Slide 1: L12-7 Area - Presentation: North Perth Basin Hydrocarbons
L12-7 Area - PRESENTATION July 2013 North Perth Basin Hydrocarbons
Slide 2: Disclaimer
DISCLAIMER Reliance should not be placed on the information or opinions contained in this presentation which does not take into account the particular needs or financial situation of any particular investor. Green Rock Energy Limited has taken reasonable care in producing the text and images contain
Slide 3: L12-7 Highlights
L12-7 HIGHLIGHTS Green Rock was recently awarded a 100% interest in L12-7 in the North Perth Basin of Western Australia, containing the Ocean Hill-1 gas discovery drilled in 1991. Award of L12 -7 is subject to Native title and environmental process with negotiations underway, and upon successful
Slide 4: Prospectivity
PROSPECTIVITY The L12-7 Area area includes the large faulted four-way dip closure that was previously tested by Sagasco and Arrow Petroleum when drilled in 1991 to a total depth of 3,840m. Recent results over similar interval in Empire Oil & Gas, Gingin/Red Gully area suggest low flow rates may
Slide 5: Significant Potential
SIGNIFICANT POTENTIAL The L12-7 Area has historical 2D seismic coverage predominantly focused on the Ocean Hill-1 location with sparser coverage elsewhere. New mapping completed by Green Rock confirms the Ocean Hill structure is a substantial 4-way dip closure (~50km2), and also identifies sever
Slide 6: Ocean Hill-1 Evaluation
OCEAN HILL‐1 EVALUATION Log analysis conducted over 9 zones. Recommendations included comprehensive testing, especially over zones from 3180m –3500m. DST-1 flowed 0.7Mmscf/d gas No significant additional flow achieved during subsequent cased hole testing of this interval. Recommended consi
Slide 7: Gas Shows
GAS SHOWS Gas and oil shows over 800+m interval – over 100m calculated net pay. 6 greenrockenergy.com.au
Slide 8: Forward Work Program
FORWARD WORK PROGRAM Native title and environmental negotiations are already underway, with conclusion expected by Q4 CY13. Evaluation of available data is in progress to work towards booking a contingent resource. An Independent Reserves Report to be commissioned Q3 CY13. Extensive 3D seism