Kinross Gold Corporation · TSX:K

Kinross Gold — 2014 Bank of America Merrill Lynch Canada Mining Conference

51 slides from Kinross Gold's conference presentation, Sep 4, 2014

  1. Slide 1: Kinross Gold Corporation

    September 4-5 KINROSS GOLD CORPORATION 2014 BANK OF AMERICA MERRILL LYNCH CANADA MINING CONFERENCE 1 www.kinross.com

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation and responses to questions, including but not limited to any information as to the future performance of Kinross

  3. Slide 3: Principles for Building Value

    PRINCIPLES FOR BUILDING VALUE • Focus on operational excellence • Quality over quantity • Disciplined capital allocation • Maintaining a strong balance sheet 3 www.kinross.com

  4. Slide 4: Kinross At-A-Glance

    KINROSS AT-A-GLANCE DELIVERING OPERATIONAL EXCELLENCE • World’s fifth largest gold producer with 9 operating mines • Solid record of strong operating performance STRONG FINANCIAL POSITION • $2.3B in liquidity and conservative net debt of $1.3B • No significant debt maturities until 2016 ATTRACTIVE G

  5. Slide 5: Delivering Operational Excellence

    DELIVERING OPERATIONAL EXCELLENCE 5 www.kinross.com

  6. Slide 6: Diversified Portfolio of Operating Mines

    OPERATIONAL EXCELLENCE DIVERSIFIED PORTFOLIO OF OPERATING MINES Over 50% of estimatedAMERICAS RUSSIA 2014E gold equivalent production from mines located in the Americas Dvoinoye Kupol Fort Knox Kettle River-Buckhorn Round Mountain 2014E GOLD EQUIVALENT PRODUCTION(3) Tasiast Chirano 27% WEST AFRICA 2

  7. Slide 7: Strong Operating Performance

    OPERATIONAL EXCELLENCE STRONG OPERATING PERFORMANCE Continuing track record of consistent and dependable operational performance • Produced 1.34M gold equivalent 1.34M ounces in H1 2014 1.30M • Tracking high-end of annual gold equivalent production (ounces) production guidance of 2.5-2.7M gold equiv

  8. Slide 8: Focus on Managing Costs

    OPERATIONAL EXCELLENCE FOCUS ON MANAGING COSTS H1 2014 cost metrics at the favourable end of 2014 guidance ranges • 2014 cost of sales guidance: • 2014 all-in sustaining cost guidance: $730-$780/oz $950-$1,050/oz 2014E: $950-$1,050/oz $1,034 All-in sustaining cost per gold equivalent Cost of sales p

  9. Slide 9: Americas

    • Operating region comprised of 5 mines located in the US, Brazil and Chile AMERICAS • 2014E regional guidance: 1,330 – 1,430k oz. at $780-840/oz.(3) 9 (3) Refer to endnote #3. www.kinross.com

  10. Slide 10: Maricunga, Chile

    OPERATIONAL EXCELLENCE MARICUNGA, CHILE Operational improvements resulting in higher production and lower costs INCREASING PRODUCTION 64,290 Gold equivalent ounces 52,729 45,595 38,126 Q3 2013 Q4 2013 Q1 2014 Q2 2014 DECLINING COST OF SALES PER OUNCE(4) Production cost of sales $1,368 $1,217 ($/oz.)

  11. Slide 11: Russia

    • Comprised of 2 high-grade underground mines RUSSIA • Full benefit of Dvoinoye coming on-stream in 2014 • 2014E regional guidance: 690-730k oz. at $560-590/oz.(3) 11 (3) Refer to endnote #3. www.kinross.com

  12. Slide 12: Russia Operations

    OPERATIONAL EXCELLENCE RUSSIA OPERATIONS Combined performance of Kupol & Dvoinoye outperforming expectations • Ore from the high-grade Dvoinoye mine contributing to continued strong results in Russia • Compared with Q2 2013, the combined operation increased gold equivalent production by 60% RUSSIA O

  13. Slide 13: West Africa

    WEST • Strong focus on optimizing efficiency and performance in the region AFRICA • 2014E regional guidance: 480 – 540koz. at $810 – $880/oz.(3) 13 (3) Refer to endnote #3. www.kinross.com

  14. Slide 14: West Africa Operations

    OPERATIONAL EXCELLENCE WEST AFRICA OPERATIONS Cost of sales per ounce declined 12% compared with Q2 2013 • Cost improvements at both sites • Lower regional cost of sales driven by:  Transition to self-perform mining at Chirano  Continuous improvement efforts at Tasiast WEST AFRICA OPERATING RESULT

