Botswana Minerals Plc · LSE:BMIN
Botswana Minerals — Investor Presentation (September 2026)
13 slides from Botswana Minerals's investor presentation, September 2026
Slide 1: Copper, Silver and Lead-Zinc Exploration Across 7,000 km² In Botswana
Copper, Silver and Lead-Zinc Exploration Across 7,000 km² In Botswana Short Form Presentation | September 2026 | AIM: BMIN | BSE: BMIN
Slide 2: Disclaimer
IMPORTANT NOTICE Disclaimer The information contained in this document (“Presentation”) has been prepared by Botswana Minerals PLC (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, em
Slide 3: Botswana Minerals In Brief
THE COMPANY Botswana Minerals In Brief AIM/BSE explorer: 7,074 km²; copper, silver and lead-zinc targets; imminent fieldwork; c.£3.5m market capitalisation. Defined Targets Field Testing • Copper: 36 northern anomalies in six corridors; nine • 52 traverses and c.1,376 samples planned. southern corri
Slide 4: A Copper Belt Hidden Under Sand
THE BIG IDEA A Copper Belt Hidden Under Sand Between Namibia’s mineralised belts and the Central African Copperbelt; geological continuity beneath the Kalahari remains untested. Tsumeb And Berg Aukas, Namibia Tsumeb: c.30 Mt at 4.3% Cu, 10% Pb, 3% Zn, with Ag and Ge. Berg Aukas: 1.2 Mt at 17% Zn. Bo
Slide 5: 7,074 km²: Underexplored Beneath Kalahari Sand
THE GROUND 7,074 km²: Underexplored Beneath Kalahari Sand Eight licences, awarded in January 2026 and valid to December 2028, adjacent to Kihabe-Nxuu. Northern PL 548/549: Congo Craton margin at the Namibian border; 36 Group copper anomalies in six corridors. Southern PL 550/551/578/579/580/593: nin
Slide 6: Three Target Systems Defined, Fieldwork Imminent
THE TARGETS Three Target Systems Defined, Fieldwork Imminent North: copper, silver and lead-zinc. South: nine copper corridors. Sampling now, with drilling planned for 2027. Copper Silver Lead-Zinc 9.5 km 36 9 20 km Large Structural 2.4 km MVT On Trend anomaly east of anomalies in six corridors in t
Slide 7: Copper Is Already Logged In The Ground
THE TARGETS · HISTORICAL DATA Copper Is Already Logged In The Ground Historical uranium and diamond holes logged chalcopyrite, malachite and chrysocolla beneath the Kalahari sand, in later-defined target corridors. 29,000+ 1,800 c.49 historical borehole records northern target documents across targe
Slide 8: From Award To Targets In 221 Days
PROGRESS From Award To Targets In 221 Days The search area was narrowed without drilling. 20th April 2026 Day 84 PL 548/549: a 9.5 km copper 30th June 2026 Day 155 4th September 2026 Day 221 26th January 2026 Day 0 anomaly, a 20 km silver Chalcopyrite confirmed in Nine southern corridors Eight coppe
Slide 9: The Next Twelve Months: Sample, Rank, Drill
WORK PROGRAMME The Next Twelve Months: Sample, Rank, Drill Sampling in 2026, geophysics on priority corridors and drilling planned for 2027. Second Half Of 2026 First Half Of 2027 2027 • Existing funds cover • Northern and • Base case: c.3,000 imminent PL southern targets m of diamond core 548/549 s
Slide 10: A Structural Deficit And A Price That Has Doubled
MARKET OUTLOOK · COPPER A Structural Deficit And A Price That Has Doubled Grid and data-centre demand meets constrained mine supply; copper prices reflect scarcity since 2021. LME copper, annual average, US$ per tonne Demand 15000 • Grids and transmission, data centres, renewables, EVs and defence n
Slide 11: A Team That Has Found And Sold Mines Before
LEADERSHIP A Team That Has Found And Sold Mines Before Over 25 years in Botswana; De Beers and Anglo American pedigree and listed-company experience. John Teeling James Campbell Jim Finn Rory Harding David Cockbill Executive Chairman Managing Director Finance Director Non-Executive Director Non-Exec
Slide 12: Capital Structure At A Glance
CORPORATE SNAPSHOT Capital Structure At A Glance AIM/BSE listed; figures at 21st September 2026 unless stated. Key Information c.£3.5m 0.21p Exchange Ticker AIM (London) and Botswana Stock Exchange BMIN Market capitalisation at 0.21p, 21st Share price, LSE close September 2026 Shares In Issue 1,658,
Slide 13: James Campbell, Managing Director
James Campbell, Managing Director | +27 83 457 3724 | james@botswanaminerals.com | botswanaminerals.com | AIM: BMIN | BSE: BMIN
Botswana Minerals — Investor Presentation (September 2026) on 6ix