Triangle Petroleum Corporation
Triangle Petroleum — Investor Day (August 2011)
39 slides from Triangle Petroleum's investor day presentation, Aug 16, 2011
Slide 1: Analyst Day Presentation
AUGUST 15, 2011 ANALYST DAY PRESENTATION TRIANGLE
Slide 2: Forward Looking Statement
Forward Looking Statement This presentation includes a number of forward-looking statements that reflect the current views of out management with respect to future events and financial performance, You can identify these statements by forward-looking words such as “may,” “will,” “expect, ” “anticipa
Slide 3: Table of Contents
Table of Contents VII SUMMARY ACREAGE OVERVIEW WILLISTON BASIN GEOLOGY STATION PROSPECT OPERATIONS FINANCIAL OVERVIEW KEY INVESTMENT CONSIDERATIONS ok YK 12 26 29
Slide 4: Summary
I Summary
Slide 5: Summary
Summary 1M ~72,050 net acres, 44% operated, acquired at ~$1,300/acre in the Bakken Oil Play ~30,000 net acres in Core Area, including ~22,000 net acres in Dunn, Divide, McKenzie and Williams counties with average per well IRR of ~50% at current strip prices — Several years remaining under leases wit
Slide 6: Executive Management Team
Executive Management Team TITLE PERSONNEL PRIOR EXPERIENCE CHIEF EXECUTIVE OFFICER PRESIDENT AND CHIEF FINANCIAL OFFICER Jonathan Samuels GENERAL COUNSEL Jeremy Wagers W Most cecently with Palo Alto Investoss, ILC 1 Peter Hill has been Dicector and Chief Executive Officer of Tuiangle since December
Slide 7: Acreage Overview
Il Acreage Overview
Slide 8: Williston Basin Acreage Position
Williston Basin Acreage Position ‘Thiangle holds a meaningful acreage position west of the Nesson anticline in the Williston Basin Source: Timp Protas Caer, 2011
Slide 9: Williston Basin Geology
III_ Williston Basin Geology
Slide 10: Williston Basin Highlights
Williston Basin Highlights Industry has substantially de-risked the Play defining commercial boundaries 8mm acre continuous oil accumulation 250-400bn barrels of estimated oil in place (NDIC, ND geological survey, 2008) 4.9-6.2bn barrels of estimated recoverable reserves from Middle Bakken and Three
Slide 11: Bakken Petroleum System
Bakken Petroleum System a IMMATURE * 275 Miles = 5 Soc: Connestl Coors Pesntaion, 2011
Slide 12: Middle Bakken Acreage — Geology
Middle Bakken Acreage — Geology Map overlay below represents Middle Bakken oil saturation; Triangle has targeted lease acquisitions in areas with >30% oil saturation (shown in green) MIDDLE BAKKEN CHARACTERISTICS 10,800-11,200 feet Dolomitic Siltstone LITHOLOGY Sandstone NET THICEN! 27-38 feet POROS
Slide 13: Three Forks Acreage — Geology
Three Forks Acreage — Geology The Three Forks formation is present on nearly 100% of Teiangle’s Williston acreage in varying degrees of thickness of up to 55 feet ‘THREE FORKS CHARACTERISTICS 10,850-11,250 feet LITHOLOGY Laminated Dolomitic Siltstone NET THICKNESS 5-55 feet POROSITY 6%- 10% ISTE XCA
Slide 14: Williston Basin Schematic Cross Section
Williston Basin Schematic Cross Section ™ Up to 9 play-types identified in the Bakken Play = Controlled by geology and basin geometry Station Prospect has 5 play type targets SOUTHWEST Station Prospect Zone Zone Zone # Target # Target # Target 1 Middle Bakken. 4 Middle Bakken/Samson 7 Elm Coulee 2 }
Slide 15: Station Prospect
IV_ Station Prospect
Slide 16: Station Prospect — Key Features
Station Prospect — Key Features sone Trigg Porm Ceperatn, 211
Slide 17: Station Prospect — Key Features
Station Prospect — Key Features ENERGETICS INC 34-35 2508521257000 1m Mature, oil yielding Upper BUCKHORN PET 8-16 2508521409000 ‘T27N RSSE $35 2,212 2/24/1979 and Lower Bakken Shale ‘T29R RS2E S16 2,117 5/20/1983 ——— - = Oil bearing Middle Bakken— (EFE — ne 38? thick — _ aie Sq Dolomite pinch — out
Slide 18: Station Prospect
Station Prospect The below map displays Triangle’s acreage position, underlain by Triangle’s interpretation of the level of Bakken oil saturation in the area m1 Triangle’s regional mapping shows that oil saturation within the Middle Bakken and Three Forks is >30° (green) n Source: Tine Prats Coporii
Slide 19: Operations
V_ Operations
Slide 20: Select Non-Operated Well List
Select Non-Operated Well List ‘Triangle WI Producing Well Name Operator Status COUNTY Target [Petra [aod [eau Mekese | Si [crest [eoaia Promes eke | TF [cnzay 13-68 lena occ Retiese | BGO [Rowdee Feasa ST Bao. resi Rete BEEN, [Beams 1-21-16-8 [sew [Bocce Refese | SiG [Rossi 321 [Hee Taker resi Das.
