Eq Resources Limited · ASX:EQR

Eq Resources — Investor Presentation (May 2022)

37 slides from Eq Resources's investor presentation, May 9, 2022

  1. Slide 1: EQ Resources Limited – Mt Carbine Tungsten Webinar

    EQ RESOURCES LIMITED Mt Carbine Tungsten – Webinar May 9th, 2022 ASX : EQR

  2. Slide 2: Disclaimer

    Disclaimer Competent Person's Statement • The information in this presentation partly relates to the outcomes of the Mt Carbine Bankable Feasibility Study, made available through the Company’s website www.eqresources.com.au/. • The Company confirms that it is not aware of any new information that ma

  3. Slide 3: Australia's only operational primary producer

    EQ RESOURCES: Australia’s only operational primary producer WO3 Fully Funded De-Risked Currently in production Positive Established Growing life On Track Market Infrastructure of mine & Conditions Credible

  4. Slide 4: Mt Carbine Open-cut & Modernisation Project

    Mt Carbine Open-cut & Modernisation Project Australia’s Only Primary Tungsten Producer Aerial imagery of the Mt Carbine crushing site 4

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot Value Proposition Australia’s only High-grade Multiple Low-cost Experienced primary producer of resource revenue expansion Board & tungsten (expandable) streams Leadership Team Oliver Kleinhempel Non-exec Chairman Stephen Layton Non-exec Director Zhui Pei Yeo Non-exec Director Ric

  6. Slide 6: Mt Carbine Open-cut & Modernisation Project Overview

    Mt Carbine Open-cut & Modernisation Project Overview • Located 130 km north of the city of Cairns in Far North Queensland, Australia Project Location Map • Situated within the Far North Queensland critical mineral province • Operating tungsten mine and rock quarry resulting in no mine waste • Establ

  7. Slide 7: Our Values & Culture

    Our Values & Culture Act Safe. Feel Safe. Act safe at work. Care and respect each other. Feel safe to be yourself. Embrace Difference Diversity of thinking, skills and background creates value and drives innovation. Tread Lightly Embed resource efficiency to minimise environmental footprint and deli

  8. Slide 8: Stakeholder ESG Sentiments

    Stakeholder ESG Sentiments Current ESG Organisational Performance Aspiration Stakeholders were asked to rate whether the organisation was perceived to Materiality 1 2 3 be leading or lagging across each of the 12 ESG themes. They were asked to do this for current state, as well as for where they fel

  9. Slide 9: Strategic, Social and Economic Benefits

    Strategic, Social and Economic Benefits A critical minerals project of national significance Embracing the concept of the Circular Economy, using innovation to identify suitable ore for treatment and the use of ‘by-products’ to supply road base and aggregate materials to build local roads and constr

  10. Slide 10: Tungsten: A Critical Mineral

    Tungsten: A Critical Mineral Tungsten Concentrate from Mt Carbine 10

  11. Slide 11: Tungsten Market Analysis

    Tungsten Market Analysis USES AND SCARCITY GLOBAL TUNGSTEN MARKET FUTURE OUTLOOK • Unique properties - difficult to substitute • Western Critical Mineral list • Steady demand growth of 1.5% CAGR • Military & Defense • 2x Tungsten Mines recently closed projected (2021-2030) • Medical equipment • High

  12. Slide 12: Mt Carbine Production Expansion & Development Plan

    Mt Carbine Production Expansion & Development Plan 100%-owned by EQ Resources Imagery of the Mt Carbine process plant 12

  13. Slide 13: CAPEX Funding for Mt Carbine Expansion & Early Works Program

    CAPEX Funding for Mt Carbine Expansion & Early Works Program Facility Amount ($, up to) Interest p.a. / Cost CMAI Grant $6 million Government Grant support Sandvik Supply & Finance $4.8 million 5.75% interest p.a.; 30% deposit Interest free; Extension of existing CRONIMET Offtake Prepayment $4.2 mil

  14. Slide 14: Development Timeline

    Development Timeline Phased approach for early cash flow Early Works Secure UG Funding & Internal Bankable Expansion Environmental Facilitation Engineering Study Feasibility Funding Full Scale Approval Doc Approval Complete Complete UG Study & Drawdown Operation ✓ ✓ ✓ ✓ ✓ ✓ 2021 2022 2023 Q1 Q2 Q3 Q

  15. Slide 15: Phase 1 (Early Works) & 2 Processing

    Phase 1 (Early Works) & 2 Processing Processing improvements identified through operational performance analysis Phase 1 Crushing and Screening Circuit Existing dry and wet processing facilities currently in operation Processing facilities are designed for steady-state production of 1Mtpa with Early

  16. Slide 16: Early Works Design & Delivery

    Early Works Design & Delivery Processing improvements identified through operational performance analysis Phase 1 Crushing and Screening Circuit Design ✓ Phase 1 Crushing and Screening Circuit Installed ✓ Wet screening circuit at primary crushing station ✓ Installation of pipeline from new screen to

  17. Slide 17: 'Early Works' Implementation

    ‘Early Works’ Implementation Picture of female driving truck Sandvik - Underpan ✓ Upgrade of power supply line and new substation ✓ Installation of new substation New power line 17

