Alaska Hydro Corp. · TSXV:AKH.H

Alaska Hydro — Investor Presentation (August 2019)

21 slides from Alaska Hydro's investor presentation, August 2019

  1. Slide 1: More Creek Hydro Electric Project

    MORE CREEK HYDRO ELECTRIC PROJECT Green Power Generation In Northwestern British Columbia

  2. Slide 2: Project Details

    Project Details • The More Creek project will have a 75 MW hydro electric generator plant and a 84 m high and 300 m wide poured concrete arch dam producing 448 Gwh of electricity annually • The Power House will be on surface and is approximately 400 metres downstream from the More Creek storage dam.

  3. Slide 3: Project Details (cont.)

    Project Details (cont.) • The tailrace discharge will flow back into the More Creek main channel at its confluence with Iskut River. • The reservoir will extend almost 20km upstream and inundate 2880 ha. It will have a live storage capacity of 870 million cubic metres of water

  4. Slide 4: More Creek Canyon

    ’ More Creek Canyon :

  5. Slide 5: Project Location

    Project Location • The More Creek project is located 985km Northwest of Vancouver, 130km North of Stewart BC, • Road Access is 12 km off Highway 37 at Bob Quinn Lake via the old Eskay Creek mine and NovaGold’s Galore Creek access roads • Interconnection to B C Hydro’s Northwest Transmission line wil

  6. Slide 6: Project Location (cont.)

    Project Location (cont.) • The More Creek project is located on the traditional territory of the Tahltan First Nation • The More Cree Creek project shares the Iskut River watershed with AltaGas’ 195 MW Forrest Kerr Project, 19.5 Volcano Creek and 66 MW McLymont Creek projects.

  7. Slide 7: Project Status

    Project Status. • Prefeasibility Study completed with positive results. Optimizing revenue potential and capital costs underway • Project Description, the first step in the Environmental Review Process completed, filed and circulated to public, stake holders and First Nations. • Estimates of carbon

  8. Slide 8: Project Status (cont.)

    Project Status (cont.) • Forrest Kerr project has potential to increase capacity utilization with managed water release from the More Creek project • More Creek Dam Facility Can maximize and optimize Alta Gas’ daily Peak Production • Proposed Dam Facility Can Provide BC Hydro With Added Power At Pea

  9. Slide 9: Project Economics

    Project Economics • Estimated Permitting Cost…$3 million • Estimated Construction Costs including construction financing $238 million • IRR 33.61% • Net Present Value $154 at 10% discount. • Average annual revenue $44.8 million at $0.10 kwh • Average annual generation 448 Gwh 9 11-Aug-19

  10. Slide 10: Project Opportunities

    Project Opportunities • Expansion to 175 MW and 700 GWh annually based on B C Hydro’ preliminary design for More Creek • More Creek will generate clean green renewable energy which will give the Company the opportunity to sell Renewable Energy Credits. The value to generators using coal is approxima

  11. Slide 11: Project Opportunities (cont.)

    Project Opportunities (cont.) • Project financing could be structured to use accelerated flow-through write off • AltaGas’ 195 MW Forrest Kerr run of river plant, down stream of More Creek could benefit from water regulation and increase generation by 149 Gwh annually. • Additional revenue potential

  12. Slide 12: Aerial View

    Aerial View Iskut River More Creek Forest Kerr Site, 40 km downstream Forrest Kerr Access Road Bob Quinn Hi-way 37 Airstrip 12 11-Aug-19

  13. Slide 13: Company Details: Board of Directors

    Company Details Board Of Directors Cliff Grandison, Director, Co-Chair and President • Mr. Grandison has been a self-employed consultant since 1992. He served as CEO and as a director of Coast Mountain Power Corp. from incorporation in November 2000 until September 2006 at which time the Company was

  14. Slide 14: Board of Directors: Cliff Grandison (cont.)

    Board Of Directors Cliff Grandison (cont.) • Mr. Grandison also served as a director of Kimber Resources Inc., a company listed on the Toronto Stock Exchange and the NYSE Amex, from December 2003 to December 2006 and Skyline Gold Corp From 1992 to 2016. Mr. Grandison received a Bachelor of Arts degr

  15. Slide 15: Board of Directors: Michael Hoole

    Board Of Directors Michael Hoole, Director • Mr. Hoole has been a self-employed consultant since 2008. From 1999 to 2008, he served as Vice President and Secretary of Kimber Resources Inc., listed on the TSX and NYSE Amex. He also served as a director of Kimber from 2002 to 2006 and as an officer of

  16. Slide 16: Board of Directors: Matthew Bell, Gordon Loverin

    Board Of Directors Matthew Bell, Director & Co-Chairman • Mr. Bell is a Tlingit Native born and raised in Kake, Alaska. He has served on the city council for the city of Kake and from 1997 to 2010 he was a member of the Board of Directors of the Kake Tribal Corporation. While on KTC Board he was Pre

  17. Slide 17: Board of Directors: Gordon Loverin (cont.)

    Board Of Directors • Gordon Loverin (cont.) • Mr. Loverin is President of T’senaglobe Media which provides media development services assisting resource companies in meeting environmental and disclosure commitments required by the provincial and federal Environmental Process. • He is also Co-chair o

  18. Slide 18: Board of Directors: Greg Sunell

    Board Of Directors Greg Sunell, Director • Past President and Director of Synex Int’l, a TSX listed company, involved in consulting, building and operating hydro projects in BC. • He is a professional engineer and brings a history of design, construction, operation and management skills required for

  19. Slide 19: Share Structure

    Share Structure Outstanding Shares held by others………….. 38,368,750 Outstanding Shares held by the Company….. 5,868,853 Options outstanding @$0.10………………………..6,640,000 Warrants outstanding @$0.10…………………. 2050,000 Fully Diluted…………………………………..………… 50,711,103 Website http://www.alaskahydro.com/

  20. Slide 20: Stock Exchange

    Stock Exchange • Listed TSXV • Trading symbol AKH http://www.alaskahydro.com/

  21. Slide 21: For Additional Information Contact

    FOR ADDITIONAL INFORMATION CONTACT CLIFF GRANDISON PRESIDENT ALASKA HYDRO CORPORATION 604 929 3961 www.info@alaskahydro.com

Alaska Hydro — Investor Presentation (August 2019) on 6ix