Platinum Group Metals Ltd. · TSX:PTM

Platinum Group Metals — Investor Presentation (August 2006)

21 slides from Platinum Group Metals's investor presentation, Aug 17, 2006

  1. Slide 1: The Path to Production

    PLATINUM GROUP METALS LTD. Date: August 17, 2006 PTM:TSX The Path to Production

  2. Slide 2: Disclosure

    Disclosure This presentation is prepared by Platinum Group Metals Ltd (“PTM”) management and PTM is solely responsible for content and format. R. Michael Jones P.Eng is a non-independent Qualified Person and has compiled this presentation from industry information and 43-101 reports and new releases

  3. Slide 3: Why PTM?

    Why PTM? • PTM is the operator for a bankable feasibility study this year on a large- scale platinum resource at surface (37%) (Western Bushveld Joint Venture) • 40,000 meters drilling is underway for 2006 with the objective of growing resources across 67 square kilometres (37%) • Anglo Platinum, th

  4. Slide 4: Essential and Precious Platinum

    Essential and Precious Platinum • For everyday manufactured goods • Clean air standards – tailpipe of your car • 35 times rarer than gold • 79% production from small Bushveld region in South Africa PTM:TSX The Path to Production

  5. Slide 5: PTM:TSX

    PTM:TSX The Path to Production

  6. Slide 6: Platinum – Annual Global Consumption

    PLATINUM – ANNUAL GLOBAL CONSUMPTION – 6.7M Ozs 15% 35% 19% North America China 1,020,000 Ozs 1,250,000 Ozs Europe 2,320,000 Ozs 19% Autocatalyst 12% Jewelry Rest of the World Japan Manufacturing PTM:TSX 1,290,000 Ozs 826,000 Ozs The Path to Source: Johnson Matthey ‘Platinum 2005’, May 2005 & Johnso

  7. Slide 7: Platinum – Annual Global Production

    PLATINUM – ANNUAL GLOBAL PRODUCTION – 6.5M Ozs Russia (2 mines) 6% 850,000 Ozs 13% North America (3 mines) 390,000 Ozs Zimbabwe (2 mines) 2% 150,000 Ozs 70% Western Bushveld Eastern & Northern Bushveld South Africa (5 mines) South Africa (12 mines) 9% 580,000 Ozs 4,500,000 Ozs PTM:TSX The Path to So

  8. Slide 8: Platinum Territory

    Platinum Territory PTM:TSX The Path to Production

  9. Slide 9: Western Bushveld Joint Venture

    Western Bushveld Joint Venture • Western Bushveld Joint Venture is a large near-surface section of the high-yield Western Limb of the Bushveld Complex • 67 square kilometres • Current resources only 40% of area and 4 kms of 11km potential platinum reef strike length • PTM is operator and has earned

  10. Slide 10: Resources

    Resources Inferred and Indicated Resources are reported. The US Securities and Exchange Commission does not recognize the reporting of Inferred Resources. These resources are reported under Canadian National Instrument 43-101 and have a great amount of uncertainty and risk as to their existence and

  11. Slide 11: Resources Project 1

    Resources Project 1 PTM:TSX The Path to Production

  12. Slide 12: WBJV in the Heart of Pt Mining

    WBJV in the Heart of Pt Mining WBJV (Yellow Outline) Historical Mining (Blue) 11km Impala 2035 Mine Plan (Brown) PTM:TSX The Path to Production

  13. Slide 13: WBJV Resources to Date

    WBJV Resources to Date PTM:TSX The Path to Production

  14. Slide 14: Resources Well Defined

    Resources Well Defined WBJV resources defined by 180 reef piece points and over 100 bore holes Resources cover both Merensky Reef (red) and UG2 Reef (grey) PTM:TSX The Path to Production

  15. Slide 15: WBJV Mine Design

    WBJV Mine Design Shallow design shows access by declines then vertical shaft takeover 10 months to ore 250,000 oz per year target 6g/t 4E plus Merensky grade Preliminary Concept Only PTM:TSX The Path to Production

  16. Slide 16: WBJV Mine Design

    WBJV Mine Design 25 year mine plan with potential mine areas with vertical shaft levels and stopes (red) Preliminary Concept Only PTM:TSX The Path to Production

  17. Slide 17: WBJV Mine Design

    WBJV Mine Design Detailed designs complete Decline infrastructure showing levels and raises North shallow mine area Low risk mining approach Preliminary Concept Only PTM:TSX The Path to Production

  18. Slide 18: Project 2 and Project 3 Potential

    Project 2 and Project 3 Potential 2006 project strategy to View in expand resource next slide to new areas of WBJV to NW 40,000 metres drilling budgeted 2006 PTM:TSX The Path to Production

  19. Slide 19: Project 2 and Project 3

    Project 2 and Project 3 2006 project strategy to expand resource to new areas of WBJV to NW 40,000 metres drilling budgeted 2006 PTM:TSX The Path to Production

  20. Slide 20: Milestones

    Milestones WBJV -PTM JV Partner Funding April 2006 Pre-Feasibility Study Summer 2006 Drilling Results P2,P3 Nov. 2006 Final Feasibility Dec. 2006 PTM:TSX The Path to Production

  21. Slide 21: Value

    Value Shares Issued: 53,691,178 Warrants: 2,729,383 (@ C$1.50, to Oct ‘06) 2,800,000 (@ C$2.10, to Mar ’07) 1,100,000(@ C$1.75, to April ‘07) 850,0000 (@ C$ 1.75 to March ’08) Options: 3,315,375 (@ C$0.95 average) Fully Diluted: 64,485,936; Market Capitalization: US$85M Tonnes, Grade, Depth – Shares

Platinum Group Metals — Investor Presentation (August 2006) on 6ix