Chalice Gold Mines — Investor Presentation (February 2010)
24 slides from Chalice Gold Mines's investor presentation, February 2010
Slide 1: Corporate Presentation – Cornerstone of an African Gold Business
ASX: CHN “Cornerstone of an African Gold Business ” Corporate Presentation February 2010 www.chalicegold.com.au
Slide 2: Snapshot
Snapshot • Key y asset: 80%‐owned Zara Gold Project, j , Eritrea (East Africa) • Definitive Feasibility y Studyy due mid‐2010 • JORC resource 944,000oz @ 5.8g/t Au • Targeting initial high‐margin high margin production of 110,000oz pa • Forecast o ecast US$ US$424/oz/o cash cas operating ope at g co
Slide 3: Corporate
Corporate Snapshot 6 month share price • Shares Sh on issue i 137.4M 137 4M • Options on Issue 10.075M • Cash (Dec (Dec’09) 09) $7 3M $7.3M Board • Tim Goyder d (Executive Chairman) • Dr Doug Jones (Managing Director) • Mike Mik GGriffiths iffi h (Executive Director) • Anthony Kiernan (Non‐Executive
Slide 4: Zara – Project Location
Zara – Project Location • Emerging gold & base metal province • Gold endowment >20Moz – numerous deposits and mines dating back to ancient times • Minimal modern exploration • New world‐class projects being developed: • 13Moz Sukari Gold Mine (Egypt) – in p production (Centamin) ( ) • Bisha Gold & B
Slide 5: Zara – Project Location
Zara — Project Location chalice Gotp MINES Zara Project Koka Discovery RITREA e e Keren hero lat nana Nevsun eee Deira! Discovery Bisha pee. Discovery Oadi Keylan ae. Ethiopia
Slide 6: Zara Project – Regional Setting
Zara Project – Regional Setting • Major regional structural corridor controls gold occurrences • Granted tenements cover 50km strike on this corridor (~600km²) ( 600km ) • Numerous prospects identified from artisanal gold workings • Koka Deposit has been main focus of exploration to date 6
Slide 7: Koka Gold Deposit
Koka Gold Deposit • JORC compliant resource of 5.04Mt @ 5.8 5 8 g/t /t Au A ffor 944,000oz 944 000 • Based on results from 109 diamond drill holes (~18,000m (~18 000m drilled) • 600m strike length, 20‐30m wide and open at depth • Only drilled to 250m below surface • Bulk of resource shallower than 1
Slide 8: Koka Gold Deposit – Looking North
Koka Gold Deposit – Looking North Artisanal Workings 8
Slide 9: Koka Gold Deposit – 3D Model
Koka Gold Deposit – 3D Model 9
Slide 10: Koka Gold Deposit – Cross Sections Recent Drilling
Koka Gold Deposit – Cross Sections Recent Drilling 10
Slide 11: Koka Gold Deposit – In-fill Drilling
Koka Gold Deposit – In‐fill Drilling Hole From To Interval Gold (m) (m) (m) (g/t) ZARD128 44 75 31 6.48 including 44 46 2 38.22 including 52 55 3 18.68 79 82 3 7.78 104 108 4 3.25 116 117 1 31.48 143 144 1 100.5 4 ZARD 129 10 19 9 6.13 32 40 8 9.47 ZARD 130 6 12 6 26.92 29 46 17 4 66 4.66 ZARD 131 1
Slide 12: Koka Gold Deposit – Mineralisation
Koka Gold Deposit – Mineralisation • Quartz‐carbonate‐sulphide stockwork veins cutting microgranite – similar in style to Sukari gold mineralisation • Visible gold & high gold values associated with sulphides in quartz‐carbonate veins • Sulphides overall less than 2% – no impact on metallurgy – free
Slide 13: Koka Gold Deposit – Metallurgy
Koka Gold Deposit – Metallurgy • Metallurgical testwork at AMMTEC Perth completed • Laboratory master composite prepared from 104 intervals representative of deposit • Initial test work indicates ore is metallurgically benign: • ~60% of gold recoverable by gravity • Overall recoveries 95‐97% for gri
Slide 14: Scoping Study – Key Parameters
Scoping Study – Key Parameters Parameter Average gold production ~110 000 oz per annum ~110,000 Life of mine ~ 6 years Total capital costs US$97.8 million Total cash costs US$424 per oz Total gold mined 712,000 oz Gold recoveries 95% Gold produced 677,000 oz Plant capacity 500,000 tpa Mining costs U
Slide 15: Development Program
Development Program • Lycopodium to complete Feasibility Study by mid‐2010: mid 2010: • 5,000m of diamond drilling to upgrade resource completed • Hydrological drilling – initial holes indicate adequate water supply • Metallurgical test work complete • Geotech drilling completed • Socio‐economic stu
Slide 16: Koka Exploration – Near Mine
Koka Exploration – Near Mine • Exploration to date has ffocused d on Kokak Main Zone – very little drilling outside this target g • Other targets identified in immediate vicinityy include: • Koka South Extension – IP resistivity anomaly • Koka East – artisanal workings on high‐grade quartz veins 16
Slide 17: Koka South
Koka South • Strong IP resistivity anomaly identified 500m to the south of Koka • Ground G d follow‐up f ll confirmed zone of silica‐ sericite altered microgranite • Limited drilling confirmed Koka‐style mineralization ‐ up to 92g/t over 1m • Potential ‘blind’ system open down plunge to south 17
Slide 18: Koka East
Koka East • Hangingwall of Koka Main Zone • Artisanal workings and prospecting p p g pits p over 500m strike • Koka‐style alteration and quartz stockwork mineralisation in microgranite • Outcrops over 50m width with rock chip samples up to 18 g/t • Very V littl little sampling li tot date d t • Firs
Slide 19: Zara Project – Regional Potential
Zara Project – Regional Potential • No exploration p in district before 1998 when Koka was discovered • Koka g geological g settingg extends throughout ~600km² tenement block • Numerous prospects identified from artisanal gold workings • Drainage BLEG geochemical anomalies identified – to be followe
Slide 20: Landsat Interpretation
Landsat Interpretation • Study covered ~38,000km² • ~60 new targets identified within 615km² CHN tenement block • Both B th goldld (K (Koka‐type) k t ) & VHMS (Bisha‐type) base metal targets identified • Field work has already validated some of the targets on the ground • Regional structural interpr
Slide 21: Eritrea Overview
Eritrea Overview • Stable operating and social environment • Proactive Government stance on mining developments – “open for business” • Modern Mining Code • Increasing foreign exploration & mining investment – 13 groups now active i in i country 21
Slide 22: Summary
Summary • Focused growth strategy via development off high‐grade Koka Gold Deposit • Targeting near‐term production of ~110,000oz 110 000 pa from f current ~1Moz 1M resource • Feasibility F ibilit Study St d due d mid‐2010 id 2010 • Strategic ground position in emerging gold & base b metal t l provi
Slide 23: Disclaimer & Competent Person's Statement
Disclaimer & Competent Person’s Statement • This presentation may contain value references and "forward looking statements“ which are subject to various risks and uncertainties that could cause actual results and future events to differ materially f from those h expressedd or iimplied li d b by such
Slide 24: Cornerstone of an African Gold Business
ASX: CHN “Cornerstone of an African Gold Business ” Corporate Presentation February 2010 www.chalicegold.com.au
Chalice Gold Mines — Investor Presentation (February 2010) on 6ix