  1. Slide 1: Berrima Colliery - Closure Working Group Meeting #5

    Berrima Colliery - Closure Working Group Meeting #5 >Welcome New Berrima Hall 18 November 2019

  2. Slide 2: Agenda

    Agenda 1. Welcome and Apologies 2. Terms of Reference - Conduct of CWG Members 3. Review of minutes & actions 4. Water Quality/Ecology Update - Greg Johnson 5. EPA Toxicity Assessment - EPA 6. Bulkhead Seals Update - Greg Johnson 7. EPL/CCL Updates - Greg Johnson 8. Mandemar Lane Update - Greg Johns

  3. Slide 3: Welcome - CWG Representatives, Apologies & Guests

    1. Welcome - CWG Representatives, Apologies & Guests ● Boral - Fabio Colusso, Greg Johnson, David Spears (apology), Tom Horn (BCW) ● Resource Regulator - Greg Kininmonth, Peter McMillan ● Environment Protection Authority - William Dove, Andrew Couldridge ● WaterNSW - Ravi Sundaram ● Wingecarribee Sh

  4. Slide 4: Terms of Reference - Code of Conduct of CWG Members

    2. Terms of Reference - Code of Conduct of CWG Members Titlefefefefeffff4g45g4545

  5. Slide 5: Review of Minutes – suggested amendments

    3. Review of Minutes – suggested amendments Titlefefefefeffff4g45g4545

  6. Slide 6: Surface Water Monitoring Update

    4. Surface Water Monitoring Update Titlefefefefeffff4g45g4545

  7. Slide 7: Surface Water Monitoring Update - October 2019

    Surface Water Monitoring Update - October 2019 ● Monthly sampling of water quality continuing ● Spring 2019 Macroinvertebrate sampling undertaken in September ● EPA participation in September sampling which included their own toxicology assessment Titlefefefefeffff4g45g4545 We continue to use the dron

  8. Slide 8: Surface Water Monitoring Update - Summary of Findings

    Surface Water Monitoring Update Summary of Findings ● Since the installation of the bulkheads, the discharge continues to be significantly down from 2.5ML to 0.125ML per day ● Concentrations of metals and other parameters downstream have progressively reduced and are consistent with upstream water q

  9. Slide 9: Wingecarribee River Monitoring

    Wingecarribee River Monitoring ● pH - upstream and downstream neutral. pH drop July to September ● Conductivity - minor influence on EC, stream flow also low ● Nitrates - While stream flow is low, influence of Bowral STP more pronounced. Titlefefefefeffff4g45g4545

  10. Slide 10: Surface Water Monitoring Update

    urface Water Monitoring Update ● Iron - Drops rapidly, generally follows upstream sites. Rivulet shows occurrence of naturally high fluctuations ● Mg - Decreases rapidly through mixing zone. During 2019 there has been a decline close to discharge and increase downstream Titlefefefefeffff4g45g4545

  11. Slide 11: Surface Water Monitoring Update

    urface Water Monitoring Update ● Nickel - Average Ni Conc. since Jan 2018 is 0.009mg/L which is below AZECC default value of 0.011mg/L. Conc. at rivulet 0.002mg/L ● Zinc - Since April 2019 conc. Have increase above and below discharge. Similar changes at rivulet. Changes not from discharge. Zn conc.

  12. Slide 12: Macroinvertebrate study update - May 2019 Sampling Summary

    Macroinvertebrate study update - May 2019 Sampling Summary ● General observations was that there appeared to be less iron floc/precipitate downstream of the adit. We believe this decrease has led to an increase in abundance , family richness and EPT. While we have not done a statistical analysis yet

  13. Slide 13: Macroinvertebrate study update - Site 3 Detail

    Macroinvertebrate study update - May 2019 Sampling Summary Site 3 Detail ● Increase in abundance ● Macroinvertebrate taxonomic richness (type of bugs) increased ● Increase in sensitive invertebrates i.e. EPT index. EPT was higher than upstream site in May 2019 Note: Dr Ian Wright reported EPT downst

  14. Slide 14: Macroinvertebrate study update - September 2019 preliminary findings

    Macroinvertebrate study update - September 2019 preliminary findings ● Appears to be an improvement in stream health during 2019 ● Indicated by increases in EPT, abundance and taxonomic richness similar to upstream and tributory reference ● Improved stream health with all sites, particularly sites 3

  15. Slide 15: NSW EPA - Ecotoxicity Report

    5. NSW EPA - Ecotoxicity Report ● September 2019 - EPA and members of the Environment, Energy and Science Group in the DPIE participated in the monthly sampling round taking independent samples ● Purpose was to take samples upstream and downstream of the adit and compare with previous testing by the

