  1. Slide 1: SCR Lloydminster Thermal Field Tour

    SCR Lloydminster Thermal Field Tour July 9, 2026

  2. Slide 2: Agenda

    Agenda Adam Waterous 1 Introduction Executive Chairman Ryan Tracy 2 Business Overview President, SCR Lloydminster Thermal Chad MacDonald 3 Geoscience Manager, Geosciences – SCR Lloydminster Thermal Brandon Thomas Manager, Reservoir – SCR Lloydminster Thermal Doug Fisher 4 Development Process Manager

  3. Slide 3: Introduction

    Introduction Adam Waterous Executive Chairman

  4. Slide 4: Three Takeaways For Today

    Three Takeaways For Today 1 SCR Lloydminster Thermal is a Uniquely Positioned Oil Sands Business ▪ Operating in Saskatchewan (SK) means lower costs, lower royalties and quicker approvals ▪ “Small-Scale SAGD” approach drives faster cycle times with substantially lower capex risk ▪ SCR is the dominant

  5. Slide 5: Business Overview

    Business Overview Strathcona’s Lloydminster Thermal business is composed of four small-scale SAGD assets, two of which are planned to undergo multi-phase brownfield expansions and one greenfield project Key Statistics(1) Meota Current Mbbl/d ~34 Production ▪ Core producing asset (~21 Mbbls / d YTD)

  6. Slide 6: Why We Love Saskatchewan

    Why We Love Saskatchewan While SCR’s Lloydminster Thermal projects target smaller pools than the Alberta oil sands, they benefit from cost-effective, modular central processing facilities and a favorable royalty regime Alberta Saskatchewan Thermal Thermal Typical Alberta CPF (SCR Lindbergh) Current

  7. Slide 7: An Exclusive Club

    An Exclusive Club Strathcona has a dominant land position in the Lloydminster thermal fairway, controlling an estimated 70% of all remaining identified thermal resource in Saskatchewan SK Thermal Operators(3) SCR Lloydminster Thermal Resource vs. Peers Glenbogie North ~50% of ~20% of Current Saskatc

  8. Slide 8: Smaller Projects, Bigger Profits

    Smaller Projects, Bigger Profits Strathcona’s Lloydminster Thermal business benefits from premium realized pricing and low royalties, driving competitive netbacks versus larger Alberta oil sands peers (1)(2)(3) (4) 2025 EBITDA Netback vs. Peers (Oil Sands Assets Only, $ / bbl) P&L Breakdown ($ / bbl

  9. Slide 9: Repeatable Returns

    Repeatable Returns SCR Lloydminster Thermal projects benefit from both a fast, low-risk build process and high margin cash flows once on stream, leading to durable returns (1) Illustrative Project Cash Flow Profile @ US$70 WTI (Meota Central) 1 Build 2 Payback 3 Profit ▪ Modular, pre-fabricated CPF,

  10. Slide 10: Business Overview

    Business Overview Ryan Tracy President, SCR Lloydminster Thermal

  11. Slide 11: We Have The Right Team

    We Have The Right Team SCR Lloydminster Thermal functions as a semi-autonomous business within Strathcona, led by a lean, focused team with significant experience operating Saskatchewan thermal projects Ryan Tracy President, SCR Lloydminster Thermal ▪ 18 Years industry experience ▪ 12 Years of Saska

  12. Slide 12: Meota: The Template for the Future

    Meota: The Template for the Future Meota is SCR Lloydminster Thermal’s core producing asset, with current production across four formations and significant growth planned for the future Overview (1) Key Stats ▪ Core producing asset with stacked pay across four distinct formations: Current Production

  13. Slide 13: Edam-Vawn: Bringing Two Halves Together

    Edam-Vawn: Bringing Two Halves Together Edam-Vawn is SCR Lloydminster Thermal’s second largest producing asset, which was recently transformed through the acquisition of Vawn in 2025, driving meaningful operational efficiencies (1) Overview Net Pay (8m Cutoff) ▪ Second largest producing asset, with

  14. Slide 14: Plover Lake: Our Largest, Highest Quality Reservoir

    Plover Lake: Our Largest, Highest Quality Reservoir Plover Lake is a high-quality reservoir which has been under-exploited by prior teams; Strathcona plans to develop it in multiple phases, targeting a best-in-class SOR Overview (1) Net Pay (8m Cutoff)(2) ▪ Largest, highest quality thermal resource

  15. Slide 15: Glenbogie: Long-Term Potential Unlocked

    Glenbogie: Long-Term Potential Unlocked Glenbogie is a long-term greenfield opportunity for SCR Lloydminster Thermal, developing a large, contiguous asset base with comparable resource quality to our existing producing properties Overview (1) Net Pay, 8m Cutoff (2) ▪ High quality greenfield opportun

  16. Slide 16: Our Plan

    Our Plan SCR Lloydminster Thermal has an ambitious plan to grow to 150 Mbbls / d by 2035 (a 16% CAGR) through a series of brownfield and greenfield expansions, all utilizing the same modular, pre-fab facilities 19 150 50 1 New Small-Scale Modular Central 2 CPFs to develop large, Processing Facility,

  17. Slide 17: We Have Done This Before

    We Have Done This Before Meota Central was the fifth major Saskatchewan thermal project developed by the SCR Lloydminster Thermal team, each of which was completed on time and on budget Historical SCR Lloyd Thermal Projects (All Developed by Current SCR Lloyd Thermal Team) $450 Edam Meota West Meota

