Dreadnought Resources Limited · ASX:DRE

Dreadnought Resources — Investor Presentation (January 2019)

37 slides from Dreadnought Resources's investor presentation, Jan 16, 2019

  1. Slide 1: Ni-Cu-Au Opportunity

    Ni-Cu-Au Opportunity January 2019

  2. Slide 2: Disclaimer

    Disclaimer Forward Looking Statements ‘This release may include forward looking statements. These forward looking statements are based on management’s expectations and beliefs concerning future events as of the time of the release of this document. Forward looking statements are necessarily subject

  3. Slide 3: Transaction to Acquire IronRinger Group

    Transaction to Acquire IronRinger Group • Agreement to acquire 100% of the IronRinger Group: – 350m ordinary shares – 50m, 5 year options @ $0.01 – $70,000 cash • Conditions include: TYK shareholder approval; Department of Defence approval of change of control of IronRinger; transfer of E04/2315 • P

  4. Slide 4: Regional Corporate Activity with Strong Value Proposition

    Regional Corporate Activity with Strong Value Proposition TYK BUX @ BUX @ Post BUX @ IGO Broker Rights Current Placement Target Capital Structure Issue Price Price Price Fully paid ordinary shares 1,119.6 136.1 136.1 136.1 Share price $ 0.003 $ 0.130 $ 0.200 $ 0.400 Market capitalisation $ 3.359 $ 1

  5. Slide 5: Funding and News Flow

    Funding and News Flow • EIS funding of $120,000 Current Rights Issue MD IronRinger Pro Sign On Acquisition Forma • Appointment of well Capital Structure (m) (m) (m) (m) (m) regarded MD (subject to Fully paid ordinary shares Options @$0.045, 5 year term 577.2 - 192.4 - - 30.0 350.0 1,119.6 - 30.0 fun

  6. Slide 6: Experienced and Capable Team

    Experienced and Capable Team • Managing Director: – Impressive and high quality candidate identified and will join subject to completion of transaction and completion of Rights Issue – Exploration geologist with experience in exploring for gold, base metals, pegmatites, iron and manganese in Austral

  7. Slide 7: Change of Name and Brand

    Change of Name and Brand • Military theme as Yampi is located on a Defence reserve • Dreadnought literally means "a fearless person" • Original, HMS Dreadnought was massive British man-of-war involved in the 1805 Battle of Trafalger • In 1906, the battleship HMS Dreadnought was so innovative that it

  8. Slide 8: Excellent Commodity Mix

    Excellent Commodity Mix Source: The Visual Capitalist 8

  9. Slide 9: Investment Rationale

    Investment Rationale • Tarraji/Yampi: – Large scale Ni-Cu-Au opportunity – Known mineralisation – Emerging region with drill ready targets • Rocky Dam Pyrite/Sulphur & Gold: – Pyrite/sulphur exploration target – Surrounded by Riversgold; Northern Star; Sumitomo; Aruma and Silver Lake with gold targe

  10. Slide 10: Large Granted Tenement Position with Numerous Drill Ready Targets

    Large Granted Tenement Position with Numerous Drill Ready Targets 10

  11. Slide 11: Tarraji / Yampi Large Scale Ni-Cu-Au Opportunity

    Tarraji / Yampi Large Scale Ni-Cu-Au Opportunity Western Mining’s David Barr (L) & Roy Woodall (R) at Tarraji – late 1950’s when most substantial exploration occurred 11

  12. Slide 12: Overview

    Overview • 877km2 exploration licences, located 95kms northeast of Derby, WA (via Derby-Gibb River & Kimbolton Roads) • Background: – First mover advantage at Tarraji, locked out as a Defence reserve for decades – Numerous ~WW1 Cu-Au workings – Drill and rockchip results • External endorsement of pr

  13. Slide 13: History - Significant Mineralised System, Minimal Exploration

    History - Significant Mineralised System, Minimal Exploration • ~WW1: Tarraji, Grant’s Find & Monarch hand mined for copper; gold produced via prospecting & dry blowing; smale scale mining of beryl, tin, wolfram & mica • 1957-1959: regional copper exploration by WMC • Post-1959: work limited due to

