  1. Slide 1: Investor Presentation

    I N V E S T O R P R E S E N TAT I O N FEBRUARY 2025

  2. Slide 2: Cautionary Information

    CAUTIONARY INFORMATION This presentation contains forward-looking information within the meaning of applicable Canadian and United States securities legislation. All information contained in this presentation, other than statements of current and historical fact, is forward-looking information. Ofte

  3. Slide 3: Our Purpose

    OUR PURPOSE H' DBAY We about our people our our planet Hudbay provides the metals the world needs. We work sustainably, transform lives and create better Futures For communities.

  4. Slide 4: Diversified Mid-Tier Copper Producer

    DIVERSIFIED MID-TIER COPPER PRODUCER ANNUAL COPPER PRODUCTION & CASH COSTS1,2 REVENUE AND RESERVES BY METAL + Copper $0.86 $0.80 $0.90 World (92kt) Revenue3 Reserves4 $0.74 3% 3% 169 2% 4% Consolidated Copper Cash $0.46 4% Production (000 tonnes) 134-168 153 6% Consolidated Copper 132 138 117-149 Co

  5. Slide 5: Q4 2024 Operational Excellence

    Q4 2024 OPERATIONAL EXCELLENCE OPERATING PLATFORM DELIVERS STRONG PRODUCTION AND STEADY COST CONTROL KEY RESULTS SUMMARY $257M $149M 43kt $0.45/lb Q4 2024 Q3 2024 2024 2023 Q4 Adj. EBITDA1 Q4 Free Cash Flow2 Q4 Cu Production Q4 Cash Cost Production1,2 Copper kt 43.3 31.4 137.9 131.7  Achieved 2024

  6. Slide 6: Transformed Balance Sheet

    TRANSFORMED BALANCE SHEET SIGNIFICANT FINANCIAL FLEXIBIILTY AND INDUSTRY-LEADING FINANCIAL POSITION SUBSTANTIAL DEBT REDUCTION IN 2024 5.0x Dec. 31 2022 Announced “3-P” 4.0x Deleveraging Initiative $83M $100M $62M 3.0x Buy Back of Senior Repayments Under Gold Prepay Facility 2.0x 3.8 Net Debt to Adj

  7. Slide 7: 7

    7

  8. Slide 8: Diversified Portfolio

    DIVERSIFIED PORTFOLIO IN TIER 1 JURISDICTIONS COPPER MOUNTAIN MASON Operating Mine PEA Development Project +20 year mine life +27 year mine life Open pit Open pit ~40kt annual Cu production 112kt annual Cu production British Columbia, Canada Cu Au Ag Nevada, USA Cu Mo Au Ag SNOW LAKE COPPER WORLD Op

  9. Slide 9: Constancia

    CONSTANCIA LONG LIFE, LOW-COST COPPER MINE IN PERU 17 YEARS Cu-Au-Mo 90k tpd MINE LIFE PORPHYRY DEPOSIT NAMEPLATE MILL PERMIT CAPACITY 99kt 98koz $1.18/lb 2024A 2024A 2024A CU PRODUCTION AU PRODUCTION CASH COSTS CONSTANCIA COPPER PRODUCTION PROFILE1 150 $2.00 $1.54 $1.58 125 100%-owned, low cost, lo

  10. Slide 10: Constancia Operational Excellence

    CONSTANCIA OPERATIONAL EXCELLENCE Continuous operational improvements at Constancia have increased throughput, enhanced efficiencies and reduced costs CONSTANCIA THROUGHPUT1 +10% Throughput Expansion expansion beyond avg. 90k tpd permit Avg. Tonnes per Day (000s)  Mill consistently operates above d

  11. Slide 11: Snow Lake

    SNOW LAKE LOW-COST GOLD OPERATION WITH MEANINGFUL BASE METAL PRODUCTION 14 YEARS Au-Zn-Cu 5.3k tpd MINE LIFE1 VMS DEPOSITS NAMEPLATE MILL CAPACITY 214koz 33kt $606/oz 2024A AU 2024A ZN 2024A PRODUCTION PRODUCTION CASH COSTS SNOW LAKE GOLD PRODUCTION PROFILE2 250 $1,000 214 180-220 200 187 170-200 $8

  12. Slide 12: New Britannia Driving Higher Returns

    NEW BRITANNIA DRIVING HIGHER RETURNS NEW BRITANNIA MILL REFURBISHMENT PROJECT DEMONSTRATES SUCCESSFUL CAPITAL ALLOCATION TO MAXIMIZE RISK ADJUSTED RETURNS Hudbay acquired New Britannia in 2015 for $12M as a potential gold processing solution for high-grade Lalor Au and Cu-Au ore, providing for addit

  13. Slide 13: Snow Lake Cost Performance

    SNOW LAKE COST PERFORMANCE IN 2024 SNOW LAKE WAS THE HIGHEST MARGIN GOLD MINE IN CANADA Higher Margin Large-scale (>150 koz) Canadian Gold Mines Lower Margin '24 All-In Sustaining Costs (US$/oz)1 $1,620 ~70% AISC margin at current gold prices $1,475 $1,500 $1,510 $1,370 $1,230 $1,239 $1,250 $1,222 $

  14. Slide 14: Copper Mountain

    COPPER MOUNTAIN LONG LIFE COPPER MINE WITH OPTIONALITY 20 YEARS Cu-Au-Ag 45k tpd MINE LIFE PORPHYRY NAMEPLATE MILL DEPOSIT CAPACITY 47kt 35koz $1.89/lb 2024-2028E AVG. 2024-2028E AVG. 2024-2028E AVG. CU PRODUCTION1 AU PRODUCTION1 CASH COSTS1 COPPER MOUNTAIN PRODUCTION PROFILE2 60 56 $6.00 44-54 50 7

  15. Slide 15: Copper Mountain Optimization

    COPPER MOUNTAIN OPTIMIZATION ON TRACK TO CREATE LONG-TERM VALUE THROUGH OPTIMIZATION MATERIAL MOVED* MILL AVAILABILITY 95% Quarterly Material Moved *(Mt) 25 Mill Availability (%) 90% 20 15 85% 92% Acquisition Acquisition 10 21.4 80% 85% Hudbay 85% Hudbay 15.8 13.2 5 75% 0 CMMC 2022 Avg. H2 2023 2024

  16. Slide 16: 16

    16

  17. Slide 17: Robust Copper Market Outlook

    ROBUST COPPER MARKET OUTLOOK STRONG LONG-TERM COPPER MARKET FUNDAMENTALS WITH SIGNIFICANT SHORTAGE OF SUPPLY Declining Copper Grades GLOBAL COPPER SUPPLY AND DEMAND Base Case Operating No Significant Projects Sanctioned in Past 3-Years (Mt)1 Mines Capacity Market is increasingly dependent on executi

  18. Slide 18: Challenges of Supply Prediction

    CHALLENGES OF SUPPLY PREDICTION The analysis below compares the projected global copper production estimated by Wood Mackenzie, inclusive of development and expansion projects, as of 2020 Q3 to the latest 2024 Q3 estimates and 2020-2023 production actuals to understand how the market has changed fol

  19. Slide 19: A Look at Copper Pipeline Assumptions

    A LOOK AT COPPER PIPELINE ASSUMPTIONS PROBABLE AND POSSIBLE PIPELINE FACES SIMILAR CHALLENGES TO MEET SUPPLY PREDICTIONS Probable Projects (>75 ktpa Cu1) Possible Projects (Largest Contributors1) Production Production Timeline Production Production Timeline Production Production Timeline Project Pro

  20. Slide 20: Attractive Copper Positioning

    ATTRACTIVE COPPER POSITIONING SIGNIFICANT COPPER PRODUCTION AT FIRST QUARTILE CASH COSTS MEANINGFUL COPPER PRODUCTION LEADING LOW-COST PROFILE 2025E COPPER PRODUCTION1 2025E COPPER C1 CASH COSTS2 600 +$100M increase in cash flow and EBITDA +$56M increase in cash flow and EBITDA for for 10% change in

  21. Slide 21: Hudbay Leading Copper Exposure

    HUDBAY LEADING COPPER EXPOSURE SUSTAINED GROWTH IN COPPER RESOURCES PER SHARE DRIVES INDUSTRY LEADING COPPER PRICE OPTIONALITY SIGNIFICANT GROWTH IN COPPER RESOURCES PER SHARE1 HIGHEST COPPER NAV SENSITIVITY VERSUS PEERS2 (NAV SENSITIVITY TO 10% CHANGE IN COPPER PRICE) 50% +11% CAGR and +$189% growt

  22. Slide 22: Prudent Capital Allocation

    PRUDENT CAPITAL ALLOCATION COPPER WORLD REPRESENTS THE NEXT GENERATION OF LOW CAPITAL COPPER DEVELOPMENT Completed Greenfield Completed Brownfield Lower Capital Higher Capital Capital Intensity ($000s/tonne Cu)1,2 Country Rating Aaa Aaa Aaa Ca A2 A2 Baa3 Baa1 Baa1 Ca Baa1 Ca Baa2 A2 A2 Aaa A2 A2 Aaa

