Filo Mining Corp

Filo Mining — Investor Presentation (September 2020)

25 slides from Filo Mining's investor presentation, September 2020

  1. Slide 1: Advancing the Filo del Sol Copper-Gold-Silver Project in South America

    ADVANCING THE FILO DEL SOL COPPER-GOLD-SILVER PROJECT IN SOUTH AMERICA Corporate Presentation – September 2020 A Lundin Group Company www.filo-mining.com TSXV: FIL | Nasdaq First North Growth Market: FIL

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward- Estimates of Mineral Reserves and Mineral Resources looking statements” within the meaning of applicable securities legislation (collectively, “forward-

  3. Slide 3: Filo Mining Corp. Company Profile

    FILO MINING CORP. COMPANY PROFILE South American Advanced Exploration 7% Company SHARE OWNERSHIP Top 5 Institutional Holders 36% Lundin Trusts CAPITAL STRUCTURE Board & Management 53% FIL TSXV, Nasdaq First North Growth Market Other $1.85 Share Price (CAD) 4% 110 M Issued & Outstanding Shares $203 M

  4. Slide 4: Filo del Sol Project

    FILO DEL SOL PROJECT Filo del Sol hosts a high-sulphidation epithermal copper-gold-silver deposit associated with a large porphyry copper-gold system. Located in San Juan, Argentina & Chile » Pro-mining jurisdictions » Mining Integration and Complementation Treaty for cross-border projects » 12 km a

  5. Slide 5: Investment Highlights

    INVESTMENT HIGHLIGHTS UNPARALLELED GROWTH POTENTIAL Lukas Lundin commented, Existing Cu-Au-Ag resource, backstopped by a robust oxide “…the potential size and scale project. of the Filo del Sol deposit is unparalleled to any project I have been involved with … Our drill results this season are Outst

  6. Slide 6: Exploration

    EXPLORATION Filo Mining | Corporate Presentation

  7. Slide 7: 2019 / 2020 Field Program Summary

    2019 / 2020 FIELD PROGRAM SUMMARY 2019 / 2020 Program » Approximately 8,000m of drilling completed prior to curtailment of the drilling program » Drone magnetometer & 3D induced polarization ("IP") geophysical surveys Targets Filo Deep Area Tamberias West Filo North Testing porphyry Recently permitt

  8. Slide 8: 2019 / 2020 Select Drill Results

    2019 / 2020 SELECT DRILL RESULTS HIGHLIGHT HOLES: FSDH032: total FSDH034: total FSDH038: » All holes ended in strong copper-gold intercept of intercept of highlight mineralization 1,009m @ 1,034m @ intercept of 73m » Three holes are now in excess of 1 0.95% CuEq 0.68% CuEq @ 2.04% CuEq kilometres de

  9. Slide 9: Sections on Holes 25, 34, and 32

    SECTIONS ON HOLES 25, 34, AND 32 Moving South to North (1km total span) FSDH25 FSDH34 FSDH32 +500m N of Hole 25 +500m N of Hole 34 Slide 9 Filo Mining | Corporate Presentation

  10. Slide 10: Comparison with Global Copper Intercepts

    COMPARISON WITH GLOBAL COPPER INTERCEPTS Best holes over the past 12 months with Copper as the primary commodity CuEq Grade x Date Hole Number Project Country Company From (metres) To (metres) Interval (metres) CuEq (%) Source Document Interval¹ (%-m) 2020-02-24 VHD037 Onto Indonesia PT Sumbawa Timu

  11. Slide 11: 2019 / 2020 Results

    2019 / 2020 RESULTS SIGNIFICANT INTERSECTIONS OUTSIDE OF THE RESOURCE PIT SHELL Intersections by hole OUTSIDE of resource pit shell Hole ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t CuEq % FSDH029 180.0 800.1 620.1 0.22 0.27 1.8 0.43 FSDH027 70.0 545.4 475.4 0.23 0.29 2.0 0.46 FSDH026 240.0 613.