  16. Slide 16: Bulkhead Sealing Plan Update - Location in respect of workings

    6. Bulkhead Sealing Plan Update - Location in respect of workings Titlefefefefeffff4g45g4545

  17. Slide 17: Bulkhead Seal installation update

    Bulkhead Seal installation update Titlefefefefeffff4g45g4545

  18. Slide 18: Bulkhead Seal installation update

    Bulkhead Seal installation update Titlefefefefeffff4g45g4545

  19. Slide 19: Bulkhead Seal installation update

    Bulkhead Seal installation update ● Internal mine water treatment pumps stopped on 24 April 2019 ● Bulkheads installed by end May 2019 ● Personnel inspecting and recording observations twice a week ● Average rise of 20mm/day or 140mm/week inbye of bulkheads - linear fashion ● Observations to date -

  20. Slide 20: Environmental Protection Licence/ CCL Updates

    7. Environmental Protection Licence/ CCL 748 Updates EPL 608 No modifications. PIRMP drill undertaken in October. PIRMP updated. Annual return due for submission 30 December 2019 CCL 748 MOP - Berrima colliery Mining Operations Plan dated September 2019 - Notice of Approval received October 2019 Tit

  21. Slide 21: Mandemar Lane Update

    8. Mandemar Lane Update ● Last meeting the Mandemar Lane resident representative Tony McCormick presented to the CWG. ● Tony raised concerns regarding ○ Subsidence and vibration impacts on structures, services and surfaces ○ Bores drying and/or collapsing ○ Conductivity increases and soil salinity ○

  22. Slide 22: Mandemar Lane Locality Map

    Mandemar Lane Locality Map Titlefefefefeffff4g45g4545

  23. Slide 23: B62 Cross Section and water tables

    B62 Cross Section and water tables ● There are 3 water tables ● Upper Hawkesbury Sandstone ● Lower Hawkesbury Sandstone ● Illawarra coal measures ● At B62 the coal seam Titlefefefefeffff4g45g4545 is below the river

  24. Slide 24: B62 & B63 Water levels within each water table

    B62 & B63 Water levels within each water table Titlefefefefeffff4g45g4545

  25. Slide 25: Geology and groundwater

    Geology and groundwater ● Robertson Basalt - Localised perched aquifers ● Dolerite dykes - There are a number of igneous dykes which run through the mining area ● Hawkesbury Sandstone - Divided into two layers by a siltstone/claystone interlayer ○ Upper Hawkesbury Sandstone (Aquifer) - static water

  26. Slide 26: Bord and Pillar Mining - Technique and Subsidence

    Bord and Pillar Mining - Technique and Subsidence ● Berrima Colliery is a Bord and Pillar mine, not a longwall mine ● Subsidence impacts from Bord and Pillar mining is less extensive than longwall mining ● Bord and pillar involves parallel tunnels being driven into the coal seam from the mine entran

  27. Slide 27: Land Access Agreements

    Land Access Agreements ● Prior to undertaking sampling and investigations we require access agreements with landowners ● Our priority is to access property where we have previously monitored as per the Subsidence Management Plan and associated Environmental Management Plan ● By gathering this data w

  28. Slide 28: Communications Update - Tom Horn (BCW)

    9. Communications Update - Tom Horn (BCW) Titlefefefefeffff4g45g4545

  29. Slide 29: Communications Update - Dedicated Community Website

    . Communications Update - Tom Horn (BCW) •Activity undertaken: Dedicated Community Website: •Microsite was launched in September •Single home for all information on the Berrima Colliery closure •Designed specifically for the community and easy to navigate. •Provides all reports, minutes etc. from fo

  30. Slide 30: Dedicated Community Website

    •Activity undertaken: Dedicated Community Website: •Over 300 unique visitors •Average of 3 minutes on the website •Promoted through media, newsletters and engagement day •10 people have signed up for updates Further additions planned: -CWG member contact option -Updated Q&A -Ongoing updates to repor

  31. Slide 31: Informational Video and Infographics

    •Activity undertaken: Informational Video: •Four minute video dedicated to the Berrima Colliery closure •Provides background of site operation and overview of activity being undertaken •Has received 31 views to date Infographics: •Two infographics developed and set live •One focused on bulkheads •On

  32. Slide 32: Communications continued - Community Engagement Days

    Communications continued Activity undertaken: Community Engagement Days •Four days held on 31 Oct, 1Nov, 8 Nov, 9 Nov •25 attendees •Approximately an hour per attendee •Provided maps, images and plans of Colliery site •Provided graphic representations and video •Created in-depth conversations and an

  33. Slide 33: General business

    10. General business Titlefefefefeffff4g45g4545

  34. Slide 34: Next meeting date

    10. Next meeting date Proposing - Monday 9 March 2020 Location – Berrima Anglican Church Hall Titlefefefefeffff4g45g4545