Slide 21: Experienced, Growth-Oriented Operational Team
Experienced, Growth-Oriented Operational Team ‘Thiangle has approached the buildout of its operational team by focusing on five key operational disciplines outlined below
Slide 22: Experienced, Growth-Oriented Operations Team
Experienced, Growth-Oriented Operations Team OPERATIONAL DISCIPLINE PERSONNEL PRIOR EXPERIENCE Kim Perez DRILLING Domini Spencer John Whittington, COMPLETIONS [i iaaaastenes PRODU cracuites [anil RESERVOIR, MANAGEMENT Cssig Smith 1 Most cecentiy with EOG Resources, Ine After 30 yeces of secvice, Me
Slide 23: Path to Operatorship — Converting Non-Operated to Operated
Path to Operatorship — Converting Non-Operated to Operated Goal of 70% operated / 30% non-operated position Controls pace of development ‘Maximize operational efficiency and reserve capture Control cost base Creates new business opportunities via vertical integration and joint ventures Increases uni
Slide 24: Operational Strategy and Execution
16 Operational Strategy and Execution Strategy: Safety, envionment and efficiency are paramount in Triangle’s strategy Capitalize on Bakken knowledge and technology to efficiently develop position Plan for success; utilize flexibility in design / cost to pursue existing, proven and upside production
Slide 25: Drilling
ru Drilling XTREME DRILLING RIG7 Contract and Execution m Two-year term Estimated spudding of first well by October 1, 2011 m “Sister rig” currently working in the basin $23,500 day rate Inventory 1,000 HP Draw-works 1,600 HP pumps Top drive Self skidding Pad design incorporates Xtreme’s skid system
Slide 26: Growing From Rig > Rigs
1s Growing From 1 Rig > 3 Rigs Ongoing evaluation of securing additional drilling rigs Triangle Operations is planning to expand to 3 drilling rigs by year-end 2012 ‘New-build options are readily available for Q3’12 delivery Rig contractors already shopping new-build tigs to Triangle ‘New-builds all
Slide 27: Development Strategy
Development Strategy Initial Deilling Plans and Multi-well Pad Design & Pa ' i es ee Ob ha inci 2 2 2 2 Z t : 19
Slide 28: Drilling Unit Layout
Drilling Unit Layout 1,280 Acre Drilling Uni mi 2.well pads per 1,280 unit wm Plan 4 wells per well pad Up to 2 Middle Bakken laterals (~9,800" length in zone) Up to 2 Three Forks laterals (~9,800° length in zone) a Ee Total of up to 8 wells per 1,280 ae ee 2 2 = = . m) Maximize oil recovery H 2 ™ C
Slide 29: Completions
21 Completions \GGERED (ZIP THREE FORKS. MIDDLE BAKKEN Strategy Generate an inventory of 5 to 7 wells through winter 2011- 2012 Begin completions in Q2"12 Batch complete multiple wells back-to-back ‘Maximize efficiencies and realize benefits of full- scale operations ml Reduce effects of harsh winte
Slide 30: Planned Well Profile
Planned Well Profile } | 1,280 Acre Drilled Lateral m Design Accommodating to planned completion technique Optimized for production life of well — use gas lift Flexible to incorporate identified, future, up-hole potential m Casing Program 99/8” surface casing at ~2,200° measured depth 7” intermediat
Slide 31: Integrated Production and Marketing Strategy
Integrated Production and Marketing Strategy OPERATIONAL EFFICIENCIES COST CUTTING AND MARKETING FOCUS Mm Reduce gathering, disposal and labor Reduce facility and infrastructure cost Opportunity to develop additional zones with existing Lower oil and gas deductions to market infrastructure © Minimiz
Slide 32: Integrated Production and Marketing Strategy
Integrated Production and Marketing Strategy INFRASTRUCTURE CC 3000 2000 1,000 500 TFPD Optimized THD OTFFDTFPD Syetem Type 3,000 TFED 0 TEED 1.000 TFED 500 TFPD Opamized INFRASTRUCTURE COSTS BY CATEGORY Marenag ‘Flowback Processing Flowback Disposal WOR Tanke ‘Roads/Locaton Constmuetion/ Pore Proce
Slide 33: Drilling & Completions Schedule
Drilling & Completions Schedule october > = % wm To be reoscupie wa s -» Proauetion | Drilling operations commence by October with Xtreme Drilling Rig 7 um Targeting commencement of completions operations in Q2’12 Batch frac’ing increases efficiency, lowers cost
Slide 34: Financial Overview
VI_ Financial Overview
Slide 35: Current Financial Position
Current Financial Position m §110mm of cash m No hedges m No debt mi Two-year tig contract with Xtreme Coil Drilling Corp. Mm Share Price: $6.41 ‘Xtreme Drilling Rig 7 um Fully Diluted Shares Outstanding: 453mm ‘Total standby exposure of $14.5mm Market Capitalization: $290mm mt Enterprise Value: $18
Slide 36: Focus on Liquidity
Focus on Liquidity DETAILED SOU] Uses Low Range High Range Comments Operated Drilling Program $s 850 $ 110.0 Can accelerate / decelerate as needed Non-Operated Drilling Program § 600 $ 80.0 Holds >70% of non-operated position ‘Remaining Land Spend s 50 $ 15.0 Primarily operated units Infrastructure
Slide 37: Budget & Operated Well Count
Budget & Operated Well Count BUDGET ALLOCATION: TO THE DRILLBIT o ST PRODUCTION EXIT RATE BY QUARTER Opened Daiting 2300 4 Bregam ‘Now-Opennted Dail 2,000 am Remaining Land Spend 1800 snfeatevenue 1,000 ces Sis o+ Bit Qe Qe gene gsie quia 'T BY QUARTER 10 _—_ oe Ef Qui Qi ait 1 qu Cee) Cone a2 its N
Slide 38: Key Investment Considerations
‘VII Key Investment Considerations
Slide 39: Key Investment Considerations
Key Investment Considerations 1M ~72,050 net acres, 44% operated, acquired at ~$1,300/acre in the Bakken Oil Play ~30,000 net acres in Core Area, including ~22,000 net acres in Dunn, Divide, McKenzie and Williams counties with average per well IRR of ~50% at current strip prices — Several years rema