Aya Gold & Silver — Investor Presentation (April 2024)

34 slides from Aya Gold & Silver's investor presentation, Apr 5, 2024

  1. Slide 1: Building the largest pure-play silver producer globally

    Building the largest INVESTOR PRESENTATION pure-play silver APRIL 2024 producer globally TSX: AYA | OTCQX: AYASF TSX: AYA; OTCQX: AYASF

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements The Zgounder Expansion Feasibility Study (“FS”) is based on a technical report entitled “NI43-101 expected timelines, including the expected timeline for the Corporation to produce new resources The Zgounder TECHNICAL Expansion REPORT Feasibility Study – FEASIBILITY STUDY

  3. Slide 3: Aya

    1 AYA 1. