do we provide ? • Classification Society / Flag state compliant Lay-up procedures, audited and certified by DNV • Green Lay Up Certification by DNV • Lay Up Declaration Certification by DNV • Hull Cleaning Services - third party 21
Slide 22: Lay up services in the news – Tradewinds; January 23, 2010
Lay up services in the news – Tradewinds ; January 23, 2010 22
Slide 23: Lay up services in the news – intranet on January 12, 2010
Lay up services in the news – intranet on January 12, 2010 23
Slide 24: Lay up services Advertisement on Tradewinds
Lay up services Advertisement on Tradewinds - March 5 & 19, 2010 24
Slide 25: Manpower Status - Labuan
Manpower Status - Labuan Full capacity vs current capacity Full Capacity Current status 36 units x 3.33 120 116 watchmen 36 units x 1.33 48 48 maintenance Management / Admin 12 12 staff Total Manpower in 180 176 Labuan 25
Slide 26: Thank you for your attention
Part of Wilhelmsen Maritime Services, a Wilh. Wilhelmsen group company Thank you for your attention For detailed enquiries & information: Torbjoern J. Aaker Email: torbjoern.j.aaker@wilhelmsen.com Website: www.wilhelmsen.com/shipmanagement 26