  23. Slide 23: Copper World Project

    COPPER WORLD PROJECT HIGHEST GRADE OPEN PIT COPPER PROJECT IN THE AMERICAS PHASE I FOOTPRINT REQUIRES STATE AND LOCAL PERMITS ONLY ATTRACTIVE ECONOMICS AT CONSERVATIVE $3.75 CU Private Land PRICE ASSUMPTIONS1 Perimeter $1.1B 19% 1.2Bt NPV8% IRR1 M&I TONNAGE $372M $1.3B AVG. ANNUAL INITIAL GROWTH EBI

  24. Slide 24: U.S. Open Pit Copper Benchmarking

    U.S. OPEN PIT COPPER BENCHMARKING WILL BE ONE OF THE LARGEST OPEN PIT COPPER MINES IN THE U.S. WITH THE LOWEST CASH COSTS ANNUAL PRODUCTION (KT CU) RESERVE GRADE (% CU) CASH COSTS (US$/LB CU) Morenci 261 Copper World 0.54% Copper World $1.53 Bingham Canyon 152 Ray 0.49% Robinson $2.16 Safford 111 Ch

  25. Slide 25: Potential Sanctioning Decision

    PRUDENTLY ADVANCING COPPER WORLD DISCIPLINED THREE PREREQUISITES (“3-P”) PLAN FOR SANCTIONING COPPER WORLD Completed Underway To Come In late 2022, Hudbay unveiled a Objective 2022 2023 2025 prudent financial plan with three 2024 2026 PLAN PERMITS key prerequisites to be achieved Updated ✓ MLRP ✓ Up

  26. Slide 26: Mason Project

    MASON PROJECT LARGE OPEN PIT COPPER PROJECT WITH SIGNIFICANT LAND PACKAGE 2.2Bt $1.76/lb 27 YEARS M&I TONNAGE CU SUSTAINING CASH COST MINE LIFE 0.29% 112kt $1,191M / 18% M&I CU GRADE ANNUAL CU PRODUCTION NPV / IRR 1 MASON ECONOMICS1 After-Tax NPV10% (US$M) Unlevered IRR (%) $2,019 23% 18% $1,191 15%

  27. Slide 27: 27

    27

  28. Slide 28: Constancia Exploration Potential

    CONSTANCIA EXPLORATION POTENTIAL SEVERAL OPPORTUNITIES EXIST ON HUDBAY’S EXTENSIVE LAND PACKAGE IN PERU CONSTANCIA SATELLITE EXPLORATION TARGETS Maria Reyna Constancia & Caballito Pampacancha 3.3Mt Cu Constancia DELINEATED TO-DATE 1.0Mt Cu MINED TO-DATE PERU Pampacancha Lima Tintaya Constancia Matar

  29. Slide 29: Constancia Priority Satellite Targets

    CONSTANCIA PRIORITY SATELLITE TARGETS EXPLORATION PERMITTING ACTIVITIES WELL UNDERWAY MARIA REYNA CABALLITO Artisanal mining activity focused on high grade magnetite skarn bodies and Mitsui mined high-grade copper at Caballito until the early 1990s; hand samples hydrothermal breccia. collected in th

  30. Slide 30: Lalor Near Mine Exploration

    LALOR NEAR MINE EXPLORATION 2M OZ OF GOLD RESERVES AND 1.5M OZ OF GOLD INFERRED RESOURCES WITH FURTHER EXTENSION POTENTIAL LALOR MINE LIFE EXTENSION LALOR NEAR MINE 0m 100m 250m 500m Lalor Northwest Exhaust raise 2024 drilling Shaft Lalor deep 2024 drilling 835mL 910mL 955mL 985mL Shaft bottom LEGEN

  31. Slide 31: Snow Lake Regional Exploration

    SNOW LAKE REGIONAL EXPLORATION 2024 Regional Geophysical Survey Completed on Cook Lake North Area Geophysical Electromagnetic Surveying  Large exploration program underway with modern geophysics and surface drilling, focused on recently acquired land including Cook Lake and former Rockcliff claims.

