Slide 1: Products Pipelines
ENERGY PARTNERS, L.P. Products Pipelines Tom Bannigan President Products Pipeline Group
Slide 2: Products Pipelines Assets
ENERGY PARTNERS, L.P. Products Pipelines Assets West NGL Southeast Terminal Transmix 1
Slide 3: Fundamental Demand Drivers in Place
ENERGY PARTNERS, L.P. Fundamental Demand Drivers in Place Demographics of Markets Served Population Growth Urban Congestion Suburban Spread Price/Demand Modest Inroads of Hybrids/Alternative Fuel Vehicles % of Hybrids on Road U.S. Fleet Turnover Biofuels Present Additional Opportunities
Slide 4: Price Projections
ENERGY PARTNERS, L.P. Price Projections 3
Slide 5: Price/Demand
ENERGY PARTNERS, L.P. Price/Demand 10,000 $2.50 9,000 8,000 $2.00 7,000 US Motor Gasoline Finished Supplied (000's BPD) 6,000 $1.50 5,000 US Annual Retail Sales 4,000 $1.00 Average Price (cents per gallon) 3,000 2,000 $0.50 1,000 0 $0.00 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 20
Slide 6: Expanding and Acquiring to Meet Market Demand
ENERGY PARTNERS, L.P. Expanding and Acquiring to Meet Market Demand Expansion Projects Underway Project Description In Service Cost ($MM) Pacific Fresno Terminal Expansion 1- 80MB tank & 2 lane truck loading rack 2008 $11.0 Colton Terminal Expansion 2 - 80MB tanks 2008 $8.5 Miramar Expansion 2 - 80M
Slide 7: East Line Expansion
ENERGY PARTNERS, L.P. East Line Expansion Project currently under way to expand the El Paso to Phoenix/Tucson East Line El Paso to Phoenix Expansion – $145 MM cost with estimated completion date in Q4 2007 127 miles of looped 16” pipeline from El Paso to Tucson 13 miles of 12” gathering line A
Slide 8: East Line Expansion
ENERGY PARTNERS, L.P. East Line Expansion CURRENT 16” 8" / 12" / 8" NEW DJ 12" PX TU 12" / 16" / 12" TANK 8" 12" EP FARM EXPANSION 16" NEW DJ P/S 12" 16" 8" PX TU TANK 12" EP FARM 7
Slide 9: Calnev Expansion
ENERGY PARTNERS, L.P. Calnev Expansion Several projects to expand the Calnev pipeline system 2006 - $23.7 MM in total approved projects Las Vegas Terminal Expansion Provide additional 160,000 Bbls of tankage for gasoline, diesel, and ethanol Optimize storage of product slate Completion Februar
Slide 10: Military Expansions
ENERGY PARTNERS, L.P. Military Expansions Nellis AFB, NV – $10.9 MM 5.3 miles of 8” pipe 20 MB storage tanks and filtration In-service August 2006 Miramar, CA Station - $15 MM Provides 160,000 Bbls of tankage for JP-5 & Marine Diesel Delivery pump and metering facilities Expected in-serv
Slide 11: Tampa Pipeline
ENERGY PARTNERS, L.P. Tampa Pipeline Project description Construct 9 mile 8” pipeline from KM Tampa Terminal to Tampa International Airport and install 120k bbl jet fuel tank – total project cost $25 million Start-up expected 18 months from execution of agreement with airline consortium Business dri
Slide 12: Renewable Fuel Opportunities (Ethanol & Biodiesel)
ENERGY PARTNERS, L.P. RENEWABLE FUEL OPPORTUNITIES (Ethanol & Biodiesel) 2006 Mandate 4 Billion Gallons = 95 Million Barrels = 261,000 Barrels Per Day 2012 Mandate 7.5 Billion Gallons = 179 Million Barrels = 490,000 Barrels Per Day Strong political support for increased biofuels mandates Calif
Slide 13: Renewable Fuel Opportunities (Continued)
ENERGY PARTNERS, L.P. Renewable Fuel Opportunities (Continued) Logistics Challenges Sources of supply Gathering of supply Truck/rail/dedicated pipelines Impact of blend rates on logistics (E-10 vs. E-85 volumes) − Transportation − Storage Demand Issues Concentrated in large urban areas o
Slide 14: California's Proposed Low Carbon Fuel Standard (LCFS)
