Lunnon Metals Limited · ASX:LM8

Lunnon Metals — Investor Presentation (September 2025)

22 slides from Lunnon Metals's investor presentation, Sep 23, 2025

  1. Slide 1: Investor Presentation - ASX Announcement

    INVESTOR PRESENTATION ASX ANNOUNCEMENT ASX ANNOUNCEMENT 23 September 2025 For personal use only In accordance with Lunnon Metals Limited’s (ASX: LM8) Shareholder Communications Policy, enclosed is a copy of the Investor Presentation which will be used by Managing Director, Edmund Ainscough, during u

  2. Slide 2: St Ives ~ A Springboard for Growth

    LUNNON METALS For personal use only ST IVES ~ A SPRINGBOARD FOR GROWTH 23 JULY 2025 ASX: LM8 1

  3. Slide 3: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER This Presentation has been prepared by employees of Lunnon Metals Ltd (“Lunnon”, “LM8” or “the Company”) on its behalf and is a summary only, and contains summary information about Lunnon and its activities, which is current as at the date of this Presentation (unless o

  4. Slide 4: Foster-Baker: at the heart of the great St Ives Gold camp

    Foster-Baker: at the heart of the great St Ives Gold camp KAMBALDA BETA-HUNT (WGX) • St Ives – over 16Moz* produced For personal use only INTREPIDE since early 1980s • Corridor approx. 32km x 7km GREATER REVENGE N • Bounded by Boulder-Lefroy and INVINCIBLE Speedway Faults VICTORY DEFIANCE • Averaged

  5. Slide 5: Lunnon Metals Overview

    LUNNON METALS OVERVIEW Corporate structure (ASX: LM8) SEPTEMBER 2025 only Liam Twigger Edmund Ainscough Non-Executive Chair Managing Director 220.6m ~$0.35 ~$77m Board Shares on issue Share price Market cap For personal use Ashley McDonald Deborah Lord Non-Executive Director Non-Executive Director 1

  6. Slide 6: The Pride of St Ives – Gold Fields' Invincible

    The Pride of St Ives – Gold Fields’ Invincible KAMBALDA For personal use only Invincible is located on Gold Fields Ltd’s tenure at St Ives 5 * Images sourced from Gold Fields Ltd’s website www.goldfields.com and are of the Invincible operations on Gold Fields leases, prior to and after mining commen

  7. Slide 7: Foster-Baker Gold Discovery Program

    Foster-Baker Gold Discovery Program • Field of view hosts > 7Moz^ of past gold production on Gold Fields’ tenure For personal use only • LM8 Gold program commenced Q1 2024, drilled to date: • 29 km RC (517 holes) • 5 km DD (25 holes) • Discovered Lady Herial (29koz* MRE) and completed Scoping Study

  8. Slide 8: Lady Herial Scoping Study

    Lady Herial Scoping Study Parameter Unit Result Physicals For personal use only Kilotonnes 300-320 Grade g/t Au ~1.8 Mine Design Ounces Au mined ~18,000 Ounces recovered ~15,400 Strip ratio Waste: ore tonnes 6.2 : 1 Measured Resource 89% Scoping Study* % underpinning the Indicated Resource 10% compl

  9. Slide 9: Timeline – rapid progress, short fuse

    Timeline – rapid progress, short fuse DISCOVERY TO POSITIVE SCOPING STUDY <14 MONTHS 22 April 2024 – For personal use only first results* 2024 2025 H1 Now 420 holes …..17.9km ^^ ~4km of grade control, >125 holes First time Mineral Resource# & Scoping Study Results^: • 0.60m @ 10.84g/t Au (FOS24DD_01

  10. Slide 10: Ore Purchase Agreement with SIGMC

    Ore Purchase Agreement with SIGMC1 SCOPING STUDY: 0.30-0.32 million tonnes @ ~1.8 g/t Au for ~18,000 ounces2 For personal use only KEY TERMS AGREED IMPACT CONDITONS PRECEDENT Sell mined material >0.5g/t Au to SIGMC Costs align with those used in Scoping Approval of LM8 shareholders at EGM Study# IER