  32. Slide 32: Snow Lake Exploration Drilling

    SNOW LAKE EXPLORATION DRILLING LARGEST SNOW LAKE EXPLORATION PROGRAM IN COMPANY’S HISTORY PLAN VIEW OF LALOR & COOK LAKE CLAIMS Focused on near-mine extension at Lalor and the discovery of new deposits within trucking distance of processing infrastructure MULTI-PHASED DRILLING PROGRAM  2024 drillin

  33. Slide 33: 1901 Development & Exploration Drift

    1901 DEVELOPMENT & EXPLORATION DRIFT ADVANCING ACCESS TO THE 1901 DEPOSIT FOR EXPLORATION AND FUTURE MINE DEVELOPMENT The 1901 deposit was discovered in 2019 and is located within 1,000 EXPLORATION STEP OUT DRILLING metres of the Lalor underground ramp. Further drilling, metallurgical testing and pr

  34. Slide 34: Flin Flon Growth Opportunities

    FLIN FLON GROWTH OPPORTUNITIES GROWTH POTENTIAL THROUGH TAILINGS REPROCESSING OPPORTUNITY AND EXPLORATION PARTNERSHIP MILL TAILINGS REPROCESSING Opportunity to reprocess Flin Flon tailings where more than 100Mt of tailings have been deposited over 90 years. Potential for additional metal production

  35. Slide 35: 35

    35

  36. Slide 36: Commitment to Sustainability

    COMMITMENT TO SUSTAINABILITY REDUCING CARBON FOOTPRINT WATER AND BIODIVERSITY STEWARDSHIP Operations are well-positioned in the lower half of the Restoring ecosystems by progressively rehabilitating global GHG emissions curve for copper mines affected areas Pursuing improvements Committed to conserv

  37. Slide 37: Social Impact & Our People

    SOCIAL IMPACT & OUR PEOPLE EMBRACING DIVERSITY AND PROVIDING A HEALTHY & SAFE WORKPLACE • Constancia’s “Hatun Warmi” program expands opportunities for women in mining. • All operations are required to be certified to ISO 45001, an internationally accepted standard for occupational health and safety

  38. Slide 38: Environmental Stewardship

    ENVIRONMENTAL STEWARDSHIP DEVELOPING, OPERATING AND RECLAIMING MINES IN A MANNER THAT DEMONSTRATES OUR COMMITMENT TO ENVIRONMENTAL STEWARDSHIP COMMITTED TO FURTHER IMPROVE ON OUR LOW-CARBON FOOTPRINT PROGRESS TOWARDS ACHIEVING GHG TARGETS More than 50% of current total energy consumption is from ren

  39. Slide 39: Investment

    T & STMEN INVE Ric}

  40. Slide 40: Hudbay Investment Thesis

    HUDBAY INVESTMENT THESIS STABLE COPPER PRODUCTION with three operations in tier-1 mining jurisdictions generating Produced 137kt Cu generating+$350M in free cash flow at industry-low cash costs in 2024 significant free cash flow with industry-leading margins STRONGEST BALANCE SHEET Achieved 0.6x Net

  41. Slide 41: Several Near-Term Catalysts

    SEVERAL NEAR-TERM CATALYSTS FOCUSED ON DELIVERING MANY NEAR-TERM GROWTH INITIATIVES ACROSS THE PORTFOLIO TO GENERATE SIGNIFICANT VALUE FOR STAKEHOLDERS COPPER WORLD MANITOBA  Secure joint venture partnership  New Britannia further optimization  Complete definitive feasibility study  Snow Lake re

  42. Slide 42: 2025 Key Objectives

    2025 KEY OBJECTIVES IN 2025, HUDBAY INTENDS TO: 1. Deliver strong copper and gold production levels from diversified operating platform 2. Maintain strong operating cost performance, achieving industry-leading margins Always operate 3. Generate strong cash flow to enhance financial position for high

  43. Slide 43: 43

    43

  44. Slide 44: World-Class Management Team

    WORLD-CLASS MANAGEMENT TEAM PETER KUKIELSKI EUGENE LEI ANDRE LAUZON PRESIDENT & CEO CFO COO More than 30 years of sector experience in Over 20 years of global mining investment Over 30 years of experience, holding base metals, precious metals and bulk banking, finance and corporate development leade

  45. Slide 45: Board of Directors

    BOARD OF DIRECTORS DAVID SMITH PETER KUKIELSKI CHAIR PRESIDENT & CEO David more than 30 years of financial and Peter has more than 30 years of experience executive leadership experience. He has within the base & precious metals and bulk had a career on both the finance and the materials sectors, hav

  46. Slide 46: Production Guidance

    PRODUCTION GUIDANCE STEADY COPPER AND 2025 PRODUCTION GUIDANCE GOLD PRODUCTION Year Ended Contained Metal in Concentrate and Dore1 2025 Guidance 2024 Guidance Dec. 31, 2024 Consolidated Cu PERU production of 133,000 Copper tonnes 80,000 - 97,000 99,001 98,000 - 120,000 tonnes in 2025 remains Gold ou

