    FORWARD LOOKING STATEMENTS Outlooks, projections, estimates, targets and business plans in this presentation or any related subsequent discussions are forward - looking statements . Actual future results, including TransAtlantic Petroleum Ltd . ’s own production growth and mix ; financial results ;

  3. Slide 3: Investment Thesis

    INVESTMENT THESIS • Significantly increasing drilling activity in 2H13 • Capital deployed on most favorable projects • Three - part strategy in Turkey provides clear path to grow production and cash flow • Resuming activity in Bulgaria with new partner • Expert team in place to execute capital plan

  4. Slide 4: Objectives

    OBJECTIVES 4 Optimize Assets to Increase Production and Cash Flow • Utilize North American technology to more efficiently produce assets - Horizontal drilling, stimulation and 3D seismic • Manage from Dallas headquarters • Deploy capital using proven industry expertise and decrease costs • $130 mill

  5. Slide 5: Expert Technical Team in Place

    EXPERT TECHNICAL TEAM IN PLACE 5 Technical Team Position Select Experience Darcy Dorscher Vice President, Production International E&P experience in the Former Soviet Union , Kazakhstan, Qatar, India, Turkey and Madagascar Mitch Whatley Vice President, Drilling Pioneer Natural Resources: Eagle Ford

  6. Slide 6: Operating and Financial Highlights

    OPERATING AND FINANCIAL HIGHLIGHTS 6 Results for three months ended: 6/30/2013 3/31/2013 6/30/2012 Net p roduction Oil (BBLD) Natural Gas (MCFD) BOED % Oil 2,527 8,967 4,022 63% 2,660 8,904 4,144 64% 2,560 11,879 4,538 56% Prices Oil (BBL) Natural Gas (MCF) $94.13 9.57 $103.00 10.12 $97.49 8.49 Aver

  7. Slide 7: Three-Part Strategy to Increase Production and Cash Flow in Turkey

    THREE - PART STRATEGY UNDERWAY TO INCREASE PRODUCTION AND CASH FLOW IN TURKEY 7 2) Selmo Field Redevelopment • Remodeled field using 3D seismic and increased well control, identified undepleted fault blocks • Recent success on first horizontal well into most prolific formation in the field 1) Molla

  8. Slide 8: Focus Areas Have Known Production

    8 125 miles 200 kilometers FOCUS AREAS HAVE KNOWN PRODUCTION 12.5 Bcf Proved Reserves (18% YE12) 9.0 MMcf/d Production (37% 2Q13) 9.5 MMBoe Proved Reserves (82% YE12) 2,527 Bbl/d Production (63% 2Q13) Note: Production is average for 2Q13. Proved reserves are DeGolyer and MacNaughton as of 12/31/2012

  9. Slide 9: Molla Geological Targets

    Demonstrated horizontal success with Göksu - 3H at 250 Bbl/d after 9 months of production Vertical discovery Bahar - 1 IP ~600 Bbl/d post frac Bahar - 2 tested 170 Bbl/d Potential resource play 1) MOLLA GEOLOGICAL TARGETS 9 Target Zones Şelmo producing zone

  10. Slide 10: Molla Area

    1) MOLLA AREA 10 TransAtlantic’s Şelmo Field TransAtlantic’s Bahar Field TransAtlantic’s Molla Field TransAtlantic’s Molla 3D Seismic Bat ı Raman Field Largest oil field in Turkey TPAO Dadaş Discovery Ciksor Shell/TPAO Dadaş JV Shell/TPAO Sarıbuğday - 1 TPAO Mardin Discovery Bostanpinar TransAtlanti

  11. Slide 11: Molla Mardin Discoveries

    1) MOLLA MARDIN DISCOVERIES 11 Formation Overview • Fractured carbonate present across the region; i nitial vertical discoveries bolstered by horizontal drilling • 1P reserves: 0.6 MMbbls (1) ; 2P reserves: 2.9 MMbbls (1) Göksu - 5H (Horizontal, 3,000’ lateral) • AFE: $3.5 million; currently complet