  15. Slide 15: 2014E Production & Cost Guidance

    OPERATIONAL EXCELLENCE 2014E PRODUCTION & COST GUIDANCE(3) • 2014 all-in sustaining cost(5) expected to be $950 - $1,050 per gold equivalent ounce WEST AFRICA REGION AMERICAS RUSSIA (attributable) TOTAL Gold equivalent production 1,330 - 1,430 690 - 730 480 - 540 2.5 – 2.7M (000 oz. Au eq.) % of tot

  16. Slide 16: Strong Financial Discipline

    STRONG FINANCIAL DISCIPLINE 16 www.kinross.com

  17. Slide 17: Solid Financial Position

    STRONG BALANCE SHEET SOLID FINANCIAL POSITION Balance sheet strength continues to be a priority objective STRONG LIQUIDITY POSITION MAINTAINING FINANCIAL FLEXIBILITY • Investment grade credit ratings • Net debt: $1.3B as at June 30, 2014 $0.8 • Extended the maturity dates for the $500M $2.3B term lo

  18. Slide 18: Financial Flexibility

    STRONG BALANCE SHEET FINANCIAL FLEXIBILITY No material debt maturities prior to 2016 SCHEDULED DEBT REPAYMENTS $1,250 $ MILLIONS $500 $270 $60 $60 $250 $- 2014 2015 2016 2017 2018 2019 & (i) thereafter Term loan Senior notes Kupol loan (i) Consists of $250 million principle amount of 3.625% senior n

  19. Slide 19: Reducing Capital Spending

    DISCIPLINED CAPITAL ALLOCATION REDUCING CAPITAL SPENDING Actual Original budget 2014E guidance • Trend of declining capital $2.2B expenditures since 2012 $1.9B • Expecting another significant $1.6B reduction in 2014 $1.26B $675M (3) 2012 2013 2014E (3) Refer to endnote #3. 19 www.kinross.com

  20. Slide 20: Attractive Growth Opportunities

    ATTRACTIVE GROWTH OPPORTUNITIES 20 www.kinross.com

  21. Slide 21: Feasibility Study on Mill Expansion Complete

    GROWTH OPPORTUNITIES – TASIAST, MAURITANIA FEASIBILITY STUDY ON MILL EXPANSION COMPLETE • Feasibility study based on 38,000 tpd mill produced promising results • A mill expansion has the potential to:  Add a major source of new production to Kinross’ portfolio  Lower the company’s overall cost str

  22. Slide 22: Mill Expansion Feasibility Study Estimates

    GROWTH OPPORTUNITIES – TASIAST, MAURITANIA MILL EXPANSION FEASIBILITY STUDY ESTIMATES Improved estimated economics are primarily the result of estimated lower capital expenditures, an optimized mine plan and lower expected operating costs AVERAGE FOR THE FIRST 5 YEARS LIFE OF MINE (2018-2022) (2014-

  23. Slide 23: Reduced Capital Expenditure Estimates

    GROWTH OPPORTUNITIES – TASIAST, MAURITANIA REDUCED CAPITAL EXPENDITURE ESTIMATES Initial capital expenditure estimate for Tasiast mill expansion of $1.6 billion significantly lower than original $2.7 billion estimated in the pre-feasibility study 2013 infrastructure spending Deferral of $2.7B $330M

  24. Slide 24: Tasiast Mill Expansion - Update

    GROWTH OPPORTUNITIES – TASIAST, MAURITANIA TASIAST MILL EXPANSION - UPDATE Do not expect to make a final decision whether to proceed with a potential mill expansion until 2015 EXPLORING PROJECT FINANCING OPTIONS • Considering funding in the range of $700-$750M of the expected $1.6B initial capital e

  25. Slide 25: Tasiast District Exploration

    GROWTH OPPORTUNITIES – TASIAST, MAURITANIA TASIAST DISTRICT EXPLORATION* Exploration work continues along Tasiast’s prospective 80 km trend Imkebdene license Piment C616 Central Fennec C613 Tmeimichat license C614 C69 C67 Aoueouat C615 C68 C611 C612 El Gaicha license Tamaya Tasiast Sud license N’Dao

  26. Slide 26: La Coipa Phase 7

    GROWTH OPPORTUNITIES - CHILE LA COIPA PHASE 7 Proceeding to a pre-feasibility study at La Coipa Phase 7 in Chile • Proceeding to a pre-feasibility study based on encouraging results from a scoping study • The pre-feasibility study will focus on:  The Pompeya deposit, where drilling has outlined hig

  27. Slide 27: Kupol – Moroshka, Russia

    HIGH-QUALITY EXPLORATION TARGETS KUPOL – MOROSHKA, RUSSIA • Moroshka located 4 km east of Kupol mine • Drilling confirmed continuity of high grades along 400 strike metre vein structure Kupol CURRENT PRELIMINARY ESTIMATE mine site • Moroshka contains a minimum total potential mineral resource of 0.4