  47. Slide 47: 2025 Cost Guidance

    2025 COST GUIDANCE CAPITAL EXPENDITURES1 ($M) EXPLORATION EXPENDITURES ($M) SUSTAINING CAPITAL2 2025 Guidance 2024 Actuals 2025 Guidance 2024 Actuals Peru3 170 124 Peru4 19 20 Manitoba5 30 26 Manitoba 60 46 British Columbia5 1 2 British Columbia3 135 123 Arizona and other - 2 Total sustaining capita

  48. Slide 48: Prudent Balance Sheet Management

    PRUDENT BALANCE SHEET MANAGEMENT ONLY DEBT OUTSTANDING CONSISTS OF LONG-TERM SENIOR UNSECURED BONDS LONG-TERM DEBT STRUCTURE PROVIDES SIGNIFICANT FLEXIBILITY Bond Ratings Callable starting in April 2023 Moody’s B1 S&P B 4.5% due Callable starting in April 2024 Apr. 2026 Fitch BB- 6.125% due Apr. 202

  49. Slide 49: South America Business Unit

    SOUTH AMERICA BUSINESS UNIT Cusco CUSCO Las Bambas CONSTANCIA PERU Yauri LLAGUEN Trujillo Tintaya Antapaccay Lima AREQUIPA Imata CONSTANCIA Arequipa MINE Cerro Verde MOQUEGUA & TOWN RAIL Matarani ROAD 0 100km Appendix: PERU TACNA 49

  50. Slide 50: Constancia Mine Plan

    CONSTANCIA MINE PLAN 17-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Updated mine plan for Constancia operations reflects higher copper and gold production into 2025 with the higher grades from the Pampacancha deposit and extended mine life to 2041 with the conversion of mineral resourc

  51. Slide 51: Maria Reyna Historical Drill Results

    MARIA REYNA HISTORICAL DRILL RESULTS A summary of the historical drill results from Maria Reyna is contained in the table below, however a qualified person has not independently verified this historical data or the quality assurance and quality control program that was applied during the execution o

  52. Slide 52: Llaguen Project

    LLAGUEN PROJECT COPPER PIPELINE PROJECT IN A FAVOURABLE LOCATION MINERAL RESOURCE ESTIMATE AS AT JANUARY 1, 2024 Metric Cu Mo Au Ag CuEq Category Tonnes (%) (g/t) (g/t) (g/t) (%) Indicated Global (>= 0.14% Cu) 271,000,000 0.33 218 0.033 2.04 0.42 Including Indicated High-grade 113,000,000 0.49 261 0

  53. Slide 53: Manitoba Business Unit

    MANITOBA BUSINESS UNIT New Britannia Gold Mill 1,800 tpd capacity Snow Lake Stall Base Metal Mill LALOR MINE 3,800 tpd capacity ~4,500 tpd LALOR 0 5km MANITOBA SASKATCHEWAN Winnipeg Snow Lake LALOR MINE MINE Flin Flon MILL TOWN Flin Flon Base Metal Mill* RAIL care & maintenance (6,000 tpd capacity)

  54. Slide 54: Snow Lake Mine Plan

    SNOW LAKE MINE PLAN 14-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Mine plan optimizes processing capacity in Snow Lake to maximize the NPV of the operations. 2028-2037 SNOW LAKE OPERATIONS1 2022A 2023A 2024 2025 2026 2027 Avg. CONTAINED METAL IN CONCENTRATE AND DORÉ Au Production (000

  55. Slide 55: Snow Lake Process – 2025

    SNOW LAKE PROCESS – 2025 Lalor Lalor Crushed Crushed Ore Ore Stall Mill New Britannia Mill Grinding Grinding Flotation Flotation Tails to Tails Cyanide Zn Concentrate Cu Concentrate Anderson TIA or Leaching/CIP Destruction Dewatering Dewatering Lalor Paste Plant Process Electrowinning Tails to Stall

  56. Slide 56: Snow Lake Growth Over Time

    SNOW LAKE GROWTH OVER TIME OVER 3.0M OUNCES OF GOLD HAS BEEN IDENTIFIED AS RESERVES / PRODUCED TO DATE +250% INCREASE IN IDENTIFIED RESERVES / PRODUCED GOLD FROM INITIAL RESERVE ESTIMATE 7% increase Reserves 32% increase from 9% increase from resource Inferred Produced to-date inclusion of satellite