  14. Slide 14: Structural Complexity, Scale Potential, Known Mineralisation

    Structural Complexity, Scale Potential, Known Mineralisation IRR Ground Ruins Dolerite BUX Double Magic Major long-lived structure Regional basin margin Complex splay faults Base metals concentrations 14

  15. Slide 15: Targets in Ruins Dolerite and Along Magnetic Trends

    Targets in Ruins Dolerite and Along Magnetic Trends IRR Ground Ruins Dolerite Magnetic trends 15

  16. Slide 16: Strong Results and Newsflow from Buxton Regional Success

    Strong Results and Newsflow from Buxton Regional Success 16

  17. Slide 17: Rio Tinto VTEM Survey Brings Modern Exploration to the Area

    Rio Tinto VTEM Survey Brings Modern Exploration to the Area • Three blocks flown: – ~206kms2 survey over Yampi and Tarraji projects – Line-kms of data ~901kms – Line spacing ~250m – Average flying height ~83m • Acquisition terms ($110,000): – Signing: cash $10,000 [paid] – ASX listing: $30,000 in sh

  18. Slide 18: Numerous High Quality Targets Developed from Ranking Criteria

    Numerous High Quality Targets Developed from Ranking Criteria Magnetic anomalies EM conductors Ruins Dolerite • Priority ranking criteria: - Intensity of EM conductor - Strength of magnetic anomaly - Strike length (discrete bodies are higher priority) - Correlation with Ruins Dolerite 18

  19. Slide 19: Numerous High Quality Targets Assessed and Ranked

    Numerous High Quality Targets Assessed and Ranked Tarraji/Yampi Prioritised Targets Conductor Magnetic Target Priority Description Anomaly Geology C01 High Discrete & strong conductor Strong Within Ruins Dolerite C02 High Multiple moderate conductors, trending E-W Strong Under cover, possibly within

  20. Slide 20: Numerous High Quality Targets VTEM

    Numerous High Quality Targets VTEM BO6 VTEM image over geology map targeting Ruins Dolerites 20 Refer to ASX announcement 11 Jan. 2019 Priority: Red = High Green = Med Blue = Low

  21. Slide 21: Cu and Ni Sampling Support Priority Targets

    Cu and Ni Sampling Support Priority Targets 21 Refer to ASX announcement date 11 Jan. 2019

  22. Slide 22: Significant Cu-Au Gossans at East Tarraji

    Significant Cu-Au Gossans at East Tarraji Avg. drill depth ~140m Refer to ASX Avg. drill depth ~140m (with ~40% core loss) announcement 22 11 Jan. 2019

  23. Slide 23: Cu-Au Rock Chip Sampling

    Cu-Au Rock Chip Sampling Rock Cu Au Rock Cu Au Chip Area Year % g/t Chip Area Year % g/t Whitewater Resources Pty. Ltd. Maldon Minerals NL TG-1 GF 2013 6.91% 0.10 56 TJ 1971 14.25% 0.73 TG-2 GF 2013 9.66% 1.75 57 TJ 1971 14.75% 0.63 TG-3 GF 2013 9.08% 0.76 TG-4 GF 2013 2.87% 0.04 58 TJ 1971 25.25% 1

  24. Slide 24: Encouraging Cu-Au Drilling by WMC

    Encouraging Cu-Au Drilling by WMC Western Mining Corporation Ltd. Interval Cu ID Area Year (m) % Comments DDH - GS1 Grant’s Find 1959 5.33 1.14% Inc. 0.82m @ 2.95%Cu DDH - GS1 Grant’s Find 1959 0.43 5.34% HW vein DDH - GS2 Grant’s Find 1959 8.53 1.23% Inc. 2.90m @ 3.25%Cu DDH - GS3 Grant’s Find 1959