  28. Slide 28: Dvoinoye, Russia

    HIGH-QUALITY EXPLORATION TARGETS DVOINOYE, RUSSIA September Northeast target located approximately 15 km northwest of Dvoinoye For additional information, please see Kinross’ news release dated February 12, 2014 and Appendices A and B, which are available on our website at www.kinross.com , as well

  29. Slide 29: Dvoinoye - September Northeast Long Section

    HIGH-QUALITY EXPLORATION TARGETS DVOINOYE - SEPTEMBER NORTHEAST LONG SECTION Trench T-06 (projected) 3.9 m @ 139 g/t Au SP13-030 SP13-010 2.7 m @ 184.55 g/t Au 1.7 m @ 21.14 g/t Au Including 1 m @ 497.42 g/t SP13-013 2.3 m @ 9.16 g/t Au SP12-023 6.5 m @ 16.28 g/t Au SP13-047 Including 2.5 m @ 36.86

  30. Slide 30: Chirano, Ghana

    HIGH-QUALITY EXPLORATION TARGETS CHIRANO, GHANA • Drilling program designed to test underground potential of mineralization beneath Suraw, Akoti and Tano open pits • Results confirmed mineralization extends 100 to 400 metres below bottom of each pit • Remains open at depth at all three deposits 2013

  31. Slide 31: Compelling Valuation

    COMPELLING VALUATION 31 www.kinross.com

  32. Slide 32: Production and All-In Sustaining Cost

    COMPELLING VALUATION PRODUCTION AND ALL-IN SUSTAINING COST COMPANY GUIDANCE COMPANY GUIDANCE 2014E GOLD PRODUCTION(i) (mm oz.) 2014E ALL-IN SUSTAINING COSTS(ii) ($/oz.) 7.0 $1,200 6.0 $1,000 Average 5.0 $800 4.0 $600 3.0 $400 2.0 1.0 $200 0.0 $0 Barrick Newmont Goldcorp Kinross Yamana Agnico Eldorad

  33. Slide 33: Net Debt to 2014E EBITDA

    COMPELLING VALUATION NET DEBT TO 2014E EBITDA 2.6 2.5 2.2 1.3 1.2 1.2 0.1 Barrick Newmont Yamana Agnico Goldcorp Kinross Eldorado Source: Bloomberg – September 2, 2014 33 www.kinross.com

  34. Slide 34: Enterprise Value versus Production

    COMPELLING VALUATION ENTERPRISE VALUE VERSUS PRODUCTION Gold Production Multiple $34.1 (Moz.)1 Delta with of Kinross Kinross H1 (US$B) Enterprise 2014E 2014A Value Enterprise Value (US$ billion) Barrick 6.3 3.1 28.3 5.9x $24.0 $21.1 Newmont 4.9 2.6 15.3 3.6x Goldcorp 3.0 1.3 18.2 4.1x Kinross 2.6 1.

  35. Slide 35: 2014E Metrics

    COMPELLING VALUATION 2014E METRICS Attractive value opportunity relative to peers, considering Kinross’ annual production, cost structure, track record and growth opportunities EV / 2014E EBITDA P / 2014E OPERATING CF 13.7 15.6 12.7 14.7 11.5 11.4 10.6 11.2 8.2 9.7 8.2 7.8 5.1 4.5 Goldcorp Eldorado

  36. Slide 36: 2015E Metrics

    COMPELLING VALUATION 2015E METRICS Attractive value opportunity relative to peers, considering Kinross’ annual production, cost structure, track record and growth opportunities EV / 2015E EBITDA P / 2015E OPERATING CF 12.2 14.7 9.9 9.4 10.3 10.2 7.8 7.6 7.3 7.3 5.1 6.4 6.3 4.2 Eldorado Goldcorp Agni

  37. Slide 37: Appendix

    APPENDIX 37 www.kinross.com

  38. Slide 38: Fully-Loaded Costing Methodology

    QUALITY OVER QUANTITY FULLY-LOADED COSTING METHODOLOGY • Builds upon NI 43-101 standards to include additional costs for estimating mineral reserves • Objectives:  Maximize near-term cash flow & NPV  Every ounce is cash flow positive on a “fully-loaded” basis KINROSS WAY FORWARD: MINERAL RESERVE E

  39. Slide 39: 2013 Mineral Reserves and Resources

    QUALITY OVER QUANTITY 2013 MINERAL RESERVES AND RESOURCES(10) FULLY-LOADED COSTING METHODOLOGY FOR PROVEN & PROBABLE GOLD RESERVES MINERAL RESERVE ESTIMATES 59.6 42.8 MM OZ. • Contributed to a reduction in gold reserves estimates, which is offset by estimated:  Higher grades 2012 2013  Reduced cap