  12. Slide 12: Development of an Exploration Target

    DEVELOPMENT OF AN “EXPLORATION TARGET” BASED ON PREDICTED VOLUMES AND AVERAGED GRADES FROM SAMPLING THE DEEP DRILLING » This target is in addition to the current resource and does not include prospective areas to the north & south » Surface data suggests centre of the system lies between holes FSDH0

  13. Slide 13: Positive PFS (Jan 2019)

    POSITIVE PFS (JAN 2019) Filo Mining | Corporate Presentation

  14. Slide 14: Filo del Sol – PFS Results Summary

    FILO DEL SOL – PFS RESULTS SUMMARY Cu Copper After-Tax NPV (8%) $1.28b Avg. Annual Cu Production 67 kt Au Gold After-Tax IRR 23% Payback 3.4 Yrs Avg. Annual Au Production 159 koz Ag Silver C1 Cash Cost $1.23/lb CuEq Avg. Annual Ag Production 8,653 koz Slide 14 Filo Mining | Corporate Presentation

  15. Slide 15: Next Steps

    NEXT STEPS Geophysical data interpretation, update geological model, develop integrated 3D geology based geophysics model Ongoing environmental work in support of project permitting Initiate preliminary metallurgical testwork on the sulphide material Planning for next season – 2020 / 2021 drill camp

  16. Slide 16: Conceptual 2020 / 2021 Drill Program

    CONCEPTUAL 2020 / 2021 DRILL PROGRAM Rationale » Additional deep holes – dramatically expands the system if successful » Holes 36, 37, 38 & 39 are advanced and may be able to be re-entered » Potential to go even deeper (~1,500m+) as all historic holes have ended in mineralization » Goal – Double cur

  17. Slide 17: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING JAMIE BECK BOB CARMICHAEL JEFF YIP President & CEO Vice President Exploration Chief Financial Officer » More than 15 years of international » Also Vice President Exploration of » Also CFO of NGEx Minerals Ltd. project m

  18. Slide 18: Strong & Reputable Board

    STRONG & REPUTABLE BOARD EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS ADAM LUNDIN ALESSANDRO BITELLI ERIN JOHNSTON Chairman » Over 30 years of experience in the resource » Current Managing Director of the industry and in public accounting, both in North Lundin Foundation, a

  19. Slide 19: A Lundin Group Company

    A LUNDIN GROUP COMPANY Creating Value for Shareholders The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% Lundin Mining Red Back

  20. Slide 20: Contact Us

    Filo Mining | Corporate Presentation CONTACT US filo-mining.com Filo Mining Corp. Suite 2000 - 885 West Georgia Street Vancouver, BC, V6C 3E8 Canada FOR MORE INFORMATION CONTACT Amanda Strong Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filo-mining.com reriksson

  21. Slide 21: Appendix

    APPENDIX Filo Mining | Corporate Presentation

  22. Slide 22: Indicated and Inferred Resource

    INDICATED AND INFERRED RESOURCE Cu 3.1 Billion lbs Cu Copper INDICATED Cu INFERRED 1.0 Billion lbs Au 4.4 Million oz Au Gold INDICATED Au INFERRED 1.8 Million oz Ag 146.9 Million oz Ag Silver INDICATED Ag 34.8 Million oz INFERRED Refer to slide 23 for additional details regarding the reporting of th

  23. Slide 23: Mineral Resource

    MINERAL RESOURCE Tonnes Cu Au Ag Lbs Cu Ounces Au Ounces Au Zone Cutoff Category (millions) (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 349.6 0.34 0.32 12.6 2,656 3,623 141,364 Oxide * See notes Inferred 103.9 0.26 0.32 8.7 585 1,083 29,067 Indicated 75.5 0.27 0.34 2.2 451 813 5,374

  24. Slide 24: Pre-Feasibility Results

    PRE-FEASIBILITY RESULTS FILO DEL SOL – PFS RESULTS – January 2019 Pre-Tax NPV (8%) ($B) $1.86 ANNUAL METAL Pre-Tax IRR (%) 27% PFS METALS PRODUCTION PROFILES After-Tax NPV (8%) ($B) $1.28 PRICES Payable Copper After-Tax IRR (%) 23% ASSUMED 90 80 70 Undiscounted After-Tax Cash Flow ($B) $3.23 60 Tonn

  25. Slide 25: Probable Mineral Reserves

    PROBABLE MINERAL RESERVES FILO DEL SOL MINERAL RESERVE STATEMENT (@ 0.01 $/T NVPT CUT-OFF) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.1 0.39 0.33 15.1 25.30 2,226 2,764 126,028 Total

Filo Mining — Investor Presentation (September 2020) on 6ix