Wollongong Coal — Investor Presentation (August 2026)
24 slides from Wollongong Coal's investor presentation, Aug 24, 2026
Slide 1: The Banana Lithium Project
THE BANANA LITHIUM PROJECT HIGH GRADE SPODUMENE MINERALISATION WITH STRONG EXPANSION POTENTIAL ASX:WLC I N V E S TO R P R E S E N TAT I O N AUGUST 2026 · JAMES BAY AND NUNAVIK, QUÉBEC
Slide 2: WhiteRock & The Banana Lithium Project
WHITEROCK & THE BANANA LITHIUM PROJECT WHITEROCK LITHIUM CORPORATE PRESENTATION · AUGUST 2026 · 2
Slide 3: Company Snapshot
ABOUT US COMPANY SNAPSHOT WhiteRock is a critical minerals exploration company focused on the identification, acquisition and advancement of lithium exploration 2022 FOUNDED · CANADIAN COMPANY · ASX LISTED opportunities, with an emphasis on hard-rock, spodumene-bearing pegmatite systems Successful 1
Slide 4: The Banana Lithium Project: Project Overview
THE BANANA LITHIUM PROJECT PROJECT OVERVIEW Eeyou Istchee James Bay and Nunavik regions, Québec, an established global mining jurisdiction Exclusive lithium exploration rights over approximately 67,245 ha of prospective claims, 100% owned 1.2 km east of a gravel road to the all-season Trans-Taïga Hi
Slide 5: Why Invest in WhiteRock? A Discovery That Ticks All the Boxes
WHY INVEST IN WHITEROCK? A DISCOVERY THAT TICKS ALL THE BOXES SCALE GRADE METALLURGY DE-RISKED 190–275 Mt 2–3 % Li₂O on average U P TO 87 % Location EXPLORATION TARGET* DRILLING RESULTS Li₂O RECOVERY 100% OWNED TENURE 90+ Mt of exploration targets at Multiple 2–3% Li₂O intervals over HLS test work r
Slide 6: The Quebec Peer Group
WHY INVEST IN WHITEROCK? THE QUEBEC PEER GROUP COMPANY PROJECT MINERAL RESOURCE ESTIMATE EXPLORATION TARGET MARKET CAP* 46.0 Mt at 1.36% Li2O (measured + indicated) Rio Tinto Whabouchi N/A …. 8.3 Mt at 1.31% Li2O (inferred)* 146 to 231 Mt Shaakichiuwaanaan 108 Mt at 1.40% Li2O (indicated) PMET Resou
Slide 7: Canada Is Accelerating Critical Minerals
POLICY TAILWINDS CANADA IS ACCELERATING CRITICAL MINERALS LITHIUM-SPECIFIC SUPPORT & INVESTMENT FEDERAL PERMITTING & INFRASTRUCTURE Québec critical strategic mineral ‘One project, one review’ Lithium recognised under the 2026–2031 Strategy for the Development of A single federal review for major pro
Slide 8: Drilling Results & 2026/27 Outlook
DRILLING RESULTS & 2026/27 OUTLOOK WHITEROCK LITHIUM CORPORATE PRESENTATION · AUGUST 2026 · 8
Slide 9: 2024 Drilling Campaign Results
2024 DRILLING CAMPAIGN 2024 DRILLING CAMPAIGN RESULTS 7,844 m drilled across 29 drill holes, all hit LCT pegmatite at/near surface, and well mineralized ◆ Extremely successful program, all 29 diamond drill holes hit LCT pegmatite ◆ Mineralisation confirmed high-grade lithium at surface, with multipl
Slide 10: Spodumene Mountain: High-Grade Lithium at Surface
SCALE & GRADE SPODUMENE MOUNTAIN: HIGH-GRADE LITHIUM AT SURFACE Shallow-dipping spodumene-bearing pegmatites confirmed in drilling ◆ Thick, well mineralized pegmatite at surface with several higher-grade zones a key attribute of the project ◆ Grades of 2–3% Li₂O intervals starting from surface ◆ Mul
Slide 11: Isabella: A Second High-Grade Target
SCALE & GRADE ISABELLA: A SECOND HIGH-GRADE TARGET A second prospect, ~ 750 m west from Spodumene Mountain ◆ Thick, well mineralized pegmatite with higher grade zones within, starting from surface ◆ Located ~ 750 m west from Spodumene Mountain ◆ A secondary target in the 2026 drilling program ◆ Simi
Slide 12: Independent Technical Assessment Quote on Exploration Target
‘There is significant potential to increase the tonnage and possibly grade of the Exploration Target with further exploration, given that the pegmatites drill tested to date are ‘open’ in all directions.’ C U B E C O N S U LT I N G INDEPENDENT TECHNICAL ASSESSMENT REPORT· PERTH WA · JUNE 2026 WHITER
Slide 13: First Metallurgy Testing Results Positive
METALLURGY FIRST METALLURGY TESTING RESULTS POSITIVE METALLURGY POTENTIALLY SUPPORTS A SIMPLE PROCESS FLOWCHART UP TO 87% 6% <0.8% Li₂O RECOVERY SPODUMENE CONCENTRATE (SC6) Fe₂O₃ IN CONCENTRATE ◆ Initial metallurgical testing yielded relatively high lithium recovery at SC 6.0 grade ◆ HLS and mineral
Slide 14: Advantages Already in Place
INFRASTRUCTURE ADVANTAGES ALREADY IN PLACE Québec is a proven mining jurisdiction benefitting from a well-established mining code, a long history of resource development, clear environmental assessment and permitting processes, political stability and 94% hydropower-dominated electrical grid W H I T
Slide 15: Company Priorities 2026–27
OUR GROWTH STRATEGY COMPANY PRIORITIES 2026–27 THE CO MPANY IS WELL PO SITIO NED - A proven team, with a fully funded 2026-27 drill plan executing a clear path CORPORATE ACTIVITIES SITE PROGRAM ◆ H1: Build out the management team & board ◆ Drill program July-October up to 4 rigs and heli-supported.