  57. Slide 57: Snow Lake Region Land Package

    SNOW LAKE REGION LAND PACKAGE Hudbay’s existing properties include the Lalor mine, the 1901 deposit, 3 Zone, WIM, Watts, Chisel Lake (past producing), Photo Lake (past producing), Cook Lake North and South, as well as the acquired Rockcliff properties, including Talbot, Bur, tower, Rail and Pen. 202

  58. Slide 58: Lalor Northwest Drilling

    LALOR NORTHWEST DRILLING FOLLOW UP DRILLING CONFIRMS NEW DISCOVERY NORTHWEST OF THE LALOR DEPOSIT Lalor Section View with New Discovery Located ~400m from Underground Infrastructure Intersected Significant Lalor Northwest Copper-Gold Mineralized Mineralization Intercepts  2024 follow up drilling co

  59. Slide 59: Flin Flon Closure Cost Plan

    FLIN FLON CLOSURE COST PLAN 75% OF CLOSURE AND RECLAMATION COSTS ARE TO BE INCURRED AFTER 2037 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2122 $23M in tailings stability $13M in demolition costs between the close of Flin Flon and 203

  60. Slide 60: British Columbia Business Unit

    BRITISH COLUMBIA BUSINESS UNIT Kamloops NEW AFTON MINE HIGHLAND VALLEY COPPER MINE Kelowna COPPER MOUNTAIN Princeton COPPER MOUNTAIN Vancouver MINE MINE 0 20km TOWN ROAD Appendix: BRITISH COLUMBIA 60

  61. Slide 61: Copper Mountain Mine Plan

    COPPER MOUNTAIN MINE PLAN 20-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Updated mine plan for Copper Mountain operations reflects mine stabilization plan advancements and increased mine productivity. 2024-2028 2029-2033 2034-2038 2039-2043 COPPER MOUNTAIN OPERATIONS 2024 20255 20265 2

  62. Slide 62: Copper Mountain Technical Report

    COPPER MOUNTAIN TECHNICAL REPORT Steady-state Operations Stabilization & Optimization Plans 21 years 50k tpd Improving reliability and driving sustainable long-term value: 1. Increased mining activities Mine Life Permitted mill capacity Fleet ramp-up plan to remobilize idle haul trucks, 28 trucks re

  63. Slide 63: Copper Pipeline with Significant Growth

    COPPER PIPELINE WITH SIGNIFICANT GROWTH STEADY COPPER PRODUCTION WITH SEVERAL NEAR-TERM AND LONG-TERM GROWTH OPPORTUNITIES 1 Mason Cu Maria Reyna / (kt) Kusiorcco Llaguen Copper World Phase II Constancia Phase 10 Maria Reyna SW Caballito Constancia Norte Copper World Phase I Constancia Continuous Im

  64. Slide 64: Gold Pipeline with Significant Growth

    GOLD PIPELINE WITH SIGNIFICANT GROWTH STRONG GOLD PRODUCTION OFFERS COMPLEMENTARY CASH FLOWS WITH UPSIDE POTENTIAL Regional Lalor Au 1 Exploration (koz) Satellite Deposit Extensions Snow Lake and Flin Flon Greenfield Exploration Lalor Near Mine Extension Tailings Reprocessing Cook Lake & Talbot New

  65. Slide 65: Arizona Business Unit

    ARIZONA BUSINESS UNIT Miami Pinto Valley Phoenix Resolution Ray ARIZONA, US Morenci Florence Cactus Safford Santa Cruz Silver Bell Tucson Phoenix Gunnison Tucson Mission Sierrita COPPER WORLD COPPER WORLD Maps are not to scale Hermosa 0 25km 50km Port of Guaymas (Mexico) Appendix: ARIZONA 65

  66. Slide 66: Copper World PFS Highlights

    COPPER WORLD PFS HIGHLIGHTS LARGE SCALE, HIGH-GRADE OPEN PIT WITH ATTRACTIVE ECONOMICS & SIGNIFICANT UPSIDE Large Reserve Base with Meaningful Resource Upside on a Significant Land Package 385Mt reserves support 20 years of Phase I mine life, which is only ~30% of the ~1.2Bt of M&I resources1 Land p

  67. Slide 67: Copper World 2023 PFS

    COPPER WORLD 2023 PFS SIMPLIFIED PROJECT DESIGN Simplified mine plan consists of four open pits and is now optimized solely on the flotation of both copper sulfides and oxides. Simplified processing flow sheet includes conventional sulfide flotation concentrator with copper concentrate as final prod