  12. Slide 12: Molla Drilling Progress

    13.2’ 4.0 m 14.1’ 4.3 m 25.0’ 7.6 m 27.1’ 8.3 m 26.1’ 8.0 m 30.4’ 9.3 m 0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 20 25 30 35 Göksu-3H Bahar-2 Göksu-4H Oba-1 Çatak-1 Göksu-5H Penetration Rate (meters per hour) Penetration Rate (feet per hour) Mardin Intermediate Hole Performance 11.7’ 3.6 m 11.5’ 3.5 m 25.5’

  13. Slide 13: Molla Drilling Progress, Continued

    $423 / ft $129 /m $285 / ft $87 /m $196 / ft $60 /m $193 / ft $59 /m 0 20 40 60 80 100 120 140 0 50 100 150 200 250 300 350 400 450 Göksu-3H Göksu-4H Oba-1 Göksu-5H $ per meter $ per foot Mardin Surface Hole Cost 1) MOLLA DRILLING PROGRESS, CONTINUED 13 Molla surface drilling costs have decreased wi

  14. Slide 14: Molla Bahar Discoveries

    Formation Overview • Conventional sandstone targets immediately above and below Dadaş; expect to shoot 3D seismic in September 2013 • 1P reserves: 1.4 MMbbls (1) ; 2P reserves: 2.5 MMbbls (1) Çatak - 1 (Vertical, 11,000’ depth ) • Oil shows in Mardin, Hazro, Dada ş & Bedinan • Primary Bedinan target

  15. Slide 15: Molla Bahar-Hazro Targets

    1) MOLLA BAHAR - 1 HAZRO TARGETS 15 150 Bbl/d – Bahar - 1 170 Bbl/d – Bahar - 2 Cored – Çatak - 1

  16. Slide 16: Molla Bahar-Bedinan Target

    1) MOLLA BAHAR - 1 BEDINAN TARGET 16 Dadaş 1 Oil & gas shows Bedinan H1 Sand 600 Bbl/d – Bahar - 1 Cored – Ç atak - 1

  17. Slide 17: Molla 3D Seismic Progress

    1) MOLLA 3D SEISMIC PROGRESS 17 Seismic data shot as of August 11, 2013. Molla 3D seismic program encompasses approximately 800 km 2 (300 square miles). TransAtlantic’s Molla Field TransAtlantic’s Göksu Field Perenco’s Kastel Field TransAtlantic’s Bahar Field TPAO Discovery Bostanpinar

  18. Slide 18: Molla Gravity Map

    1) MOLLA GRAVITY MAP Field discoveries align well with gravity data; m eaningful structural and stratigraphic running room Kastel Field (EUR 15 MMbo ) (1) DeGolyer and MacNaughton reserves as of 12/31/2012, based on $108.30/barrel and $8.94/Mcf. Arpatepe JV (TAT 50%) Proved Structures Gravity - Indi

  19. Slide 19: Selmo Field Redevelopment

    2) ŞELMO FIELD REDEVELOPMENT 19 Şelmo Background • Second largest field in Turkey (~600 - 800 million barrels of oil in place, ~87 million barrels cumulative production) • 100% working interest • Discovered by Mobil in 1964 • 2012: drilled 9 development wells; performed 10 fracture stimulations, ave

  20. Slide 20: Selmo Field Remodeling

    2) ŞELMO FIELD REMODELING 20 Remodeling Has Resulted in Improved Targeting • Extensive work done to remodel Ş elmo and identify bypassed oil; field is extremely fractured • New dynamic model incorporates updated substructure mapping with production and pressure histories to determine areas of the fi

  21. Slide 21: Selmo Field Remodeling, Continued

    2) ŞELMO FIELD REMODELING , CONTINUED 21 Ş elmo Horizontal Well Location

  22. Slide 22: Thrace Basin Development

    3) THRACE BASIN DEVELOPMENT 22 Action Plan • Drilling second of four horizontal wells in Thrace Basin South (BTD - 4H, 41.5% working interest) • Last several fracs in Thrace Basin South successful; increasing activity in Mezerdere (Keşan and Teslimkoy formations) • Recent discovery in Thrace Basin C