  40. Slide 40: Fort Knox, USA (100%)

    AMERICAS FORT KNOX, USA (100%) Among the world’s few cold climate heap leach facilities • Achieved record annual production in 2013, Fort Knox’s 16th year in operation • Impressive track record of operational excellence OPERATING RESULTS(4) FY 2012 FY 2013 Production (Au. Eq. oz.) 359,948 421,641 Pr

  41. Slide 41: Round Mountain, USA (50%)

    AMERICAS ROUND MOUNTAIN, USA (50%) Round Mountain is a best-practice leader in many areas, including preventative maintenance • Kinross-operated JV with Barrick • Bulk tonnage open-pit operation OPERATING RESULTS(4) FY 2012 FY 2013 Production (Au. Eq. oz.) 192,330 162,826 Production cost of sales ($

  42. Slide 42: Kettle River-Buckhorn, USA (100%)

    AMERICAS KETTLE RIVER-BUCKHORN, USA (100%) Low-cost, high-grade underground mine located in Washington state • Small footprint operation • Significant cash flow contributor with costs among the lowest in the portfolio OPERATING RESULTS(4) FY 2012 FY 2013 Production (Au. Eq. oz.) 156,093 150,157 Prod

  43. Slide 43: Paracatu, Brazil (100%)

    AMERICAS PARACATU, BRAZIL (100%) Large gold mine with a long mine life that extends to 2030 • Paracatu is among the world’s largest gold operations with annual throughput of ~60Mtpa • Achieved record annual production in 2013 OPERATING RESULTS(4) FY 2012 FY 2013 Production (Au. Eq. oz.) 466,709 500,

  44. Slide 44: Maricunga, Chile (100%)

    AMERICAS MARICUNGA, CHILE (100%) High-altitude heap leach operation located in the highly prospective Maricunga District • New team focused on improving operating efficiencies and reducing costs • Continued performance improvements since Q3/13 OPERATING RESULTS(4) FY 2012 FY 2013 Production (Au. Eq.

  45. Slide 45: Kupol-Dvoinoye (100%)

    RUSSIA KUPOL-DVOINOYE (100%) Our Russian operations are a model for successfully operating in a remote location • High-grade, low-cost underground mines • Dvoinoye is the 4th mine Kinross has operated in its 20-year history in the region OPERATING RESULTS(4) FY 2012 FY 2013 Production (Au. Eq. oz.)

  46. Slide 46: Tasiast, Mauritania (100%)

    WEST AFRICA TASIAST, MAURITANIA (100%) Operating mine with a large gold resource and potential for a mill expansion • Expect to begin realizing benefits of infrastructure improvements • Achieved record quarterly production in Q1/14 OPERATING RESULTS(4) FY 2012 FY 2013 Production (Au. Eq. oz.) 185,33

  47. Slide 47: Chirano, Ghana (90%)

    WEST AFRICA CHIRANO, GHANA (90%) Cost reductions achieved at Chirano through transition to self-perform mining • Chirano is now among our lowest cost operations following transition to self-perform mining in open pits and underground OPERATING RESULTS(1,4) FY 2012 FY 2013 Production (Au. Eq. oz.) 26

  48. Slide 48: Endnotes

    ENDNOTES 1) Unless otherwise noted, gold equivalent production, gold equivalent ounces sold and production cost of sales figures in this presentation are based on Kinross’ 90% share of Chirano production. 2) For more information regarding the results of the Tasiast feasibility study, please refer to

  49. Slide 49: Explanatory Notes: Exploration

    EXPLANATORY NOTES: EXPLORATION Tasiast Exploration Results Hole identifiers ending with suffix DD are diamond drill core holes (HQ diameter) and those ending with suffix RC are reverse circulation (RC) holes. Holes with “A” prefixing DD or RC are diamond core or reverse circulation re-drills of the

  50. Slide 50: Explanatory Notes: Exploration

    EXPLANATORY NOTES: EXPLORATION Kupol and Dvoinoye Exploration Results All drill holes at Moroshka are diamond drill core holes (HQ or NQ core diameter). The Moroshka vein dips sub-vertically to the east. Drill holes are angled between minus 50° and 75° to the east and west. Results provided for Moro

  51. Slide 51: Kinross Gold Corporation

    KINROSS GOLD CORPORATION 25 York Street, 17th Floor │Toronto, ON │ M5J 2V5 www.kinross.com 51 www.kinross.com

Kinross Gold — 2014 Bank of America Merrill Lynch Canada Mining Conference on 6ix