Minsud Resources Corp. · TSXV:MSR

Minsud Resources — Investor Presentation (January 2017)

16 slides from Minsud Resources's investor presentation, January 2017

  1. Slide 1: The mining potential of the Chita Valley Project

    “The mining potential of the Chita Valley Project as a whole goes far beyond the Inferred Resources at Chita South Porphyry.” January, 2017

  2. Slide 2: Disclaimer

    Disclaimer • The content of this January 2017 Chita Valley Project Presentation “ the Presentation” is intended to be strictly informational has been prepared by Minsud Resources Corp. (the “Company”) on the basis of information and sources believed to be reliable. Certain information contained here

  3. Slide 3: Chita Valley Project – General Observations

    Chita Valley Project – General Observations •San Juan Province is the largest producer of precious metals in Argentina, primarily from the prolific El Indio belt. •MSA has consolidated seven properties (Brechas Vacas, Chita, Minas de Pinto, Brechas Vacas Oeste, Chita Norte, Chita Sur and Chita Este)

  4. Slide 4: Chita Valley Properties Map (~174 km2)

    Chita Valley Properties Map (~ 174 km2) “The consolidation of Chita, Brechas Vacas and Minas de Pinto properties into the Chita Valley Project was instrumental for the development of Minsud.” 4

  5. Slide 5: Mines/Advanced Projects, San Juan Province & nearby Chile

    Mines/Advanced Projects, San Juan Province & nearby Chile •The new government of Argentina has recently announced measures taken in favor of the mining sector which now confirms a renewed intention to develop the mining industry as a federal policy. • San Juan Province has a robust mining sector and

  6. Slide 6: Chita Valley Project - Highlights

    Chita Valley Project - Highlights • 174 km2 land position for exploring in a mining friendly province, San Juan, Argentina. • NI 43-101 compliant Mineral Resource Estimate for the Chita Deposit includes Inferred Resources of 37.0 million tonnes at a grade of 0.44% Cu. • Project lies between 2,800 &

  7. Slide 7: Chita Valley Project - Main targets - Lithology & Structural Map

    Chita Valley Project - Main targets - Lithology & Structural Map The mineral potential of the Chita Valley Project as a whole goes far beyond the known Inferred Resources at Chita South Porphyry. Minsud has concentrated financial efforts in the South Porphyry (PSU) but management has already identif

  8. Slide 8: Chita Valley Project - Main targets - Alteration Map

    Chita Valley Project - Main targets - Alteration Map 8

  9. Slide 9: Chita South Porphyry Alteration & Drill Hole Locations

    Chita South Porphyry Alteration & Drill Hole Locations 9

  10. Slide 10: Chita South Porphyry Geology & Drill Hole Locations

    Chita South Porphyry Geology & Drill Hole Locations 10

  11. Slide 11: Chita Valley Project – September 2016 drilling campaign

    Chita Valley Project – September 2016 drilling campaign (1,700 m DDH) Hole ID From To Interval Thickness Au Ag Cu Mo m m M vertical m g/t g/t % % PSU16-48 78.25 80.00 1.75 0.9 0.49 31.1 0.017 0.032 PSU16-48 84.00 114.00 30.00 23.2 0.04 2.9 0.317 0.022 PSU16-48 136.00 146.70 10.70 8.2 0.05 3.4 0.264

  12. Slide 12: Inferred Resource Statement, Chita South Porphyry

    Inferred Resource Statement, Chita South Porphyry. In 2015 Minsud filed a National Instrument 43-101 Technical Report and Mineral Resource Estimate on the Chita Deposit. The Mineral Resource Estimate considers copper as a primary consideration along with molybdenum, gold and silver mineralization, a

  13. Slide 13: Chita South, Conceptual Pit Constrained Inferred Resource Diagram

    Chita South, Conceptual Pit Constrained Inferred Resource Diagram. 13

  14. Slide 14: Chita South Porphyry - Next operating steps

    Chita South Porphyry - Next operating steps • Bioleach SX-EW process testwork on PSU samples is under way at CodelcoTec Sp. A. laboratory in Santiago, Chile. At present Sample Preparation, Mineral Characterization (chemical, mineralogical and microbiological) and T.E.S (“test of potential of extract

  15. Slide 15: Other Target Areas

    Other Target Areas Chita Valley Project • The Chita North Porphyry Sector is the northern half of the Chita Porphyry/Epithermal system. The main difference between the two sectors is the north has substantially less bedrock exposure and drilling than the south. Promising results from three recent dr

  16. Slide 16: Minsud Resources Corp. Headquarters

    NORTH AMERICA | Headquarters SOUTH AMERICA | Headquarters Minsud Resources Corp. Minera Sud Argentina S.A. 340 Richmond Street West Esmeralda 684 piso 13° - (CP. 1007) Toronto, Ontario, Canada Ciudad Autónoma de Buenos Aires M5V 1X2 República Argentina Phone / Fax : +1 (416) 479 4466 Phone / Fax : +

Minsud Resources — Investor Presentation (January 2017) on 6ix