  68. Slide 68: Copper World Phase I PFS

    COPPER WORLD PHASE I PFS ENHANCED PROJECT ECONOMICS, SIMPLIFIED FLOWSHEET AND EXTENDED MINE LIFE TO 20 YEARS Annual Cu production of 92kt over the first 10 years at $1.53/lb COPPER PRICE SENSITIVITY ($M) cash costs and $1.95/lb sustaining cash costs. NPV 10% NPV 8% 2,006 1,710 Life-of-mine Cu produc

  69. Slide 69: Copper World Funding Requirement

    COPPER WORLD FUNDING REQUIREMENT JOINT VENTURE REDUCES HUDBAY’S FUNDING REQUIREMENT AND ENHANCES RETURNS IRR: ~19% Corresponding Illustrative IRR (%) Funding Requirement ($M) & IRR: ~25% IRR: +35% Appendix: ARIZONA Source: Company public filings, analyst research Note: IRR based on Copper World PFS

  70. Slide 70: Copper World Robust Economics

    COPPER WORLD ROBUST ECONOMICS SUMMARY OF KEY METRICS Phase I - 20 year mine life (at $3.75/lb Cu) • Cu production avg. 85 kt p.a. Valuation Metrics (Unlevered)1 Units Phase I • Cash costs of $1.47/lb and sustaining Net present value @ 8% (after-tax) $ millions $1,100 cash cost of $1.81/lb. Net prese

  71. Slide 71: Copper World Phase I

    COPPER WORLD PHASE I PRODUCTION PROFILE Phase I Average Annual Production: 85kt Cu Cash Costs: $1.47/lb Cu Sustaining Cash Costs: $1.81/lb Cu Appendix: ARIZONA For further information please refer to Hudbay’s news release dated September 8, 2023, announcing the PFS results. Tonnes shown are metric t

  72. Slide 72: GHG Emissions

    DESIGNED TO REDUCE ENERGY CONSUMPTION AND GHG EMISSIONS MADE IN AMERICA” COPPER CATHODE TO SUPPORT DOMESTIC U.S. COPPER CONSUMPTION ↓10% ↓14% lower energy consumption, reduction in total scope including 30% decline related 1, 2 & 3 GHG emissions to downstream processing • Copper World copper cathode

  73. Slide 73: Copper World Positioning

    COPPER WORLD POSITIONING ONE OF THE BEST UNDEVELOPED COPPER PROJECTS – CAPITAL LIGHT, LOW COMPLEXITY Source: Company public filings; Street research. Appendix: ARIZONA Note: Peer set comprised of greenfield, open pit, porphyry projects with reserves located in the Americas, with LOM average Cu produ

  74. Slide 74: Nevada – Mason Project

    NEVADA – MASON PROJECT Power Plant Lyon County Douglas County NEVADA MacArthur Reno Yerington Blue Hill Mine (Historic) MASON PROJECT MASON Yerington Mason TOWN Las Vegas Road HUDBAY MINERAL CLAIMS Pumpkin Hollow HUDBAY PRIVATE LAND CLAIMS Mason POWER LINE Valley Mines RAIL (Historic) MINE / DEPOSIT

  75. Slide 75: Exploration Cannot Solve the Supply Gap

    EXPLORATION CANNOT SOLVE THE SUPPLY GAP S&P STUDIED 136 MINES OVER 20 YEARS & IT TAKES AN AVERAGE OF 16 YEARS FROM DISCOVERY TO PRODUCTION Russian and Indonesian mines take the longest to start up1 16.3 years Lead times continue to trend upward: ~18 years for mines coming online in 2020-2023 vs. ~13

  76. Slide 76: Peru Mineral Reserves (as at January 1, 2024)

    PERU MINERAL RESERVES (AS AT JANUARY 1, 2024) MINERAL RESERVE ESTIMATES1,2,3,4,5 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Proven 465,600,000 0.260 78 0.038 2.63 Probable 61,600,000 0.212 64 0.034 2.24 CONSTANCIA – TOTAL PROVEN AND PROBABLE 527,200,000 0.254 76 0.037 2.59 PAMPACANCHA Prove

  77. Slide 77: Peru Mineral Resources (as at January 1, 2024)

    PERU MINERAL RESOURCES (AS AT JANUARY 1, 2024) MINERAL RESOURCE ESTIMATES1,2,3,4,5 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Measured 78,400,000 0.213 74 0.039 2.20 Indicated 93,100,000 0.224 90 0.040 1.98 Inferred – Open Pit 29,700,000 0.233 68 0.056 2.58 Inferred – Underground 6,500,000