  11. Slide 11: Robust free cash flow generation (pre-tax) = low sensitivity

    Robust free cash flow generation (pre-tax) = low sensitivity Scoping Study# Financial Outcomes Operating Free Cash Flow A$M NEXT STEPS For personal use only Complete technical studies – confirm 4,500 4,750 5,000 5,250 5,500 financial benefits and physicals 70% 26.1 28.7 31.3 33.9 36.5 Finalise minin

  12. Slide 12: Shallow, thick, high-grade

    Shallow, thick, high-grade UPPER • 7m @ 34.38g/t Au (LDH25RC_325 from 5m) including 4m @ 59.28g/t Au (>1.0g/t Au) For personal use only • 26m @ 6.37g/t Au (LDH25RC_160 from 9m) including 8m @ 9.90g/t Au & 10m @ 8.22g/t Au (>1.0g/t Au) • 14m @ 18.07g/t Au (LDH25RC_164 from 20m) including 2m @ 121.47g

  13. Slide 13: Shallow, thick, high-grade - Upper

    Shallow, thick, high-grade - Upper For personal use only * see LM8 ASX announcement dated 15 September 2025 for full results and relevant Annexures * Source: Historical WMC production records to December 2001, sum of Gold Fields Ltd’s, Karora Resources and Westgold Resources report filings thereafte

  14. Slide 14: Shallow, thick, high-grade - Upper

    Shallow, thick, high-grade - Upper For personal use only * see LM8 ASX announcement dated 15 September 2025 for full results and relevant Annexures * Source: Historical WMC production records to December 2001, sum of Gold Fields Ltd’s, Karora Resources and Westgold Resources report filings thereafte

  15. Slide 15: Shallow, thick, high-grade - Lower

    Shallow, thick, high-grade - Lower For personal use only * see LM8 ASX announcement dated 23 September 2025 for full results and relevant Annexures * Source: Historical WMC production records to December 2001, sum of Gold Fields Ltd’s, Karora Resources and Westgold Resources report filings thereafte

  16. Slide 16: Shallow, thick, high-grade - Lower

    Shallow, thick, high-grade - Lower For personal use only * see LM8 ASX announcement dated 23 September 2025 for full results and relevant Annexures * Source: Historical WMC production records to December 2001, sum of Gold Fields Ltd’s, Karora Resources and Westgold Resources report filings thereafte

  17. Slide 17: Nickel Assets Scoping Study

    Nickel Assets Scoping Study * See LM8 ASX announcement 21 July 2025 for the Scoping Study Report. The Company confirms that all material assumptions underpinning forecast production targets and forecast financial information derived from that production, continue to apply and have not materially cha

  18. Slide 18: St Ives for Gold : Kambalda for Nickel

    For personal use only ST IVES FOR GOLD : KAMBALDA FOR NICKEL 17

  19. Slide 19: Appendices

     This slide is 100% editable. For personal use only Adapt it to your needs and capture your audience’s attention.  This slide is 100% editable. Appendices Adapt it to your needs and capture your audience’s attention. 18

  20. Slide 20: Competent Persons Statements

    COMPETENT PERSONS STATEMENTS Mr. Aaron Wehrle is the Company’s principal Competent Person and takes overall responsibility for any information in this report that relates to gold and nickel geology, or informed gold and nickel Mineral Resources, Exploration Targets, Exploration Results and the Compa

  21. Slide 21: Gold Mineral Resources Reporting

    GOLD MINERAL RESOURCES REPORTING This presentation contains references to Lunnon Metals’ Mineral Resources, which are shown in a detailed breakdown in the following slides. Gold Mineral Resources^ at 30 June 2025 (>0.5g/t Au) For personal use only * total s may not add up exactl y due to roundi ng T

  22. Slide 22: Nickel Mineral Resources Reporting

    NICKEL MINERAL RESOURCES REPORTING This presentation contains references to Lunnon Metals’ nickel Mineral Resources, which are shown in a detailed breakdown below. Mineral Resources ^ * at 30 June 2025 (>1.0% Ni) For personal use only The Company confirms that all material assumptions and technical

Lunnon Metals — Investor Presentation (September 2025) on 6ix