St. George Mining Ltd. · ASX:SGQ

St. George Mining — Sharewise webinar (September 2025)

30 slides from St. George Mining's conference presentation, Sep 3, 2025

  1. Slide 1: ASX Release: Webinar Presentation

    ASX RELEASE. 3 September2025 WEBINAR PRESENTATION ST GEORGE MINING WEBINAR WITH SHAREWISE St George Mining Limited (ASX: SGQ) (St George or the Company) is pleased to issue the Webinar Presentation that will be discussed in the online webinar to be hosted by Sharewise today at 11am AEST/9am AWST. Al

  2. Slide 2: ASX Release: Niobium and rare earths resource

    ASX RELEASE. Page 2 of 3 A world-class rare earths and niobium resource was announced by St George on 1 April 2025: Niobium – total resource: 41.2 Mt at 0.68% Nb₂O₅ (6,800ppm Nb2O5) comprising (at a cut-off of 0.2% Nb₂O₅): Resource Classification Million Tonnes (Mt) Nb₂O₅ (%) Measured 1.90 1.19 Indi

  3. Slide 3: ASX Release: Forward looking statements

    ASX RELEASE. Page 3 of 3 This ASX announcement contains information related to the following reports which are available on the Company’s website at www.stgm.com.au: • 1 April 2025 Maiden High-Grade Niobium and Rare Earth Resource Estimate for the Araxá Project, Brazil The Company confirms that it i

  4. Slide 4: Niobium. Rare earths. World class.

    Webinar Presentation 3 September 2025 Niobium. Rare earths. World class.

  5. Slide 5: Disclaimer

    Disclaimer Forward-Looking Statements: This Presentation may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning St George’s planned exploration program and other statements that are not historical facts. Although St George believes t

  6. Slide 6: Investment Highlights Araxá Project

    Araxá Project St George – aInvestment becomes global player inHighlights niobium and rare earths with the 100% acquisition of the advanced and de-risked niobium-REE Araxá Project in Minas Gerais, Brazil Advanced and de-risked world-class niobium-REE opportunity • JORC resource1 announced by St Georg

  7. Slide 7: World class resource and location

    World class resource and location ASX: SGQ | St George Mining Limited 4

  8. Slide 8: World-class JORC resource

    World-class JORC resource1 Globally significant niobium and rare earths deposits Niobium resource TREO resource 41.2 Mt at 0.68% Nb₂O₅ (6,800ppm Nb₂O₅) 40.6 Mt at 4.13% TREO (41,300ppm TREO) comprising (at a cut-off of 0.2% Nb₂O₅): comprising (at a cut-off of 2% TREO): Classification Million tonnes

  9. Slide 9: Favourable location

    Favourable location Outstanding project logistics support fast-track development MOSAIC Facilities St George’s ARAXÁ Project Favourable project logistics support expedited pathway to development: Located in Minas Gerais – a Tier 1 mining jurisdiction Mineralisation hosted in the 5km-wide Barreiro Ca

  10. Slide 10: Favourable deposit characteristics

    Favourable deposit characteristics Free-digging mineralisation from surface supports open-pit mine Grades up to 82,970ppm (8.29%) Nb₂O₅ and 329,800ppm (32.98%) TREO with results that include:1  43m @ 1.5% Nb2O5 from surface  60m @ 11.1% TREO from surface  20m @ 2.4% Nb2O5 from surface incl. 30m @

  11. Slide 11: Expansion drilling underway

    Expansion drilling underway +10,000m drilling program in progress • Auger drilling – first pass reconnaissance drilling 1km east of MRE has discovered a new high-grade rare earths zoner with grades upto 13.4% TREO1 • 2,700m of RC drilling; mostly resource definition drilling to upgrade Inferred to I

  12. Slide 12: Carbonatite REE deposits

    Carbonatite REE deposits Competitive advantages Araxá REE deposit is carbonatite-hosted The two major producing rare earths mines outside of China are carbonatite hosted deposits – the Mountain Pass mine in California and Mt Weld in Western Australia Carbonatite hosted rare earths deposits are typic

  13. Slide 13: Project delivery – highly experienced team

    Project delivery – highly experienced team ASX: SGQ | St George Mining Limited 10

