  1. Slide 1: Integrated Ecological Research -- TVA Kingston Ash Recovery Project

    Integrated Ecological Research-- TVA Kingston Ash Recovery Project Kingston Fly Ash Release Environmental Symposium August 2, 2011 Neil E. Carriker, Ph.D. Tennessee Valley Authority

  2. Slide 2: Overview of Kingston Ecological Research

    Overview of Kingston Ecological Research • Questions We’re Trying to Answer • Approaches We’re Using • Who is Involved • Schedules

  3. Slide 3: Questions To Address

    Questions To Address:  What Were Initial Ecological Damages?  How Is the Ecosystem Responding?  Are There Likely To Be Any Long-Term Effects?  Are There Likely To Be Any Latent Effects?  How Long Will Ecosystem Recovery Take? 3

  4. Slide 4: First, A Brief Review

    First, A Brief Review • Spill Volume: ~5.4 Million cubic yards (12/22/08) • Emergency Response/Pilot Dredging Phase • CERCLA Phase 1-- Time-Critical Action Removal – 3.5 million cu yd removed from Emory River – May 29, 2010 Emory River reopened • CERCLA Phase 2—Non Time-Critical Action Removal – 2.8

  5. Slide 5: Initial Damages? Ecosystem Response? (Ideally)

    Initial Damages? Ecosystem Response?  Ideally… ◦ Lots of pre-spill data for comparison… ◦ Simple task to collect more, compare before/after 5

  6. Slide 6: Initial Damages? Ecosystem Response? (Reality)

    Initial Damages? Ecosystem Response?  Reality… ◦ A little pre-spill data available, lots of data gaps  Intensive sampling immediately post-spill  Fish and invertebrate community surveys  Fish “baseline” bioaccumulation surveys ◦ Lots of post-spill, periodic surveys over time  Fish, mayflies, bi

  7. Slide 7: Long-Term or Latent Effects?

    Long-Term or Latent Effects?  Residual Ash Investigations (River EE/CA) ◦ Human Health & Ecological Risk Assessments ◦ Necessary investigations described in Sampling & Analysis Plan (SAP)  Supplemental Investigations ◦ Information for operations decisions ◦ Additional information relevant to risk

  8. Slide 8: Approaches

    Approaches  Multiple Lines-of-Evidence ◦ Multiple Disciplines ◦ Multiple Organisms (cellular/organ/individual/population/community) ◦ Different Trophic levels  Multiple Participating Institutions ◦ TVA ◦ ORNL ◦ USACE-ERDC ◦ Nine Different Universities  Directly funded by TVA  ORAU-Administered g

  9. Slide 9: Engineering Evaluation/Cost Analysis (EE/CA) for the River System

    Engineering Evaluation/Cost Analysis (EE/CA) for the River System • Sampling and Analysis Plan (SAP) supporting Baseline Ecological Risk Assessment • Approved by EPA; sampling initiated in May 2010 • Focus on potential sub-lethal, cumulative, long-term effects  Ash deposits  Submerged sediments 

  10. Slide 10: EE/CA SAP Status—August, 2011

    EE/CA SAP Status—August, 2011 Field Work Completed: Weekly status updates  Field work • Surface water  Data verification and • Ground water validation • Ash pore water  Technical memoranda • Seasonally- exposed sediment • Wildlife • Fish • Benthic invertebrates • Ash deposits • Submerged sediment

  11. Slide 11: Weekly EE/CA Update

    Weekly EE/CA Update Status Date 3/30/2011 SAP TASK TECH MEMO (Appendix D FIELDWORK STATUS DATA STATUS DATA VERFICATION/ STATUS Reference) VALIDATION PERCENTAGE 1. Ash Deposits - Tennessee River Reaches A/B complete; Clinch River Sampling and analysis continues. 18/20 lab Reaches A, B, and Reference

  12. Slide 12: Weekly Progress Update

    Weekly Progress Update cial Act ‘Tennessee Valley Authority TVA Kingston Ash Recovery Project ‘Uncompleted Actions jFouRK FUCK jFOuGK jFoucK 2 [rouRK FUCK @ [roux jROUCK jFOUCK jROUCK jFoucK 72 [ROUCK Al ssle (FE eles (s elelele aelelz [5 alse ele sfela fa «lelele blelal= fz e felele ale alela fe vl

  13. Slide 13: EE/CA Schedule

    EE/CA Schedule • Sample Collection Interim Reporting  Technical memoranda  May 2010 --June 2011  Ground Water Model • Lab analysis, data validation Briefing  July 2010 --July 2011  Interagency Data • Technical Briefing memoranda  Interagency Baseline  March 2011 -- Ecological Risk September 2

  14. Slide 14: Supplemental Investigations

    Supplemental Investigations ◦ Oak Ridge Associated Universities – Administered Grants:  Old Dominion (two studies)  North Carolina State University  Duke University/University of Kentucky/ University of Illinois  University of Colorado/USGS  Iowa State/Northwestern ◦ Direct contracts with:  Oa

  15. Slide 15: Supplemental Investigations

    Supplemental Investigations • Results support both EE/CA and NRDA • Quality Assurance Project Plans (QAPP) per CERCLA guidance • Field Surveillances, lab audits 15

  16. Slide 16: FY 2011 Biota Sampling

    FY 2011 Biota Sampling…  Heron & Goose Eggs (March-April)  Spring sport fish survey (April-May)  Fish bioaccumulation, Spring fish reproductive survey, Larval fish (April—May)  Tree Swallows, Turtles (April—August)  Periphyton & aquatic vegetation (June-July)  Emory River sediment toxicity bio

  17. Slide 17: Data Quality

    Data Quality Thousands of samples, multiple matrices… • Using EQuIS software for tracking • Chains of custody—automated lab data verification—data storage & management • Laboratory specifications • Full electronic data deliverables • Raw data, as well as lab QA/QC results, field/method blank results

  18. Slide 18: Data Quality

    Data Quality “Hands-on” sample management  Weekly on-site status/prioritization meetings  Priorities for sampling, shipping, chemical analysis, data verification/validation  Status updates  Weekly laboratory teleconferences  Sample analysis sequence priorities  Resolution of analytical issues

  19. Slide 19: Data Verification/Validation Status—Weekly Update

    Data Verification/Validation Status— Weekly Update Bass, Bluegill, Catfish, Etc. - 2009 Shad - 2009 *Shad - Fall 2010 *Bass, Bluegill, Catfish, Etc. - Fall 2010 Bass, Bluegill, Catfish, Etc. - Spring 2010 Shad - Spring 2010 Heron, Goose, Osprey Eggs - 2009 Heron, Goose, Osprey Eggs - 2010 Amphibians

  20. Slide 20: Summary

    Summary • Broad Range of Ecological Investigations • Robust, Comprehensive: Multiple Lines of Evidence, Multiple Institutions, Multiple Trophic Levels, • Assessing Cellular Level Through Population & Community-Level Responses • Results Applicable to NRDA & Ecological Risk Assessment • Rigorous Data

  21. Slide 21: To Date…

    To Date… • >8,300 samples (not counting air or Hydrolab data) • 99.8% data acceptance • Nine Universities • Oak Ridge National Laboratory • Corps of Engineers Engineer Research & Development Center • Site-wide Quality Assurance Project Plan • 60+ Standard Operating Procedures • Laboratory and field