  25. Slide 25: Endorsed by Successful EIS Grant

    Endorsed by Successful EIS Grant • Awarded successful 2018 WA Government Exploration Incentive Scheme (“EIS”) grant of $120,000 via independent, competitive process involving 73 applicants of which only 40 were successful • Round 19 WA Government Co-Funded Drilling Agreement in place: − Four diamond

  26. Slide 26: Rocky Dam Pyrite/Sulphur and Gold

    Rocky Dam Pyrite/Sulphur and Gold Rocky Dam Looking east from Delta gold anomaly towards pyrite/sulphur target 26

  27. Slide 27: Rocky Dam Pyrite/Sulphur and Gold

    Rocky Dam Pyrite/Sulphur and Gold • Located near regional mining centre & infrastructure: – ~55kms via sealed (~35kms) & unsealed (~20kms) roads from Kalgoorlie – ~30kms2, with pyrite/sulphur targets to east and gold anomalies to the west • Rocky Dam Pyrite/Sulphur: – Pyrite/sulphur deposit • Rocky

  28. Slide 28: Rocky Dam Sits North of Aruma's Slate Dam

    Rocky Dam Sits North of Aruma’s Slate Dam • Aruma’s Slate Dam Gold Project: - Along trend from Majestic/Imperial & Trojan gold mines - Black Flag Group similiar to Gold Fields Ltd’s Invincible deposit >3M oz. @ >4g/t Au • Rocky Dam Gold targets: - Hosts Slate Dam type targets - Two broad targets whe

  29. Slide 29: CRA Drilling Identified a Potential Gold Deposit

    CRA Drilling Identified a Potential Gold Deposit • Gold anomaly identified by auger drilling: – >150ppb Au 200m area Program Type Holes Metres Avg Metres – >30ppb Au over 400m x 200m RDR001 - RDR027 RAB 27 532 20 area RDR028 - RDR067 RAB 40 943 24 Total RAB RAB 67 1,475 22 • Followed up with RAB dri

  30. Slide 30: CRA Drilling Identified a Potential Gold Deposit

    CRA Drilling Identified a Potential Gold Deposit Refer to ASX announcement 11 Jan. 2019 30

  31. Slide 31: Gold Anomaly - Delta RAB drilling

    Gold Anomaly - Delta RAB drilling From To Width Au Sample (m) (m) (m) (g/t) QBP801 0 8 8 0.005 QBP801 8 12 4 0.050 QBP802 0 8 8 0.005 QBP802 8 13 5 0.270 QBP803 0 8 8 0.005 QBP803 8 16 8 0.005 QBP803 16 17 1 0.160 QBP804 0 8 8 0.005 QBP804 8 12 4 0.030 QBP805 0 8 8 0.005 QBP806 0 8 8 0.040 QBP807 0

  32. Slide 32: Investment Rationale

    Investment Rationale • Tarraji/Yampi: – Large scale Ni-Cu-Au opportunity – Known mineralisation – Emerging region with drill ready targets • Rocky Dam Pyrite/Sulphur & Gold : – Pyrite/sulphur target – Surrounded by Riversgold; Northern Star; Sumitomo; Aruma and Silver Lake with gold targets identifi

  33. Slide 33: Contact Us

    Contact Us • A | Ground Floor, 70 Hindmarsh Square, Adelaide SA 5000 • T | +61 8 7324 3195 • F | +61 8 8232 8811 • E | info@tycheanreources.com • W | www.tycheanresources.com • ACN | 119 031 864 33

  34. Slide 34: JORC Table: Section 1 Sampling Techniques and Data

    JORC Table: Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.) 34

  35. Slide 35: JORC Table: Section 1 Sampling Techniques and Data

    JORC Table: Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.) 35

  36. Slide 36: Section 2 Reporting of Exploration Results

    Section 2 Reporting of Exploration Results (Criteria in this section apply to all succeeding sections.) 36

  37. Slide 37: Section 2 Reporting of Exploration Results

    Section 2 Reporting of Exploration Results (Criteria in this section apply to all succeeding sections.) 37

Dreadnought Resources — Investor Presentation (January 2019) on 6ix