Culpeo Minerals Limited · ASX:CPO
Culpeo Minerals — 2024 Energy Transition Metals Summit
20 slides from Culpeo Minerals's conference presentation, Apr 29, 2024
Slide 1: Advancing High-Grade Copper in Chile
For personal use only ADVANCING HIGH-GRADE COPPER IN CHILE ASX:CPO | OTCQB:CPORF APRIL 2024
Slide 2: Disclaimer
Disclaimer This Presentation and any accompanying verbal Presentation (together the Presentation) has been prepared by Culpeo Minerals Limited (“Culpeo” or “the Company”) and approved by the Board of the Company. The information contained in the Presentation (Information) is a summary only and shoul
Slide 3: Investment Highlights
QUALITY COPPER PORTFOLIO WITH NEW TWO QUALITY PROJECTS ON LANA CORINA DISCOVERY THE INFRASTRUCTURE LADEN CHILEAN COASTAL BELT LOCATED IN THE PREMIER COPPER PRODUCING For personal use only REGION GLOBALLY PERU DYNAMIC AND SYSTEMATIC BOLIVIA ADVANCEMENT TO UNLOCK POTENTIAL CHILE Antofagasta PROVEN TEA
Slide 4: Corporate snapshot
Corporate snapshot Compelling entry price, strong leverage to further exploration success Capital structure Major shareholders For personal use only Share price1 A$0.05 15% TIGHT REGISTER WITH Shares on issue2 165.4M SUPPORTIVE EXPLORATION- 46% FOCUSED SHAREHOLDER BASE Listed options2 13.9M 39% Boar
Slide 5: Committed Copper Mine Supply Forecast
COMMITTED COPPER MINE SUPPLY FORECAST1 SUPPLY PIPELINE LACKS HIGH QUALITY, LARGE MT SCALE PROJECTS Australasia For personal use only Asia WEAK STRONG Africa ACCELERATION OF Europe DEMAND ELECTRIFICATION COPPER South America DRIVING North America S T RO NG O U T LOOK SIGNIFICANT MARKET DEFICIT 20 GRO
Slide 6: Corporate Overview
Corporate Overview Premier copper producing region globally • Quality copper portfolio with multiple drill For personal use only ready targets and development options. • Targeting high-grade copper, critical for the energy transition. • Strategically positioned at low altitude, near infrastructure,
Slide 7: 1. Lana Corina Project
1. Lana Corina Project New discovery of high-grade outcropping copper and molybdenum Notable copper intersections: For personal use only • 104m @ 0.81% CuEq from 155m (CMLCD001)1; • 257m @ 1.10% CuEq from 170m (CMLCD002)2; • 173m @ 1.09% CuEq from 313m (CMLCD003)3; • 81m @ 1.16% CuEq from 302m (CMLC
Slide 8: Lana Corina: Regional potential with outcropping copper targets
1. Lana Corina Project Regional potential with outcropping copper targets over 3km of strike For personal use only Plan view showing Lana Corina detailed surface geology map and the high priority targets 1. Plan view of high-resolution ground magnetic data (high-pass filtered TMIRTP), showing the po
Slide 9: Lana Corina: Regional potential over 3km of strike
1. Lana Corina Project Regional potential with outcropping copper targets over 3km of strike For personal use only Lana Corina/Vista Montana long section: Defined targets over >3km of strike (background image is the VOXI 3D magnetic invers ion model)1,2. CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTO
Slide 10: 2. Fortuna Project
2. Fortuna Project Outcropping targets immediately north of the Lana Corina discovery • Culpeo concession area at Fortuna For personal use only covers 4,025 hectares. • Historic mines total strike of >6km. • Nine high priority outcropping targets: – Vaca Muerta; – Piedra Dura; – La Florida; – El Qui
Slide 11: Fortuna Project: High priority El Quillay North target
2. Fortuna Project High priority El Quillay North target Maiden drillhole intersected: For personal use only • 26m @ 0.81% CuEq, including 4m @ 1.87% CuEq1. • Induced polarisation anomaly identified a 500m x 300m target less than 100m below surface. Historical underground sample results included2: •
Slide 12: Shallow, wide, high-grade copper mineralisation confirmed
2. Fortuna Project Shallow, wide, high-grade copper mineralisation confirmed Results from initial El Quillay North drill hole For personal use only (CMEQD002) returned1: • 5.8m @ 0.78% CuEq; and • 26m @ 0.81% CuEq, including 4m @ 1.87% CuEq. • 3km-long El Quillay Fault links El Quillay North, Centra
Slide 13: Multiple high-grade copper results at Piedra Dura and Lucero
2. Fortuna Project Multiple high-grade copper results returned at Piedra Dura and Lucero Prospects Piedra Dura Prospect Lucero Prospect For personal use only • Assays from rock chip sampling returned grades up to • Grades up to 5.37% Cu2 from newly defined parallel 4.16% Cu and 48.3g/t Au1. minerali
Slide 14: Porphyry copper and gold system at La Florida Prospect
2. Fortuna Project Porphyry copper and gold system at La Florida Prospect • Large (1.7km x 0.5km footprint) copper-gold porphyry For personal use only system delineated at La Florida Prospect. • Results from surface sampling returned grades up to 3.96% Cu and 2.61g/t Au1. • Mineralisation styles ana
Slide 15: Active Exploration and Strong News Flow in 2024
Active Exploration and Strong News Flow in 2024 Lana Corina drilling program in progress Project Activity Q1-24 Q2-24 Q3-24 Q4-24 For personal use only Cu Au Mo 1. Fortuna Drill testing at Vaca Muerta ■ Cu Mo 2. Lana Corina Drill testing at Lana Corina ■ ■ Cu Au Mo 1. Fortuna Mapping and litho-geoch
Slide 16: Board and senior management
Board and senior management Successful track record of discovery, project development and value creation For personal use only Geoff Max Zeffron Paul Sergio McNamara Tuesley Reeves Schmiede Uribe Non-Executive Managing Non-Executive Non-Executive Chilean Country Chairman Director Director Director M
Slide 17: Investment Highlights
QUALITY COPPER PORTFOLIO WITH NEW LANA CORINA DISCOVERY For personal use only LOCATED IN THE PREMIER COPPER PRODUCING REGION GLOBALLY INVESTMENT HIGHLIGHTS DYNAMIC AND SYSTEMATIC ADVANCEMENT TO UNLOCK POTENTIAL CHILEAN COPPER DEVELOPMENT FOR A CLEAN ENERGY PROVEN TEAM TO DELIVER RAPID FUTURE ASSET D
Slide 18: Appendices
For personal use only APPENDICES
Slide 19: Resource details and copper equivalent calculations
Appendix 1 Resource details and copper equivalent (CuEq) value calculations • Lana Corina Project: refer to ASX announcement “Drilling intersects 169m @ 1.08% Cu up to 3.56% Cu” dated 23 November 2022. • Quelon Project: refer to “Company’s Prospectus” dated 23 June 2021, page 43. • Candelaria Mine (
Slide 20: Contact
For personal use only C O N TAC T LEVEL 48. 152-158 ST GEORGES TERRACE PERTH WA 6000 +61 (8) 6311 9160 / +61 416 097 403 info@culpeominerals.com.au max.tuesley@culpeominerals.com.au geoff.mcnamara@culpeominerals.com.au
Culpeo Minerals — 2024 Energy Transition Metals Summit on 6ix