Diatreme Resources Limited · ASX:DRX
Diatreme Resources — Investor Presentation (November 2014)
31 slides from Diatreme Resources's investor presentation, November 2014

Slide 1: Investor Presentation November 2014
NOVEMBER 2014 INVESTOR PRESENTATION COMPANY OVERVIEW

Slide 2: Disclaimer
DISCLAIMER This presentation contains certain forward-looking statements and forecasts which include without limitation, expectations regarding future performance, exploration, mineral resources, the financial position of Diatreme Resources Limited (the “Company”), industry growth or other trend pro

Slide 3: Company Summary
COMPANY SUMMARY DRX— Capital Structure Directors Position Shares on Issue 719.2 Million William Wang Chairman Options on Issue (Listed) 15.3 Million Andrew Tsang Non Executive Director Options on Issue (Unlisted) 42.7 Million Daniel Zhuang Non Executive Director Share Price (as at 24/11/2014) A$0.01

Slide 4: Mineral Sands Development – Eucla Basin
MINERAL SANDS DEVELOPMENT – EUCLA BASIN Iluka 4

Slide 5: Cyclone Project Summary
CYCLONE PROJECT SUMMARY • JORC Resource: Currently 221Mt @ 2.1% HM. • Mineable ore: 120 million tonnes @ 2.4% HM (Cyclone + Cyclone Extended) • CAPEX of $A146 million and annual average OPEX of $A80 million • Annual net average EBITDA of $53M per annum during mine life • Joint venture with Hong Kong

Slide 6: Cyclone Project Comparison – In-Ground Value
CYCLONE PROJECT COMPARISON – IN-GROUND VALUE In-situ ore value US$/t reserve (HM Developers) $35 $30 In-situ ore value (US$/t reserve) $25 $20 $15 $10 $5 Thunderbird Eneabba $0 GUN SFX PFP MZI DRX SFX AZC WTR IMA ATR 6

Slide 7: Cyclone Project Comparison – Capital Cost
CYCLONE PROJECT COMPARISON – CAPITAL COST Capital cost (HM Developers) $1,000 Project $900 $800 Capital Cost (US$m) $700 $600 $500 $400 Stage 1 $300 $200 Thunderbird $100 Eneabba $0 IMA MZI SFX DRX WTR GUN SFX ATR AZC PFP ATR 7

Slide 8: Cyclone Project Milestones
CYCLONE PROJECT MILESTONES Water Supply Massive groundwater aquifer discovered beneath Cyclone. First bore complete (>40 l/s). Pump test required for bore-field design. Mine and Haul Road Environmental studies complete and Public Environment Report submitted in November 2014. Cyclone HM Resource Exp

Slide 9: Cyclone Mining Lease
CYCLONE MINING LEASE 466000mE: 6814000mN 6812000mN, 6810000mN 470000mE. H 472000mE. meo/141 (1,558 ha) wy EL 69/2425 E R69/1 (2,621 ha) 476000mE 478000mE. 6814000mN 6812000mN 6810000mN i Dark Blue and Black - Tenement, Green - Proposed Infrastructure I sale | senor | iott 50000 pote: me@_147 BREST R

Slide 10: Cyclone Project Milestones
CYCLONE PROJECT MILESTONES Schedule Date Pre-Feasibility Study Completed - March 2012 Definitive Feasibility Study (most permits) Q2 2015 Project Financing Q3 2015 Construction & Development Q3 2016 Mining & Production Q2 2017 10

Slide 11: Proposed Mining Methods
PROPOSED MINING METHODS HMC Stockpiles Lo CYCLONE DEPOSIT Initial TSF Topsoil __Overburden Dozer Trap Slurry Pipeline

Slide 12: Transport Options
TRANSPORT OPTIONS CYCLONE Road Rail Forrest Perth Esperance Port Pirie Adelaide Mine and Haul Road Approvals Environmental Surveys – Completed Cultural Heritage Surveys - Completed EPA Assessment by Public Environmental Review – From November 12

Slide 13: Cyclone Project 2014 Financial Estimate
CYCLONE PROJECT 2014 FINANCIAL ESTIMATE • Cyclone Project including Cyclone Extended • Evaluation based on sale of HMC CIF China • 12 year mine life at 10 Mt per year • Average annual production of 155 kt HMC (A$139 M/year) • A$ 146M Capital cost estimate and annual operating cost A$ 80M HMC Price (

Slide 14: Recent ASX Announcements
RECENT ASX ANNOUNCEMENTS • 7th November – Tick Hill Mining leases purchased from MIM (Immediate mining opportunities to exploit & cash flow potential) • 11th November – Cyclone Extended acquired from Image Resources NL (Adds 53% to resource size and 4-5 years to mine life) • 17th November – Cyclone

Slide 15: The Investment Opportunity
THE INVESTMENT OPPORTUNITY • Experienced management/board with ‘skin in the game’ • Highly prospective tenement portfolio in mineral sands, gold & copper • Cyclone Project: Flagship project, world-class Zircon deposit, ready for transition to mining. • Tick Hill: Short term cash flow potential from