  18. Slide 18: 'Early Works' Implementation

    ‘Early Works’ Implementation ✓ Local Fabrication of new conveying systems ✓ Addition of 2nd Tomra XRT Sorter to cope with higher throughput New power line New Conveyors 18

  19. Slide 19: Early Works Construction

    Early Works Construction RESOURCES 19

  20. Slide 20: Early Works Construction cont.

    Early Works Construction cont. 20

  21. Slide 21: Construction

    Construction CQ RESOURCES 21

  22. Slide 22: Early Works Construction cont.

    Early Works Construction cont. 22

  23. Slide 23: Construction

    Construction CQ RESOURCES 23

  24. Slide 24: Concentrate Production Continues

    Concentrate Production Continues Tony to provide pic of bags 24

  25. Slide 25: Mt Carbine Production Ramp-Up

    Mt Carbine Production Ramp-Up OC Mine opening Tonnes installed capacity* subject to permitting 8000 3000 – 8000** 4000 Production Guidance Power Upgrade XRT Sorter Upgrade 2021 Allowing 24/7 crush & subject to Early Works with current plant screen operation upgrades** arrangement & METS Ignited pilo

  26. Slide 26: Mt Carbine Production Overview

    Mt Carbine Production Overview Concentrate Production (Kg) of 50% WO3 Equivalent Tonnes of Sorter Concentrate Produced 26

  27. Slide 27: Pre-tax Cashflow Generation – OC + UG Potential

    Pre-tax Cashflow Generation – OC + UG Potential Open Pit currently defined is +/-15% of resource Significant underground potential exists to drive economics for several more years Western Extension Lower Grade Halo in open pit where Scoping Study completed on UG Sorter Beneficiation makes feasible r

  28. Slide 28: Compelling Economics

    Compelling Economics BFS1 confirms high margins, low capital intensity & operating cost and speed to market Summary of BFS Results Global tungsten Cash Cost Curve (US$/mtu) Parameter Unit BFS Production Rate (LoM Avg) mtu 2,200 Life of Mine years 12 Total Cash Cost (FCA) A$/mtu 159 Capital Cost A$m

  29. Slide 29: Mt Carbine Geology & Mining Plan

    Mt Carbine Geology & Mining Plan Drilling and Expansion Imagery of Mt Carbine drill core 29

  30. Slide 30: Geology and Resources

    Geology and Resources Completed 2022 Workplan Stage 1 – Define Resources for Open Cut Mine Stage 2 – Drill & Expand • Detailed Drilling allowed high grade zones • Drill out additional shallow open cut to be linked, around the Andy White pit resources • Measured Group prepared Statement • Convert 6Mt

  31. Slide 31: Geology and Resources

    Geology and Resources Underground Resources Phase 1 and 2 (under Bankable Feasibility Study) • Low grade stockpile – 10.1Mt@0.075% • Preferred Pit - 15Mt Pit Extension contains 1.1Mt@0.83%WO3 Planned Decline • 14.4% of known in-situ resources Phase 3 (planned Scoping Study) • Long Life Underground M

  32. Slide 32: Q1/22 – Completed Phase II western drilling

    Q1/22 – Completed Phase II western drilling Drilling for Western Pit Extension Future Pit (BFS) Example of scheelite mineralization overprinting wolframite King Vein Intersections Insert showing tungsten EQ024 Intersections marked EQ023 as ‘Brown Disks’ and grouped in two lodes EQ025 EQ021 EQ022 EQ0

  33. Slide 33: Broader lower grade intervals occur around King Veins

    Broader lower grade intervals occur around King Veins Modelling of additional Mineralisation • 10 holes for 2,121m of additional drilling has highlighted shallow mineralization continuing westwards. • This image shows mineralization extension of >0.1% WO3 mineralization. • Modelling is being underta

  34. Slide 34: 2022 - Regional Extension Vein Drilling

    2022 - Regional Extension Vein Drilling Locating New Mt Carbine Sheeted Systems: Exploration Drilling Q2 • Target other key vein packages similar to Mt Carbine (black arrows) • Integrated Geophysics & Soils • Complete Plot-Logic Multi-frequency Scan Program • Extend Structural Mapping Q1 Targets 3-y

  35. Slide 35: Phase 1 & 2 Mine Plan

    Phase 1 & 2 Mine Plan Mine plan is designed to extract ore from the open-cut pit extension and low grade ore stockpile BFS mine plan is designed to deliver a constant feed of 1Mtpa of ore to the ROM for a 12 year mine life Mine plan is supported by the Mineral Resource of 21.2Mt (Extraction from Mea

  36. Slide 36: Why EQ Resources

    Why EQ Resources 1 Australia’s only primary producer of tungsten, a critical mineral 4 BFS only focusses on the open pit only 14.4% of the resources (excl LGS) Scoping study for UG completed for 2 Strong Economics of Open Pit & LGS (BFS scope) – $131M NPV8 with 154% IRR 5 Q1 2022, confirmed technica

  37. Slide 37: Follow us on

    Site Contact: Investor Relations: Kevin MacNeill Peter Taylor Chief Executive Officer NWR Communications T: +61 438 542 260 T: +61 412 036 231 E: kmacneill@eqresources.com.au E: peter@nwrcommunications.com.au Registered Office: Mt Carbine Office: Level 4, 100 Albert Road 6888 Mulligan Highway, South