  1. Slide 1: Jaiprakash Power Ventures Limited Investor Presentation

    CONFIDENTIAL Jaiprakash p Power Ventures Limited Investor Presentation JUNE 2012 1

  2. Slide 2: Disclaimer

    CONFIDENTIAL Disclaimer This presentation is strictly confidential and may not be copied, published, distributed or transmitted in whole or in part, by any medium or in any form for any purpose. The information in this presentation is being provided by the Jaiprakash Power Ventures Limited (the “Com

  3. Slide 3: Overview of Jaypee Group

    CONFIDENTIAL Overview of Jaypee Group 3

  4. Slide 4: Corporate Structure

    Corporate Structure Jaiprakash p Associates Limited (JAL) ( ) E&C Cement – 31.6 MTPA Listed company Real Estate & Hospitality BOO Power Cement Infrastructure 67.9% Jaiprakash Power Ventures Ltd (JPVL) Jaypee Infratech Limited 300 MW Baspa – II HEP # Cement JVs (JIL) 400 MW Vishnuprayag HEP # (4.3 MT

  5. Slide 5: Demonstrated Execution Capability of JAL – Completed HEPs

    CONFIDENTIAL Demonstrated Execution Capability of JAL – Completed p HEPs Generating g 9840 MW between 2002-2011 JAL is the leader in the construction of multi-purpose river valley and hydropower projects and has been involved in construction of major engineering projects over the last 4 decades Bagh

  6. Slide 6: JPVL's Business Overview

    CONFIDENTIAL JPVL’s JPVL s Business Overview 6

  7. Slide 7: Jaiprakash Power Ventures - USPs

    CONFIDENTIAL Jaiprakash Power Ventures - USPs 9 Strong Parentage: JAL’s expertise in Infrastructure projects and project execution capabilities 9 Only private player to operate 1.7GW of Hydro: No fuel risk 9 Fuel Diversification: Thermal / Hydro Mix of 60 : 40 – Fuel cost pass thru in all coal fired

  8. Slide 8: Power Business at a Glance

    CONFIDENTIAL Power Business at a Glance Merchant Capacity Regulated VERs/ S.N. Project Fuel Power COD (MW) Tariff (MW) CERs (MW) 1. Baspa-II# Hydro 300 300 - 1.00 Mn VERs 2003 2. Vishnuprayag# Hydro 400 400 - 1.32 Mn.VERs 2006 3. Karcham Wangtoo# Hydro 1,000 - 1000 3.35 Mn. CERs* 2011 4. Bina Power

  9. Slide 9: Power Capacity in Operation/Under Advanced Stages of Implementation

    CONFIDENTIAL Power Capacity in Operation/ Under Advanced Stages of Implementation p Capacity Financial S.N. Project Location Fuel Equipment Supplier (MW) Closure Current Capacity 1. Baspa-II H.P. 300 Hydro VA Tech (Austria), Voith (Germany), Alstom (France) 9 (Operational) 2. Vishnuprayag U.K. 400 H

  10. Slide 10: Thermal Hydro Mix & Merchant Power Capacity

    Thermal Hydro y Mix & Merchant Power Capacity p y Thermal : Hydro Mix of Power Capacity Sales Mix of 1000 MW Karcham Wangtoo HEP (as of 31st Mar, 2012) UI@Rs3.11 41% 31% 38% 42% / it /unit 2% 77% 100% Power 59% 69% 62% 58% Exchange@ / Rs3.68/unit 23% 24% GoHP Bilateral@ CY11 CY12 CY13 CY14 CY17 CY20

  11. Slide 11: Power Business – Summary of Project Status: Hydro

    CONFIDENTIAL Power Business – Summary y of Project j Status: Hydro y Project Land Water Environment DPR/EPC Fuel PPA Equity upto Mar '12 Clearance Order (R mn)) (Rs Baspa II PROJECT IN OPERATION 100 % PPA 4,910 300 MW Vishnuprayag PROJECT IN OPERATION 100 % PPA 5,090 400MW Karcham 100% Wangtoo PROJE

  12. Slide 12: Power Business – Summary of Project Status: Thermal

    CONFIDENTIAL Power Business – Summary y of Project j Status: Thermal Order for Equity Environment Project Land Water Plant & Fuel PPA upto Mar '12 Clearance Machiner (Rs mn) Bina I 9 70% GoMP 9 9 9 9 FSA to be 30% Merchant 8,760 500 MW executed shortly (Fuel cost pass thru in PPA) Bina II Approval f