  14. Slide 14: Project Delivery Team

    Project Delivery Team In-country experts with combined +100 years experience Brazil Team Director, Corporate Development: Caue (Paul) Araujo Experienced natural resources executive, previous roles include Global Director, ESG and Technical Development: Thiago Amaral General Manager (Mine Finance) at

  15. Slide 15: Supportive State Government

    Supportive State Government MoU signed to expedite project approvals Expedited Licensing: St George on 30 October 2024 signed a non-binding Memorandum of Understanding with the State of Minas Gerais (Invest Minas) The State will assist with progressing regulatory approvals in an accelerated manner i

  16. Slide 16: Community engagement

    Community engagement St George contributes to the community The community in and around Araxá is experienced in the permitting of mining operations and working closely with mining companies  Strong support shown for St George with aim of ensuring sustainable project development, long- term jobs St

  17. Slide 17: Development partnerships

    Development partnerships Processing, product development and marketing MagBras – Permanent magnet making facility in Brazil St George is a first mover in Brazil’s emerging rare earths supply chain making the first delivery of rare earths material to MagBras for magnet making testwork MagBras is a pu

  18. Slide 18: Critical metals with favourable market dynamics

    Critical metals with favourable market dynamics ASX: SGQ | St George Mining Limited 15

  19. Slide 19: Niobium – Future Facing Commodity

    Niobium – Future Facing Commodity Essential for modern high-tech applications and weapons Niobium is produced into Ferroniobium (88% of demand) and Niobec Niobium oxide (12%)1 Quebec, Canada Ferroniobium Niobium Oxide 9% CMOC • Widely used in the steel • Niobium oxide is produced Goias, Brazil indus

  20. Slide 20: Rare earths – fragile supply chains

    Rare earths – fragile supply chains Geopolitical background creates opportunity for emerging producers outside China 6.0% Mountain Pass, Company St George Lynas MP Arafura MP.NYSE Market cap and A$131 million A$13 billion US$12.6 billion A$552 million Operating stock exchange ASX: SGQ ASX: LYC NYSE:

  21. Slide 21: Development initiatives underway

    Development initiatives underway Strong newsflow • Two mining concession applications and one exploration permit. Licencing progresses Permitting Process in 2025 and 2026 • Engagement with Government, community and licensing authorities. Q2 to Q4 2025 – new • St George commenced expansion and resour

  22. Slide 22: Company Overview

    Company Overview Led by an experienced Board, the share price has responded favourably to the Araxá acquisition Company Snapshot ASX Code SGQ Share Price (15 July 25) A$0.05 Shares on Issue 2,921,600,905 Market Capitalisation1 A$146m Listed options (SGQOC)2 966,111,025 Listed options (SGQO)3 39,188,

  23. Slide 23: Building a globally significant niobium-REE mining company

    ST GEORGE MINING LIMITED Building a globally significant niobium-REE mining company ASX: SGQ | St George Mining Limited 20

  24. Slide 24: Appendix A - References

    Appendix A - References Slides 3 and 5: Slide 16 1. See our ASX Release dated 1 April 2025 entitled “High-Grade Niobim and REE 1. Mordor Intelligence, Global Niobium Market 2022-2029. JORC Resource for Araxa” for details on the JORC resource. Slide 17 Slide 6 For details of the chart and table of RE

  25. Slide 25: Appendix B – Key Risks

    Appendix B – Key Risks The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it operates as w

  26. Slide 26: Appendix B – Key Risks (continued)

    Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o

  27. Slide 27: Appendix B – Key Risks (continued)

    Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o

  28. Slide 28: Appendix C – References to previous announcements

    Appendix C – References to previous announcements This ASX announcement contains information extracted from the following reports • 5 March 2025 Niobium and Downstream Processing Study at Araxa which are available on the Company’s website at www.stgm.com.au: • 1 April 2025 High-grade Niobium and REE

  29. Slide 29: Competent Person Statement

    Competent Person Statement Competent Person Consent - MRE The information in this Presentation that relates to Mineral Resource Estimate and historical/foreign results is based upon, and fairly represents, information and supporting documentation reviewed and compiled by Mr. Beau Nicholls, a Compete

  30. Slide 30: Competent Person Statement

    Competent Person Statement Competent Person Consent - Historical and Foreign Results The information in this Presentation that relates to historical and foreign results is based upon, and fairly represents, information and supporting documentation reviewed by Mr. Carlos Silva, Senior Geologist emplo

St George Mining — Sharewise webinar (September 2025) on 6ix