Orezone Gold Corporation · TSX:ORE

Orezone Gold — Investor Presentation (May 2020)

29 slides from Orezone Gold's investor presentation, May 7, 2020

  1. Slide 1: Developing the Low Cost, High Margin Bomboré Gold Project

    Developing the Low Cost, High Margin Bomboré Gold Project May 2020 Corporate Presentation Phase I RAP construction, February 2020: Natinga Village ORE:TSX.V 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains certain “forward-looking information” within the meaning of applicable Canadian securities laws and “forward-looking statement” within the meaning of applicable USA securities laws. Forward-looking information and forward-looking statements (toge

  3. Slide 3: Investment Highlights

    Investment Highlights Permitted and shovel-ready project RAP Phase I Construction 95% Complete • ~95% of Phase I RAP construction completed Excellent location with ~10Moz resources within 15km of Bomboré • Neighboring mine poured first gold ahead of schedule Supportive and knowledgeable shareholder

  4. Slide 4: Capital Structure & Research Coverage

    Capital Structure & Research Coverage Capital Structure (as at May 6, 2020) 12-Month Share Price & Volume 1,600,000 $1.00 Shares Issued 251,147,806 1,400,000 $0.90 $0.80 Shares Fully Diluted 291,489,594 1,200,000 $0.70 1,000,000 $0.60 Warrants (ORE.WT:TSX.V) 18,797,950 800,000 $0.50 Options (CAD$0.5

  5. Slide 5: Orezone Management Philosophy

    Orezone Management Philosophy Extensive detailed studies and peer reviews completed on the project Focus on Technical Team of mine builders and operators with a history of success Accuracy Bomboré is a technically sound project Management and board are aligned with shareholders and have acquired Ali

  6. Slide 6: Recent Developments

    Recent Developments Received ESIA approval for the Orezone is well-funded and is Phase II expansion at Bomboré prudently managing its treasury • Application filed to include the planned during this pandemic expansion in our mining permit - expected Q3 2020 “Although we are disappointed to temporaril

  7. Slide 7: Burkina Faso: An Established Gold Country

    Burkina Faso: An Established Gold Country Supportive mining jurisdiction • 14 gold mines have reached production ~10Moz gold within 15km of Bomboré* • West African Resources: Sanbrado and newly acquired Toega • New high-grade gold discoveries in this emerging district Bomboré is ideally located • 90

  8. Slide 8: Bomboré Location & Infrastructure

    Bomboré Location & Infrastructure Located in secure south-central area of Burkina Faso, 85 km from the capital of Ouagadougou and remote from troubled border regions 2 paved road options - both main service roads • Asphalt on both routes in good condition Fresh water supply located within project Ma

  9. Slide 9: Capital Intensity & AISC vs Peers

    Capital Intensity & AISC vs Peers Capital Intensity USD$/oz AISC USD$/oz $300.00 $1,234 $244/oz $250.00 $222/oz $991 $200.00 $165/oz $730 $756 Average: $154/oz $138/oz $138/oz $150.00 $120/oz $125/oz $100.00 $79/oz Continental Orezone Pure Gold $50.00 Belo Sun Lundin Sabina Falco WAF $0.00 Orezone W

  10. Slide 10: Emerging Developers Trading Values

    Emerging Developers Trading Values Emerging Developers Enterprise Value Trading Multiples1 $350 $321 Enterprise Value per ounce (USD/oz $300 $258 $250 $200 $176 $174 $183 $158 $154 $150 $131 $111 $117 $87 $96 $100 $86 $56 $40 $34 $50 $24 $25 $22 $14$12 $14 $15 $4 $0 Seabridge Falco Orezone Gabriel M

  11. Slide 11: Company Life Cycle and Value Catalysts

    Company Life Cycle and Value Catalysts Project development timeline Lifecycle of a Junior Mining Company delayed in light of COVID-19 Value Catalysts • Complete Phase I RAP • Update resource estimate and project economics • Secure project financing • Project construction • Start of commercial produc

  12. Slide 12: 2019 Feasibility Study Highlights

    2019 Feasibility Study Highlights 2019 FS Base Case @ $1,300/oz Au: Operating Highlights: • After-tax NPV5% of $361M(1)(3)(4) • 13+ years mine life • After-tax IRR of 43.8% • LOM gold production of 1.6Moz • 2.5-year after-tax payback • Average annual production: Sensitivity @ $1,500/oz Au: • 153koz

  13. Slide 13: Leverage to Gold Price

    Leverage to Gold Price Siga South Deposit – Section 10600N Current reserves of 1.8M Au oz are based on an average gold price of ~$1,185/oz M&I Resources of 5.1M Au oz are calculated using $1,400/oz At current gold prices above $1,700/oz Bomboré offers significant expansion potential • Deposit remain

