  1. Slide 1: Building an Australian Base Metals Business

    ASX: VXR Building an Australian Base Metals Business A J SAVERIMUTTO | Managing Director | RRS Gold Coast, 4-5 June 2019 1

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer Cautionary Statement The information contained in this document (“Presentation”) has been prepared by Venturex Resources Limited (“Company”). This Presentation is being used as a presenter’s aid with summarised information. See Venturex’s other and periodic discl

  3. Slide 3: Corporate Snapshot – Leadership and Key Financials

    Corporate Snapshot – Leadership and Key Financials Board Key Metrics Anthony (Tony) Kiernan Share Price $0.17 Non-Executive Chairman Shares on Issue 280M Ajanth (A J) Saverimutto Market Capitalisation $48M Managing Director P-NAV (MC/Project NPV) 0.12 Anthony Reilly Non-Executive Director Cash at Ba

  4. Slide 4: Venturex – Building a mid-tier Australian base metal company

    Venturex – Building a mid-tier Australian base metal company Northern Star On Path Australian High-Grade Excellent Major to Project Deposit Financials Shareholder Construction 4

  5. Slide 5: Project Snapshot – Sulphur Springs

    Project Snapshot – Sulphur Springs Strategically located in world-class Pilbara district Access to port facilities, via haul road and sealed highways 13.8Mt Cu-Zn deposit (~3.5% Cu Eq*) +10-year mine life, producing Cu & Zn concentrate Low CAPEX and rapid payback Funding strategy well advanced Subst

  6. Slide 6: Market Timing

    ventuReXx | Market Timing

  7. Slide 7: Diminishing Supply – Market Timing

    Diminishing Supply – Market Timing Supply shortfall expected by 2020 Resource depletion on current projects Grade decline in large copper projects Lack of investment in new projects Falling copper inventories 7

  8. Slide 8: Strong Demand from EV’s – Market Timing

    Strong Demand from EV’s – Market Timing Electric Vehicles (EV’s) Electric Vehicles (EVs) are a major growth market An average EV needs 4 x the copper of a conventional medium-sized car The EV fleet forecast to be 230 million in 2035 and 750 million by 2050, equivalent to half the global fleet1 SOURC

  9. Slide 9: Project Update

    VEnTUne Project Update

  10. Slide 10: Project Update – Progress & Successes

    Project Update – Progress & Successes Funding and Finalise EPA Share Construction DFS Permitting Camp Consolidation Resource Metallurgy Complete Purchased 3 2 Drilling Testwork1 1. Refer ASX Release 06 Aug 2018 2. Refer ASX Release 13 Aug 2018 3. Refer ASX Release 10 Oct 2018 10

  11. Slide 11: Australian Mines & Metal Endowment – A Standout Asset

    Australian Mines & Metal Endowment – A Standout Asset 12 Australian VMS Underground Project Australian VMS Open Pit Project 10 Sulphur Springs Project Cu Eq Grade (%) 8 6 4 2 Sulphur Springs Project 0 0 2 4 6 8 10 12 14 16 18 20 Resource (Mt) SOURCE : VXR, MMG, SLR, MLS, ERL, MRP, SYV, HRR, RVR, IGO

  12. Slide 12: Project Design – An Economy of Scale Project

    Project Design – An Economy of Scale Project Open Pit Design o Optimised open pit design o Low strip ratio Underground Design o Bulk mining method (Stoping – SLC) o Low capital development requirement Metallurgy o 1.25Mtpa plant throughput (Designed for 2Mtpa) o Simple crush, grind, float process In

  13. Slide 13: DFS – Financial Results – A Financially Attractive Project

    DFS – Financial Results – A Financially Attractive Project ➢ Excellent project financials ➢ NPV8 = AUD 472 M NPV8 ➢ IRR = 51% ➢ Free Cash Flow = AUD 818 M AUD 472 ➢ Average cash flow of ~AUD 80 M per year Million1 ➢ Plant capacity 1.2Mt/annum – designed to allow easy expansion to 2.0Mt/annum concent

  14. Slide 14: Operating Costs – Strong Margins & Cash Flow

    Operating Costs – Strong Margins & Cash Flow A Cornerstone Asset with Width, Grade and Scale LOM COSTS Output Unit Value Revenue AUD/t 209 Operating Cost Per Tonne AUD/t 122 Capital Cost per Tonne AUD/t 22 Total Cost per Tonne AUD/t 144 Margin AUD/t 65 Tonnes Cu Cu Metal Zn Zn (Metal METAL SOLD (Con

  15. Slide 15: Funding – Potential Paths to Production

    Funding – Potential Paths to Production BANKS & PRIVATE DEBT BONDS NAIF EQUITY FUNDING CONCENTRATE OFF-TAKES ASSET EQUITY MARKETS LEVEL 15

  16. Slide 16: Project Update – Ready for Development

    Project Update – Ready for Development CONTROLS Identify / Shortlist Scope Tender / EOI Award / Contract Plant Contract In progress Open Pit Contract In Progress Infrastructure & Earthworks In Progress WORK IN PROGRESS Gas Supply Power Capital Deferral Key Personnel 16

  17. Slide 17: Schedule to Production – Making It Happen

    Schedule to Production – Making It Happen MILESTONE Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Mining EPA Approval Water Licence & Works Approvals Financing Plant Site Earthworks & Pre Strip Process Plant Construction Process Plant Commissioning Open Pit Development Production Ramp-up Full Production 17

  18. Slide 18: Poised For Growth

    eo” VENTURE Poised For 18

  19. Slide 19: Panorama Exploration – Multiple Local Targets

    Panorama Exploration – Multiple Local Targets +27km VMS belt Potential for further look- alike deposits Surface gossan identified at numerous prospects Drill program imminent Refer ASX announcements 22 September 2015 and 21 March 2018 19

  20. Slide 20: Realising Our Potential – Under-explored VMS District

    Realising Our Potential – Under-explored VMS District

  21. Slide 21: Panorama Trend – Sulphur Springs / Breakers

    Panorama Trend – Sulphur Springs / Breakers Sulphur Springs Breakers 21

  22. Slide 22: Value Proposition – Why Invest in us?

    Value Proposition – Why Invest in us? Value Markets Shareholders Exploration Strong Team Cornerstone Northern Star 27km exploration Robust asset Strong markets potential strategy major shareholder Excellent Diminishing Few ASX-listed Multiple VMS Strong economics supply copper companies targets visi

  23. Slide 23: Thank you

    Thank you A J SAVERIMUTTO | Managing Director Building an Australian Base Metals business. Registered Office: Level 2, 91 Havelock Street, West Perth, WA 6005 T: + 61 8 6389 7400 F: + 61 8 9463 7836 ASX: VXR admin@venturexresources.com Media: Nicholas Read / Read Corporate www.venturexresources.com

  24. Slide 24: Appendix – Mineral Resources

    Appendix 1 – Mineral Resources Indicated Mt Cu % Zn % Ag g/t Sulphur Total Springs 11.7 1.4 4.2 17 Mt Cu % Zn % Ag g/t Resources (2019)1 Inferred 17.4 1.3 4.2 17 Mt Cu % Zn % Ag g/t 5.7 1.2 4.4 18 Grand Total Measured Mt Cu % Zn % Pb % Ag g/t Au g/t 25.9 1.24 3.47 0.18 19 0.1 Mt Cu % Zn % Pb % Ag g/