  13. Slide 13: Financial Summary

    CONFIDENTIAL Financial Summary 13

  14. Slide 14: Jaiprakash Power Ventures - Financial Performance

    CONFIDENTIAL Jaiprakash p Power Ventures - Financial Performace In INR Mn (US$Mn) ANNUAL Growth w.r.t. Particulars FY 2010 FY 2011 FY 2012 FY 11 7,178 8,407 16,863 Revenue 101% (144) (168) (337) 6,349 7,235 15,267 EBIDTA 111% (127) (145) (305) 2,516 1,651 4,029 PAT 144% ( 0) (50) (33) (81) Income Ta

  15. Slide 15: Selected financial information

    CONFIDENTIAL Selected financial information Balance Sheet Rs mn (US$ mn) Particulars JPVL FY 2010 FY 2011 FY 2012 N t worth Net th 33 778 (675) 33,778 51 706 (1,034) 51,706 (1 034) 54 650 (1,093) 54,650 (1 093) Secured & Unsecured 53,746 (1,075) 120,681 (2,414) 148,124 (3,170) D bt Debt Net Fixed As

  16. Slide 16: Shareholding Pattern – Jaiprakash Power Ventures Limited

    CONFIDENTIAL Shareholding g Pattern* – Jaiprakash p Power Ventures Limited All figures in % S.N. Category JPVL 1 P Promoters t 76 1 76.1 2 Trust 13.1 3 FIIs 0.8 4 Mutual Funds 1.7 5 Bodies Corporate 1.1 6 Public Financial Institutions 0.7 7 Banks 1.7 8 Public 4.8 TOTAL 100.0 No. of Shares (in Crs) 2

  17. Slide 17: Project Details

    CONFIDENTIAL Project Details 17

  18. Slide 18: Baspa-II HEP - 3x100 MW

    CONFIDENTIAL Baspa-II p HEP - 3x100 MW Project Detail Description Location & size 300 MW Hydro Power Project in Himachal Pradesh Concession Period 40 + 20 Years Total project cost Rs. 1,667 Crores Means of finance Debt – Rs. Rs 11,089 089 Crores Equity – Rs. 491 Crores Internal Accruals – Rs. 87 Cro

  19. Slide 19: Vishnuprayag HEP - 4x100 MW

    CONFIDENTIAL Vishnuprayag p y g HEP - 4x100 MW Project Detail Description Location & size 400 MW Hydro Power Project in Uttrakhand Concession Period 30 + 20 Years Total project cost Rs. 1,694 Crores Means of finance Debt – Rs. Rs 11,185 185 Crores Equity – Rs. 509 Crores Current status In operation

  20. Slide 20: Karcham Wangtoo HEP - 4x250 MW

    CONFIDENTIAL Karcham Wangtoo g HEP - 4x250 MW Project Detail Description Location & size 1,000 MW Hydro Power project in Himachal Pradesh Concession Period 35+20 Years Total project cost Rs. 6,900 Crores Means of finance Debt – Rs. 4,890 Crores Equity – Rs. 2,010 Crores Current status In operation s

  21. Slide 21: Jaypee Powergrid Limited - 214 KM Power Transmission Project

    CONFIDENTIAL Jaypee Powergrid Limited - 214 KM Power Transmission Project j Project Detail Description Location & size 214 km transmission project to evacuate power from 1 000 MW Karcham-Wangtoo 1,000 Karcham Wangtoo project Concession Period Owned Total project cost Rs. 1,000 Crores Means of financ

  22. Slide 22: Bina TPP – 500 MW

    CONFIDENTIAL Bina TPP – 500 MW Project Detail Description Location & size 500 MW Thermal Power Plant in Dist. Bina in Madhya P d h Pradesh. Concession Period Owned Total p project j cost Rs. 3,240 , Crores Means of finance Debt – Rs. 2,268 Crores Equity – Rs. 972 Crores Expected Commissioning 2012 O

  23. Slide 23: Nigrie TPP - 2X660 MW

    CONFIDENTIAL Nigrie g TPP - 2X660 MW Project Detail Description Location & size 1320 MW super critical technology boiler, pit head based Th Thermal l Power P Plant Pl t att Dist Di t Sidhi in i Madhya M dh Pradesh P d h Coal Blocks Coal from Mines at Amelia (North) & Dongri Tal-II j Total project co

  24. Slide 24: Bara TPP – 3x660 MW

    CONFIDENTIAL Bara TPP – 3x660 MW Project Detail Description Location & size 1,980 MW super critical technology boiler based Project i Bara, in B Allahabad, All h b d Uttar Utt Pradesh P d h Concession Period Owned Total project cost Rs. 10,780 Crores for Phase - I Means of finance Debt – Rs. 8,085 C

  25. Slide 25: Thank You

    CONFIDENTIAL THANK YOU 25