ENERGY PARTNERS, L.P. California’s Proposed Low Carbon Fuel Standard (LCFS) 40% of California Green House Gas (GHG) Emissions from Transportation Sector Reduce carbon intensity of California passenger vehicles by at least 10% by 2020 Analyze on “well to wheel” or “field to wheel” basis Performance B
Slide 15: California's Proposed Low Carbon Fuel Standard
ENERGY PARTNERS, L.P. California’s Proposed Low Carbon Fuel Standard POSSIBLE LOW CARBON STRATEGIES E-10 Increase Blend from E-6 to E-10 E-85 Sell high blend (85% ethanol/15% gasoline) for use in Flex Fuel Vehicles Increased use of Low Carbon Ethanol-Cellulosic Ethanol (switchgrass/agricultural wast
Slide 16: California's Proposed Low Carbon Fuel Standard
ENERGY PARTNERS, L.P. California’s Proposed Low Carbon Fuel Standard E-10 TRANSITION 2006 Kinder Morgan California Ethanol Volumes 274.7 million gallons / 17.9 B/D Adjusted to proposed 10% Blend Rate 482.1 million gallons / 31.4 B/D 75% increase in ethanol volumes Will require permit modifications
Slide 17: California's Proposed Low Carbon Fuel Standard
ENERGY PARTNERS, L.P. California’s Proposed Low Carbon Fuel Standard OTHER ETHANOL OPPORTUNITIES Full year blending in Arizona/Las Vegas Other markets should mandate expand Atlanta Birmingham Charlotte Greensboro Tampa/Orlando Portland, OR Seattle, WA 16
Slide 18: Renewable Fuel Opportunities – Biodiesel
ENERGY PARTNERS, L.P. Renewable Fuel Opportunities – Biodiesel Most Engine Manufacturers Honor Engine Warranties With Biodiesel Blends of 5% or Less Plantation Pipe Line December 13, 2006 Press Release Evaluating the possibility of transporting B5 to B20 from Baton Rouge, LA to Greensboro, NC Janu
Slide 19: Cochin Acquisition
ENERGY PARTNERS, L.P. Cochin Acquisition Currently owned 50.2% BP / 49.8% KM with BP as operator Cochin Pipe Line System 1900 mile natural gas liquids pipeline, 5 Fort Saskatchewan propane terminals Edmonton Regina Calgary Richardson Historically, has also moved ethane and Carrington ethylene to che
Slide 20: Plantation Pipe Line Company
ENERGY PARTNERS, L.P. Plantation Pipe Line Company 2006 Volume Impacts Volumes 6.7% below 2005 volumes (555 B/D vs. 595 B/D) ULSD Product Supply MTBE Elimination and RBOB Phase-in Bengal Pipeline Impact (Shell-CPC Joint Venture) Loss of volumes from origins of Motiva-Norco & Valero-St.Charles Connec
Slide 21: 2007 Product Pipeline Plan
ENERGY PARTNERS, L.P. 2007 Product Pipeline Plan Pipeline Volumes – Million Barrels Pipeline Revenues - $million (a) 2007 Plan 2006 Actual Percent 2007 Plan 2006 Actual Percent Change Change Pacific 449.3 433.7 3.6% 379.9 359.1 5.8% Calnev 52.2 50.5 3.4% 71.0 65.6 8.2% Plantation 207.0 202.6 2.2% 18
Slide 22: Historical FERC Tariff Index Regime
Historical FERC Tariff Index Regime Start Current PPI FG – 1 PPI FG PPI FG + 1.3% (1995 - 1999) (2000 – 2005) (2006 - 2010) Effects of Indexing on Tariff of $1/Bbl in 1994 Index Year Multiplier Index Value $1 tariff Basis $1.000 January 1, 1995 to June 30, 1995 1.002175 0.22% $1.002 PPI - FG - 1% Ju
Slide 23: FERC Update
ENERGY PARTNERS, L.P. FERC Update December 16, 2005 FERC Order Addressed issues on remand of BP West Coast Products decision (OR92-8 cost of service issues) Applied FERC Income Tax Allowance Policy Statement to SFPP cases (OR92-8/OR96-2) Reviewed OR96-2 Phase 2 cost of service rulings of Admin
Slide 24: What's Next?
ENERGY PARTNERS, L.P. What’s Next? If D.C. Circuit agrees with SFPP appeal on grandfathering, likely outcome is vacation and remand to FERC. If SFPP prevails at FERC, eliminates basis for reparations in OR96-2 If West Line reparations paid prior to such decision, SFPP could seek to recover repar
Slide 25: Kinder Morgan Energy Partners, L.P.
KINDER’ “MORGAN ENERGY PARTNERS, L.P.