Slide 16: Growth Outlook
GROWTH OUTLOOK • Counter-cyclical investment opportunity with significant growth potential • Highly prospective project pipeline, with flagship Cyclone Zircon Project on track for mining • Experienced board/management team focused on shareholder value and aligned to shareholder interests • Reduced r

Slide 17: Extracts from Market Reports by Ruidow September 2014
EXTRACTS FROM MARKET REPORTS BY RUIDOW SEPTEMBER 2014* ZIRCON “….an average 4-5% growth in building ceramic industry can best explain that China ceramic industry has come into a stable development stage.” HiTi87 & HiTi67 “With the progress of science and technology, the utilization rate of titanium

Slide 18: Diatreme Resources
DIATREME RESOURCES | ‘aug

Slide 19: Projects Overview
PROJECTS OVERVIEW \/ A DIATREME RESOURCES LIMITED PROJECT LOCATION Tick Hill Clermont* ie 18

Slide 20: Cape Bedford, QLD
CAPE BEDFORD, QLD Cape Bedford, QLD Silica Sand, Heavy Mineral Sands EPM Application Conditions for grant agreed with Traditional Owners Size: 554 sq. km 20

Slide 21: Cape Bedford, QLD
CAPE BEDFORD, QLD Lookout Pt Large sand dune system with known silica sand and mineral sand occurrences over an area 50km x 15km in dunes up to 100m high. High grade silica in previous drilling samples. Samples indicate areas with a high value assemblage of zircon, rutile & ilmenite. Existing public

Slide 22: Clermont Project, QLD
CLERMONT PROJECT, QLD Clermont, QLD Gold, Copper 3 Granted EPM’s Size: 524 sq. km 22

Slide 23: Clermont - Prospects
CLERMONT - PROSPECTS a | | 74800001 7480000mN p 24000 | * = ped | 7a90000mN 570000mE 7470000mN Exploration Prospect N © Copper Prospect Or 1 Gold Prospect t 2000 0 2000m Scale piconet —— 1: 200000 Diatreme Resources Limited 23 i Hl i fl CLERMONT PROJECT

Slide 24: Tick Hill, QLD
TICK HILL, QLD Tick Hill, Qld Gold 3 Granted ML’s Size: 3.9 sq. km 24

Slide 25: Tick Hill, QLD
TICK HILL, QLD Tick Hill Gold Mine (circa 1993) looking easterly Produced 500,000 oz. gold from 700,000 tonnes of ore at 22.6g/t Au 25

Slide 26: Tick Hill, QLD
TICK HILL, QLD • High grade historic gold production • 513,333 ounces of gold at a recovered grade of 22.6 g/t gold • At $1,350/ounce worth A$693 million • Excellent exploration target - the faulted offset of the mined gold shoot • Potential for discovery of another 500,000 oz ore body • Immediate o

Slide 27: Grays Hill, QLD
GRAYS HILL, QLD Grays Hill, Qld Copper, Gold Mineral Sands Granted EPM25117 Size: 237 sq. km 27

Slide 28: Grays Hill, QLD – Exploration Potential
GRAYS HILL, QLD – EXPLORATION POTENTIAL HM strandline potential - embayment HM strandline and dune potential - old shorelines Permian Volcanics with intrusives / breccia Known Porphyry Cu-Mo mineralisation Epithermal Au / base metals potential 28

Slide 29: Glenthompson, VIC
GLENTHOMPSON, VIC Glenthompson, Vic Copper, Gold Granted EL5478 Size: 123 sq. km 29

Slide 30: Glenthompson, VIC
GLENTHOMPSON, VIC Highly prospective for base metals as the region contains Andean-style copper-gold porphyry systems. Geological Survey of Victoria regard the area as highly prospective citing “the tenement lies within the centre of a fertile porphyry belt”. Gravity survey completed defining severa

Slide 31: Contacts
CONTACTS Neil McIntyre – Diatreme Chief Executive Level 2, 87 Wickham Terrace, Spring Hill, QLD 4000 07 3832 5666 or 0468 370 660 neil.mcintyre@diatreme.com.au William Wang – Diatreme Chairman Suite 1906 Level 19, 109 Pitt Street, Sydney, NSW 2000 02 9223 5899 or 0412 146 036 william.wang@diatreme.c
Source: Internet Archive copy of diatreme.com.au
More decks from Diatreme Resources Limited
Noosa Mining Investor Conference 202623 slides · Jul 22, 2026
Noosa Mining Investor Conference 202526 slides · Nov 14, 2025
Noosa Mining Investor Conference 202522 slides · Jul 24, 2025
Noosa Mining Investor Conference 202435 slides · Nov 14, 2024
Noosa Mining Conference 202431 slides · Jul 18, 2024
Brisbane Mining Investor Conference 202428 slides · Mar 13, 2024