  14. Slide 14: Processing Plant Expandability

    Processing Plant Expandability Oxide plant capacity of 5.2Mtpa • Oxide feed reduced to 3Mtpa upon Stage 1: Oxide Plant commissioning of the sulphide circuit Sulphide circuit capacity of 2.2Mtpa • Expandable capacity with the addition of a ball mill and leach tanks Oxide and sulphide circuits can ope

  15. Slide 15: Evolving Geological Interpretation – High-Grade Hits

    Evolving Geological Interpretation – High-Grade Hits Maga Historical drilling identified several high-grade intercepts Higher-grade intercepts did not connect when modelled CFU using the steeply dipping main shear footwall P8P9 interpretation P11 The discovery of the high-grade P17S zone prompted a

  16. Slide 16: Evolving Geological Interpretation, High-Grade Plunging W Folds

    Evolving Geological Interpretation, High-Grade Plunging W Folds CFU The artisanal miners have been mining Maga the high-grade plunging W shoots in multiple zones throughout Bomboré CFU CFU high-grade drill intercepts include: • BBD0921: 175.1 g/t Au (75.5-76.5 m) P8/P9 • BBC0768: 118.3 g/t Au (89-90

  17. Slide 17: Regional Exploration Potential

    Regional Exploration Potential Historical result: KT Oxide Target 2018 result: KT 4m @ 4.0 gpt 3m @ 7.1 gpt P13 Oxide Target 6m @ 2.0 gpt 5m @ 1.2 gpt 7m @ 1.6 gpt 14m @ 0.8 gpt 10m @ 12.9 gpt 7m @ 1.6 gpt 9m @ 1.3 gpt 7m @ 1.6 gpt 4m @ 3.7 gpt GHO P17N Oxide Target 1m @ 23.5 gpt P17N 6m @ 6.6 gpt 6

  18. Slide 18: RAP – Construction Overview & Update

    RAP – Construction Overview & Update RAP Phase I construction • Orezone temporarily suspended all on-site activities to ensure the safety of its communities, contractors and employees • ~1,100 houses in construction - 95% complete RAP Opening Ceremony, May 2019 Attended by Burkina Faso’s Prime Minis

  19. Slide 19: Phase I - RAP

    Phase I - RAP RAP Construction RAP Construction Koksin Completed Dwellings Current Houses RAP Sample Houses 19 19

  20. Slide 20: Livelihood Restoration Programs

    Livelihood Restoration Programs Programs • Market gardens developed - agronomist hired - additional gardens being developed • Speciality cash crops being developed - spices, shea butter • Chicken farming commenced - self funding and very successful to date • Reclamation including tree and shrub plan

  21. Slide 21: Orezone Community Initiatives

    Orezone Community Initiatives Harvesting Sesame Harvesting Fodder Soap Manufacturing Producing Spices Market Garden Weaving Training 21 21

  22. Slide 22: Summary

    Summary Orezone has elected to temporarily suspend on-site activities in order to ensure the health and safety of its community members, contractors and employees • RAP construction is 95% complete and Orezone is prepared for a rapid restart of activities when appropriate Permitted and advanced deve

  23. Slide 23: For more information, please contact Vanessa Pickering

    For more information, please contact Vanessa Pickering, Manager, Investor Relations: info@orezone.com Tel: 778-945-3974 23

  24. Slide 24: Appendix

    Appendix 24

  25. Slide 25: Management

    Management Patrick Downey – President, CEO & Director Ian Chang – VP, Projects • Engineer with +30 years resource industry experience • Mechanical Engineer, +33 years experience • Previously President, CEO & Director of Elgin Mining, Aura Minerals and Viceroy Exploration before its acquisition by Ya

  26. Slide 26: Directors

    Directors Michael Halvorson - Chairman Charles Oliver - Director • Over 50 years experience in the securities industry • Over 30 years experience as an award-winning fund manager • President of Halcorp Capital, a private investment corporation, since 1980 • Previously with Sprott Asset Management as

  27. Slide 27: Bomboré Mineral Resource and Reserve Estimates

    Bomboré Mineral Resource and Reserve Estimates Mineral Resource Estimate as of January 5, 2017 Classification Measured Indicated Measured + Indicated Inferred Cut-off Tonnage Grade Contained Tonnage Grade Contained Tonnage Grade Contained Tonnage Grade Contained Au g/t 000 t Au g/t Au koz 000 t Au g

  28. Slide 28: New Resource Estimate: Enhancement Opportunities

    New Resource Estimate: Enhancement Opportunities New drilling and resource modeling are expected to: 1. Extend mine life 2. Add higher grade ounces within existing pits 3. Increase M&I resources in near-surface oxides 4. Improve existing production profile – more reserve ounces in same annual range

  29. Slide 29: Thank You

    Thank You 29 29