Philex Mining Corp. · PSE:PX

Philex Mining — Q1 2018 Earnings Presentation

16 slides from Philex Mining's earnings presentation, May 10, 2018

  1. Slide 1: Joint Analyst Briefing 1Q2018 Financial and Operating Results

    Joint Analyst Briefing 1Q2018 Financial and Operating Results May 10, 2018

  2. Slide 2: Highlights

    Highlights • 1Q2018 Core Net Income At P346 Million • Reported Net Income At P303 Million • Cash Costs And Expenses At P1.288 Billion • US$5.0 Million Short-term Debt Repaid In April-may; Outstanding Short-term Debt Down To US$44.0 Million Todate • Mine Life Extension Study Ongoing; Expected Complet

  3. Slide 3: Operating Highlights

    Operating Highlights Inc 1Q2017 1Q2017 (Dec) Tonnes Milled ('000) 2,197 1,998 10% • Tonnes milled: production- Production Gold – ozs 17,947 22,451 -20% Copper - lbs ('000) 7,073 7,752 -9% related issues addressed Metal Recovery (%) • Metal production: affected Gold 77 83 -7% Copper 79 84 -6% by low

  4. Slide 4: Financial Highlights

    Financial Highlights (in PHP million, unless indicated) 1Q2018 1Q2017 Inc/(dec) • Revenue: affected by low Gross Revenue 2,373 2,542 -7% metal production Smelting Charges 207 207 - • Cost and expenses: Cost & Expenses 1,697 1,668 2% Income from Operations 468 668 -30% higher due to increase in Other

  5. Slide 5: Revenue Breakdown

    Revenue Breakdown Revenue Performance 1% 1% Revenue per Product Inc (PhP million) 1Q2018 1Q2017 39% (Dec) Gold 1,237 1,426 -13% 43% Copper 1,117 1,094 2% Silver 19 22 -14% TOTAL 2,373 2,542 -7% 60% 56% 1Q2018 1Q2017 Gold Copper Silver 5

  6. Slide 6: Costs and Expenses

    Costs and Expenses (in PHP million) 1Q2018 1Q2017 Inc (Dec) • Materials and supplies and Production cost labor: continued judicious use Materials & Supplies 428 457 -6% of resources Power 294 324 -9% • Power: lower renegotiated Labor 220 224 -2% rates Contracts 59 47 26% • Depreciation and Others 63

  7. Slide 7: Capital Expenditures

    Capital Expenditures Capital Expenditure Capital Expenditure Breakdown Performance Other mine exploration 600 (PhP million) 1Q2018 1Q2017 Inc (Dec) Silangan & Kalayaan Padcal & Head Office P513M Padcal & Head Office 369 321 15% 500 P448M Silangan & Kalayaan 37 173 -79% 400 Other mine 42 19 121% expl

  8. Slide 8: Financial Position

    Financial Position ASSETS (in PHP million) As of As of Inc (Dec) Mar 31, 2018 Dec 31, 2017 Cash & cash equivalents 427 584 -27% • Deferred Exploration Receivables & others 5,822 5,683 2% Current assets 6,249 6,267 - costs: investments in Property, plant & equipment 6,645 6,721 -1% Silangan and susta

  9. Slide 9: Recent Developments

    Recent Developments • Study on Padcal mine life extension to be completed in July • Silangan options explored • Value generation from investments in and advances to PXP Energy Corp. under consideration 9

  10. Slide 10: Financial Highlights and Operational Updates

    Financial Highlights and Operational Updates

  11. Slide 11: Profit and Loss

    Profit and Loss % Inc (in PhP millions) Q1 2018 Q1 2017 (Dec) Gross revenue ₱ ₱ 6 18% Cost and expenses 41 37 12% Loss from operations (11) (11) -2% Other income (charges) 2 3 -8% Reported net loss ₱ 8 ₱ 8 -1% • 18 % increase in petroleum revenues due to:  3.4 % lower output offset by 24% higher cr

  12. Slide 12: Financial Position

    Financial Position ASSETS (in P HP millions) As of Mar 3 1 , As of Dec 3 1 , % In c 2018 2017 (Dec) Cash & cash equivalents ₱ ₱ -2.1% Receivables and other CA 69 76 -8.9% Current assets 510 526 -3.0% Deferred exploration costs & other NCA 6,867 6,703 2.4% To ta l a ssets ₱ , ₱ , 2 .0 % LIABILITIES A

  13. Slide 13: Operations Update

    Operations Update PXP ENERGY WEST PHILIPPINE SEA PALAWAN

  14. Slide 14: Operations Update 1/3

    Operations Update 1/3 SC 72 Recto Bank (Forum 70%)  Under Force Majeure (FM) since 15 December 2014.  Forum will have 20 months upon lifting of the FM to drill the two (2) commitment wells. SC 75 NW Palawan (PXP 50%)  Under FM since 27 December 2015.  Sub-Phase 2 will have a term of 18 months up

  15. Slide 15: Operations Update 2/3

    Operations Update 2/3 SC 40 North Cebu (Forum 66.67%)  Completed the plugging and abandonment (P&A) of L95-1 well in Libertad Field last November 2017.  Completed a detailed land gravity survey in northern Cebu last 25 April 2018 with a total of 94 gravity stations acquired. SC 14 Matinloc and Tar

  16. Slide 16: Operations Update 3/3

    Operations Update 3/3 SC 6A Octon Block (PXP 5.56% / Forum 5.56%)  Completed the Pre-Stack Depth Migration (PSDM) processing and quantitative interpretation (QI) of the 2013 3D seismic data.  The work program for 1H 2018 includes 3D seismic interpretation, which will integrate the results of the Q

Philex Mining — Q1 2018 Earnings Presentation on 6ix