  23. Slide 23: Thrace Basin Geological Targets

    3) THRACE BASIN GEOLOGICAL TARGETS 23 Conventional gas 400 – 1,500 meters (1,300 – 5 ,000 feet) Unconventional gas IP 1.5 MMCFD post frac Unconventional gas IP 4 MMCFD post frac Target of BTD - 4H (Drilling) Unconventional gas IP 1 MMCFD post frac Target of DTD - 19H (Completing) Target Zones

  24. Slide 24: Thrace Basin Structure

    3) THRACE BASIN STRUCTURE 24 T EKIRDA Ğ O SMANLI Y ILDIRIM H AYRABOLU

  25. Slide 25: Thrace Basin South: Horizontal Drilling

    3) THRACE BASIN SOUTH: HORIZONTAL DRILLING 25 Tekirdağ Horizontal Drilling • Drilling second horizontal well in Tekirdağ (BTD - 4H, 41.5% working interest) • Targeting Teslimkoy formation (2,500’, productive zone) ; AFE $1.5 million • Plan to drill two additional Tekirda ğ horizontal wells Completin

  26. Slide 26: Thrace Basin South: Recent Discovery

    3) THRACE BASIN SOUTH: RECENT DISCOVERY 26 Yildirim - 1 Exploration Well • Cost $1.5 million, successful two - stage frac , at 600 MCFD, ~8 month payback • Reservoir limit test indicated isolated reservoir; four appraisal wells planned on structure • Building 11.5km ( 7 mile) pipeline to tie into ne

  27. Slide 27: Bulgaria Update – New Partner

    BULGARIA UPDATE – NEW PARTNER 27 Action Plan Joint venture agreement in place; partner to fund $30 million of initial $40 million investment, then participate with 50% interest 1 Koynare Concession – First in Recent Bulgaria History • Expect to drill Deventci - R2 within 60 - 90 days • Conventional

  28. Slide 28: 2013 Planned Drill Wells

    Molla Area Selmo Field Thrace Basin Bulgaria Total 1H13 Horizontal Vertical 3 - - - - 3 - - 3 3 2H13 Horizontal Vertical 7 4 5 - 4 11 - 1 16 16 Total Horizontal Vertical 10 4 5 - 4 14 - 1 19 19 Grand Total 14 5 18 1 38 2013 PLANNED DRILL WELLS 28 Drilling rig on location in the Thrace Basin. Note: B

  29. Slide 29: Valuation

    VALUATION 29 Current Valuation Current Position • 53% PV - 10 (1P) • ~$74,000 per Boe/d (60%+ oil) • $70.00+ netbacks • 12% net debt/ capitalization at 6/30/13 • Increasing activity Market data as of August 9, 2013. Photo of Bekirler - 2 by Sertaç Eraslan, Senior Drilling Engineer.

  30. Slide 30: Investment Thesis

    INVESTMENT THESIS • Significantly increasing drilling activity in 2H13 • Capital deployed on most favorable projects • Three - part strategy in Turkey provides clear path to grow production and cash flow • Resuming activity in Bulgaria with new partner • Expert team in place to execute capital plan

  31. Slide 31: Investor Contact Information

    INVESTOR CONTACT INFORMATION Taylor B. Miele Director of Investor Relations (214) 265 - 4746 taylor.miele@tapcor.com Wil F. Saqueton VP - Chief Financial Officer (214) 265 - 4743 wil.saqueton@tapcor.com Ian J. Delahunty President (214) 265 - 4780 i an.delahunty@tapcor.com 31

  32. Slide 32: EBITDAX Reconciliation

    EBITDAX RECONCILIATION 32 $US millions For the three months ended: 6/30/2013 3/31/2013 6/30/2012 Net income from continuing operations $2.9 $3.0 $8.5 Less : Interest and other, net 0.7 0.5 1.7 Income tax expense 0.2 2.3 4.6 Exploration, abandonment, and impairment 11.9 3.9 6.9 Seismic 1.0 0.1 0.8 Fo

  33. Slide 33: PV-10 Reconciliation

    PV - 10 RECONCILIATION 33 The PV - 10 value of the estimated future net revenue are not intended to represent the current market value of the estimated oil and natural gas reserves we own. Management believes that the presentation of PV - 10, while not a financial measure in accordance with U.S. GAA