    For personal use only MAGNETITE MINES LIMITED High Grade Iron Ore Concentrate Share Cafe “Hidden Gems” Webinar 19 March 2021

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only Important Notice The purpose of this presentation is to provide general information about Magnetite Mines Limited ("MGT"). It is not recommended that any person makes any investment decision in relation to MGT based on this presentation. This presentation contains ce

  3. Slide 3: Corporate Overview

    CORPORATE OVERVIEW For personal use only SHARE PRICE (1 Year) CAPITAL STRUCTURE Shares M 2,856 Options M 109 Quoted Options M 470 Share price (18 Mar 2021) A$ $0.043 Market Capitalisation (18 Mar 2021) A$ $123m Cash (18 Mar 2021) A$ $4.246m SHAREHOLDER SNAPSHOT BOARD OF DIRECTORS Mr Peter Schubert E

  4. Slide 4: Taking Advantage of Favourable Geography

    TAKING ADVANTAGE OF FAVOURABLE GEOGRAPHY For personal use only Location advantages: • 240km NE of Adelaide within the Braemar Iron Formation1 • Close to grid power, rail, port and groundwater 1 4

  5. Slide 5: High Grade Fines – Material Premium and Stable Pricing

    HIGH GRADE FINES – MATERIAL PREMIUM AND STABLE PRICING For personal use only 5 Source: Fastmarkets MB Iron Ore Index

  6. Slide 6: Plan to Leverage Scale, Location and Opportunity to Deliver Value

    PLAN TO LEVERAGE SCALE, LOCATION AND OPPORTUNITY TO DELIVER VALUE For personal use only • Large resource in favourable geography • JORC resource 3.9 billion tonnes global resource (Inferred and Indicated)3,4 • Amenable to simple processing to high grade product – targeting 68.5% Fe, 6.5% Fe higher t

  7. Slide 7: Attractive, Staged Development Pathway Focussed on Capital Efficiency

    ATTRACTIVE, STAGED DEVELOPMENT PATHWAY FOCUSSED ON CAPITAL EFFICIENCY For personal use only • Strong iron ore demand, premiums for high grade products and limited new supply provide a favourable environment for Razorback • We believe that a relatively low capital, long life development of the large

  8. Slide 8: New Geological Interpretation

    NEW GEOLOGICAL INTERPRETATION For personal use only • Extensive drilling has resulted in a comprehensive database, core library and geophysical logs8 • We have used this extensive information to build a new orebody model that allows a new interpretation of the grade distribution and enables detailed

  9. Slide 9: NextOre – Year Exclusivity Australia Wide

    NEXTORE – 4 YEAR EXCLUSIVITY AUSTRALIA WIDE For personal use only • Agreement with NextOre for supply of a full-scale mobile ore sorting plant for the Razorback Project for sorting magnetite ore using MR technology, with equipment despatch from the CSIRO Lucas Heights facility in 20219,10 • Exclusiv

  10. Slide 10: Metallurgical Investigations

    METALLURGICAL INVESTIGATIONS For personal use only • High resolution testwork has confirmed the stratabound nature of mineralisation i.e. mineralisation is contained within discrete, traceable layers – not disseminated mineralisation8 • Hatch is currently undertaking a metallurgical review of the Ra

  11. Slide 11: Advancing Infrastructure Access

    ADVANCING INFRASTRUCTURE ACCESS For personal use only • Logistics and power options developed under the 2019 Scoping Study to be refined utilising existing infrastructure providers1 • Location of Razorback deposit well placed with respect to existing infrastructure1 • Commercial engagement with powe

  12. Slide 12: Environment and Permitting

    ENVIRONMENT AND PERMITTING For personal use only • Ecological Australia have been engaged to initiate baseline environmental studies and have provided an approval pathway11 Key activities • Baseline studies (incl, heritage, flora, fauna, water etc.) • Environmental impact assessment study (incl. wat

  13. Slide 13: Rapid progress

    For personal use only Rapid progress 13

  14. Slide 14: Muster Dam Iron Project

    MUSTER DAM IRON PROJECT For personal use only • Company awarded Muster Dam Iron Project tenement by SA Department of Energy and Mines – tenement in processing12 • Tenement contains Muster Dam 1.5 billion tonne, Inferred Resource (2004 JORC Code and Guidelines standard) 12,13 • Prospective for additi

  15. Slide 15: Indicative Development Schedule

    INDICATIVE DEVELOPMENT SCHEDULE For personal use only 2020 2021 2022 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 PFS (excl drilling/met testing) Bulk Ore Sorting Trial DFS Funding DFS Study Decision to Mine Project Funding Permitting, Enviro. and Native Title Design Procure

  16. Slide 16: The MGT Value Proposition

    THE MGT VALUE PROPOSITION For personal use only Five Key Advantages of the Razorback Iron Project 1. Globally significant iron ore resource in low sovereign-risk jurisdiction 2. Open-access to existing port, road, rail and power infrastructure1 3. Conventional processing/beneficiation flowsheet with

  17. Slide 17: For personal use only

    For personal use only

  18. Slide 18: References – Releases

    References – ASX:MGT Releases For personal use only 1. 07/11/2020 – Positive Razorback Scoping Study Results 2. 27/11/2020 – Presentation to 2020 AGM 3. 12/11/2020 – Razorback Iron Project – JORC 2012 Resource Update 4. 20/11/2020 – Ironback Hill Deposit – JORC 2012 Resource Update 5. 13/09/2016 – M