  78. Slide 78: Snow Lake Reserves – Lalor Mine & 1901 Deposit

    SNOW LAKE RESERVES – LALOR MINE & 1901 DEPOSIT (AS AT JANUARY 1, 2024) MINERAL RESERVE CATEGORY TONNES Au (g/t) Zn (%) Cu (%) Ag (g/t) ESTIMATES1,2,3,4,5,6,7,8 Gold Zone Reserves Proven Lalor 3,263,000 5.5 0.73 0.59 29.6 1901 102,000 2.8 1.33 1.00 19.2 Probable Lalor 3,678,000 4.5 0.37 1.22 22.1 190

  79. Slide 79: Snow Lake Resources – Lalor Mine & 1901 Deposit

    SNOW LAKE RESOURCES – LALOR MINE & 1901 DEPOSIT (AS AT JANUARY 1, 2024) MINERAL RESOURCE CATEGORY TONNES Au (g/t) Zn (%) Cu (%) Ag (g/t) ESTIMATES1,2,3,4,5,6,7,8 Gold Zone Resources Inferred Lalor 2,979,000 4.3 0.24 1.68 25.7 1901 1,605,000 5.4 0.30 0.84 16.5 Total Inferred – Gold 4,584,000 4.7 0.26

  80. Slide 80: Snow Lake Reserves & Resources – Other Gold

    SNOW LAKE RESERVES & RESOURCES – OTHER GOLD (AS AT JANUARY 1, 2024) GOLD MINERAL RESERVE AND RESOURCE CATEGORY TONNES Au (g/t) Zn (%) Cu (%) Ag (g/t) ESTIMATES1,2,3,4,5,6,7 Probable Reserves WIM Probable 2,450,000 1.6 0.25 1.63 6.3 3 Zone Probable 660,000 4.2 - - - TOTAL PROBABLE (GOLD) 3,110,000 2.

  81. Slide 81: Snow Lake Reserves & Resources – Other Base Metals

    SNOW LAKE RESERVES & RESOURCES – OTHER BASE METALS (AS AT JANUARY 1, 2024) BASE METAL MINERAL RESERVE AND RESOURCE CATEGORY TONNES Au (g/t) Zn (%) Cu (%) Ag (g/t) ESTIMATES1,2,3,4,5,6,7 Indicated Resources PEN II Indicated 470,000 0.3 8.89 0.49 6.8 Talbot* Indicated 2,190,000 2.1 1.79 2.33 36.0 TOTA

  82. Slide 82: BC Mineral Reserve and Resource Estimates

    BC MINERAL RESERVE AND RESOURCE ESTIMATES (AS AT JANUARY 1, 2024) CuEq Grade MINERAL RESERVE AND RESOURCE ESTIMATES1,2,3,4,5,6 TONNES Cu (%) Au (g/t) Ag (g/t) (%) RESERVES Proven 195,000,000 0.27 0.12 0.8 0.35 Probable 172,000,000 0.22 0.11 0.6 0.30 TOTAL PROVEN AND PROBABLE 367,000,000 0.25 0.12 0.

  83. Slide 83: Copper World Mineral Reserve & Resource Estimates

    COPPER WORLD MINERAL RESERVE & RESOURCE ESTIMATES (AS AT JANUARY 1, 2024) Soluble Cu MINERAL RESERVE AND RESOURCE ESTIMATES1,2,3,4,5,6 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) Grade (%) RESERVES Proven reserves 319,400,000 0.54 0.11 110 0.03 5.7 Probable reserves 65,700,000 0.52 0.14 96 0.02 4.3 Tot

  84. Slide 84: Llaguen Mineral Resources

    LLAGUEN MINERAL RESOURCES (AS AT JANUARY 1, 2024) MINERAL RESOURCE ESTIMATES1,2,3,4,5,6 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CuEq (%) Indicated Global 271,000,000 0.33 218 0.033 2.04 0.42 (≥ 0.14% Cu) Including Indicated High-grade 113,000,000 0.49 291 0.046 2.73 0.60 (≥ 0.30% Cu) Inferred Globa

  85. Slide 85: Mason Mineral Resources

    MASON MINERAL RESOURCES (AS AT JANUARY 1, 2024) MINERAL RESOURCE ESTIMATES1,2,3,4,5 TONNES Cu (%) Mo (g/t) Au(g/t) Ag (g/t) Measured 1,417,000,000 0.29 59 0.031 0.66 Mason Indicated 801,000,000 0.30 80 0.025 0.57 TOTAL MEASURED AND INDICATED 2,219,000,000 0.29 67 0.029 0.63 Mason Inferred 237,000,00

  86. Slide 86: Additional Information

    ADDITIONAL INFORMATION The reserve and resource estimates included in this presentation were prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Standards on Mineral Resourc