Blue Thunder Mining — Investor Presentation (September 2021)
18 slides from Blue Thunder Mining's investor presentation, September 2021
Slide 1: The right location, time and team for an exciting new discovery
The right location, time and team for an exciting new discovery SEPTEMBER 2021
Slide 2: Forward Looking Statements
Forward Looking Statements This document contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein includ
Slide 3: Investment Highlights
Investment Highlights Large land package •~51,000 ha south of the Chibougamau- in an emerging Chapais Mining Camp (produced >3B lbs Cu and 4M oz Au)3 gold camp •Highly prospective area, on trend with the recent At the crossroads of Nelligan (3.2M oz Au at 1.0 g/t Au)1 & Monster three major structure
Slide 4: Capital Markets Profile
Capital Markets Profile Highly supportive shareholder base Compelling valuation relative to peers Ticker TSXV:BLUE OTCQB: BLTMF Share Price TSXV (Sept 16, 2021) C$0.050 Share Price OTCQB (Sept 16, 2021) USD$0.036 Principal Shareholders Basic Shares Outstanding 102.80M Retail and Red Cloud Option
Slide 5: Strong Management Team, Accomplished Board
Strong Management Team Accomplished Board Chad Williams Jean François Métail Executive Chairman and Director President Founder and Chairman of Red Cloud Securities and 30 years of international experience advancing Sharechest Inc. gold projects from exploration and Former CEO of Victoria Gold
Slide 6: Located in an Emerging Gold Camp
Located in an Emerging Gold Camp Revived Gold District South of Historic Chibougamau-Chapais Mining Camp Produced over 3 billion lbs of copper and over 4 million oz of gold1 Chibougamau Chapais Embry Fancamp Chevrier Monster Lake Muus East Muus Philibert Joe Mann Meston Project Location Nelligan Lac
Slide 7: Muus Project: Outstanding Location
Muus Project: Outstanding Location Chevrier Main Zone Deposit (3): Ind: 11Mt @ 1.2 g/t = 423Koz Inf: 7.4 Mt @ 1.3 g/t = 303Koz Monster Lake Deposit (1): Fancamp Inf: 1.1Mt @ 12 g/t = 433Koz Au Joe Mann Mine Muus East Historical Production (4): 1.8Moz @ 8.5 g/t Au Muus Meston Deposit (4): 1.2Mt @ 6.3
Slide 8: Muus Project at a Glance
Muus Project at a Glance Southern Chibougamau Chibougamau-Chapais MUUS Project The rise of a new mining camp World-Class mining camp with renewed The Guercheville Fault System: A new 51,000 ha of ground with limited interest for gold deposits gold bearing complex structure historical explorati
Slide 9: Muus Project History
Muus Project History Historic Exploration Blue Thunder Exploration Activities Muus Property explored 1950’s to 1980’s Acquired Muus property (12,000 ha) in 2017 Fancamp mostly drilled 1950’s to 1990’s Expanded landholdings to ~51,000 ha Nisk, Muus East and Embry remain mostly Exploration
Slide 10: Muus Project Geophysics Surveys
Muus Project Geophysics Surveys Embry Fancamp (14KM) Muus East Muus Resource Definition Advanced Exploration Drill testing Target Delineation Grassroot Nisk Total magnetic intensity “Deposits and Showings” and “Regional Structures” adapted and modified from Quebec Government’s Ministry of Energy and
Slide 11: Muus Project Geochemical Surveys
Muus Project Geochemical Surveys Secondary Environment – Sediment Samples Legend Fancamp Sampling Showings Till samples Muus Soil samples East Regional Structures Deformation zones Blue Thunder Properties Muus Resource Definition Advanced Exploration Nisk Drill testing Target Delineation Total magne
Slide 12: Muus Project Historical Drilling
Muus Project Historical Drilling Legend Fancamp Historical Drilling Diamond Drilling RC Drilling Muus Other East Showings Deformation zones Blue Thunder Properties Muus Nisk bluethundermining.com 12 TSXV:BLUE | OTCQB: BLTMF
Slide 13: Muus Project Recent Drilling
Muus Project Recent Drilling Drilling 2020 Fancamp - 14 DDH 2,808m Muus - 6 DDH 1,278m Drilling 2021 Fancamp - 5 DDH 787m Muus - 7 DDH 1,721m Fancamp Muus East Muus Resource Definition Advanced Exploration Drill testing Target Delineation Nisk Grassroot Adapted and modified from Quebec Government’s
Slide 14: In 2022 we're taking Muus to the next level
In 2022 we’re taking Muus to the next level We’re expecting 2022 to be a pivotal year as we continue to aggressively explore for multiple styles of gold and base- metal mineralization Complete compilation of historical work Compilation & Refine structural and geochemical interpretation to Interp
Slide 15: Muus Project – Why We Like It
Muus Project – Why We Like It Fancamp Muus East Muus Nisk Adapted and modified from Quebec Government’s Ministry of Energy and Natural Resources (MERN) SIGEOM website - Geology Legend available in Appendix bluethundermining.com 15 TSXV:BLUE | OTCQB: BLTMF
Slide 16: Other Companies in the Chibougamau District
Other Companies in the Chibougamau District Trading at a fraction of the market cap of explorers in the region Potential for a big re-rating upon exploration success Market Cap1 C$4.63M C$24.8M C$51.5M C$55.2M Key Project(s) Muus Project Nelligan (25%) Corner Bay, TPK, (Fancamp & Muus Cedar Bay, Lac
Slide 17: Why Invest?
Why Invest? • Largest land position in area with 510 km2 • Redefined gold district with significant past Right Location production1 • Major new discoveries in one of the best mining jurisdictions in the world • 3 years to build up integrated 3D model • Understanding of geology and structural Right T
Slide 18: Contact Us
Aerial photo of target area on the Fancamp Property Contact Us Blue Thunder Mining Inc. 401 Bay Street Suite 2100, P.O. Box 55 Toronto, ON, M5V 2Y4 info@bluethundermining.com 1-647-848-1009 bluethundermining.com 18 TSXV:BLUE | OTCQB: BLTMF
Blue Thunder Mining — Investor Presentation (September 2021) on 6ix