Slide 16: 2026 Drilling Program Underway
DRILLING CAMPAIGN SCALE 2026 DRILLING PROGRAM UNDERWAY 2 0 2 6 F I E L D P R O G R A M · J U LY – O C T 2 0 2 6 Up to 80 drill holes 4 DRILLING DIAMOND DRILLING DRILL RIGS UNDERWAY ◆ Drill permit in place (valid two years), exploration camp, two helicopters and up to four rigs contracted, mobilisati
Slide 17: Project Milestones – The Banana
NEAR-TERM MILESTONES PROJECT MILESTONES – THE BANANA Drilling underway, first results in Sept. 2027 DRILLING 2026 DRILLING, PROCESSING & CAMP OPS 2027 STUDIES & PRE-MOBILISATION CAMPAIGN AUG–SEP 2026 · NOW NOV–DEC 2026 Q2 2027 Drilling Underway 2026 Campaign Close-Out Maiden MRE & Awards July drilli
Slide 18: Leadership & Execution
TEAM LEADERSHIP & EXECUTION PROVEN TRACK RECORD STUDIES TO OPERATIONS PARTNERSHIPS & OFFTAKE QUÉBEC & COMMUNITY ASX MARKETS EXECUTION BOARD Simon Hay Dustin Nanos Drew Nanos Alan Rule Ron Mitchell EXEC CHAIR & CEO EXEC DIRECTOR NON-EXEC DIRECTOR NON-EXEC DIRECTOR NON-EXEC DIRECTOR Led development of
Slide 19: Capital Structure
WELL FUNDED FOR 2026-27 DRILLING PROGRAMS CAPITAL STRUCTURE Pro forma metrics USE OF FUNDS ~$280 million ~$249 million ~$31 million PRO FORMA MKT CAP ENTERPRISE VALUE CASH · 30 JUNE 2026 81% Exploration work program 4% Costs of the IPO Ticker WLC CDIs on issue 86.2 m 10% Corporate administration CDI
Slide 20: Why WhiteRock?
THE INVESTMENT CASE WHY WHITEROCK? A potential large-scale, high-grade spodumene discovery in a top tier jurisdiction, led by a proven team SCALE GRADE METALLURGY TOP TIER JURISDICTION EXPERIENCED TEAM Independent Exploration Multiple 2–3% Li₂O Clean, low-impurity Québec, an established Board and ma
Slide 21: Forward-Looking Statements
IMPORTANT NOTICE FORWARD-LOOKING STATEMENTS DISCLAIMERS Nature of Document: This presentation has been prepared and issued by WhiteRock Lithium Corp. contained in this presentation will be achieved or proved correct. Except for statutory liability which (WhiteRock or the Company) to provide general
Slide 22: Forward-Looking Statements
IMPORTANT NOTICE FORWARD-LOOKING STATEMENTS U.S. Securities Law Restrictions: This presentation is not for release, distribution or publication, directly defined in the JORC Code. Mr Matt Clark consents to the inclusion in this presentation of the matters or indirectly, in or into the United States
Slide 23: Simon Hay
Simon Hay EXECUTIVE CHAIRMAN & CEO info@whiterocklithium.com www.whiterocklithium.com CALGARY, ALBERTA · EEYOU ISTCHEE JAMES BAY, QUÉBEC WHITEROCK LITHIUM CORPORATE PRESENTATION · AUGUST 2026 · 23
Slide 24: Resource & Exploration Target References
APPENDIX RESOURCE & EXPLORATION TARGET REFERENCES COMPANY DEPOSIT REPORTING CODE SOURCE https://www.sec.gov/Archives/edgar/data/1742924/0001140361230 Rio Tinto Whabouchi S-K 1300 45135/ny20009544x3_ex96-1.htm Shaakichiuwaanaan Company announcement on 23 May 2025 - PMET Resources NI 43-101 + JORC (CV
Wollongong Coal — Investor Presentation (August 2026) on 6ix