  18. Slide 18: Geoscience

    Geoscience Chad MacDonald Manager, Geosciences

  19. Slide 19: Continuing to Find More Oil Under Our Existing Assets

    Continuing to Find More Oil Under Our Existing Assets SCR Lloydminster Thermal’s delineation programs over the past four years have significantly grown the “size of the prize” at Meota and Edam-Vawn Meota 8m Pay Contour Meota Original Oil in Place (MMbbls)(1) 659 624 41 41 79 58 347 37 365 371 90% i

  20. Slide 20: Awaking a Sleeping Giant at Plover Lake

    Awaking a Sleeping Giant at Plover Lake Plover Lake represents the largest single thermal play in Saskatchewan, with significant “built-in” delineation and infrastructure due to legacy primary production in the area Plover Lake 8m Pay Contour Plover Lake OOIP(1) Bodo-Cosine (SCR Lloyd. 918 Conventio

  21. Slide 21: Development Process

    Development Process Brandon Thomas Doug Fisher Manager, Reservoir Manager, Development Josh Gauthier Manager, Production

  22. Slide 22: High Confidence Production Predictions

    High Confidence Production Predictions Strathcona’s proprietary iterative geomodelling and reservoir engineering predictions have (1) resulted in projects delivering +/- 3% of their forecasted cumulative oil (2) Geomodel Properties Forecast vs. Actuals: Peak Rate per Well Forecast vs. Actuals: Steam

  23. Slide 23: A Detailed Full Life Plan For Every Well Pair

    A Detailed Full Life Plan For Every Well Pair The long-range plan forecast is built “bottoms up” on a well-by-well basis through end of life based on the detailed geomodel and reservoir model, and re-forecasted every month with updated data (1) Illustrative Long-Range Plan, by Well Pair (Meota West

  24. Slide 24: Adding More Oil Than Steam

    Adding More Oil Than Steam The combined SCR Lloydminster Thermal development plan is expected to meaningfully reduce steam-oil ratios, leading to lower energy opex and breakevens for the business (1) SCR Lloydminster Thermal SOR (x) 4.0x (0.6x) 25% Reduction (0.1x) in iSOR (0.3x) Meota iSOR(1): 4.1x

  25. Slide 25: Operational Excellence

    Operational Excellence James King Ryan Cross Manager, Facilities Manager, Drilling, Completions and Construction Greg Nohnychuk Manager, Operations

  26. Slide 26: More Modular Equals More Repeatable

    More Modular Equals More Repeatable Lloydminster thermal projects have become more modular and pre-fabricated over time, significantly reducing the risk of cost overruns on future projects (1) Central Processing Facility Evolution Illustrative New Project Capex Breakdown (Meota Central) Husky Pikes

  27. Slide 27: Drilling Longer for Less

    Drilling Longer for Less Over the past four years SCR Lloydminster Thermal has reduced drilling and completion costs per meter by approximately 25%, in part by drilling longer laterals Average Lateral Length Per Well (meters)(1) Average Drilling and Completion Cost Per Well (C$mm)(1) 1,162 $7.0 $5,0

  28. Slide 28: One Operator Is More Efficient Than Two

    One Operator Is More Efficient Than Two The consolidation of Edam and Vawn in late 2025 has already contributed to significant cost and revenue synergies, with further benefits anticipated post the planned 2027 pipeline interconnect Cash Flow Uplift From Consolidation (Annual, C$mm) Edam-Vawn Steam

  29. Slide 29: Marketing

    Marketing Adam Lonseth Manager, Rail and Risk Management

  30. Slide 30: Hamlin: A Different Approach to Crude-by-Rail

    Hamlin: A Different Approach to Crude-by-Rail Strathcona’s owned and operated Hamlin rail terminal is the only crude-by-rail terminal in Canada which delivers better netbacks than pipelines, while insulating SCR from differential volatility Unit Train Route (CN) 2017 – 2026 All-In Net Realized Price

  31. Slide 31: Strathcona Resources Ltd.

    NS STRATHCONA “= RESOURCES LTD

  32. Slide 32: Forward Looking Information

    FORWARD LOOKING INFORMATION Certain statements contained in this presentation constitute forward-looking reserve volumes; expectations regarding Strathcona’s capital program, projects required to reach 150 Mbbls/d; concurrent multi-project execution risk, information within the meaning of applicable

  33. Slide 33: Oil and Gas Advisories

    OIL AND GAS ADVISORIES Production and Reserves Information performance of wells; however, such type curves and well economics are not In respect of 2025, Strathcona’s reserves have been evaluated in accordance necessarily determinative of the production rates and performance of existing with Canadia

  34. Slide 34: Non-GAAP Financial Measures and Ratios

    Non-GAAP Financial Measures and Ratios Non-GAAP financial measures and ratios are used internally by management to assess the performance of The following table summarizes ”Oil and natural gas sales, net of blending”, “Realized Price”, “Field Operating Income”, Strathcona. They also provide investor

  35. Slide 35: Slide Notes

    Slide Notes Slide 4 (1) Refer to “Oil and Gas Advisories” for description of “identified thermal resource” (2) Forecasted production and timeline for growth projects based on Strathcona internal estimates, as of July 2026. Refer to "Oil and Gas Advisories" with respect to expected 10-year growth pla

  36. Slide 36: Slide Notes

    Slide Notes Slide 16 Note: Forecasted production, capital costs, and timeline for SCR growth projects based on Strathcona internal estimates, as of July 2026. Refer to "Oil and Gas Advisories" with respect to expected 10-year growth plan, including timing and the projects and expected additional pro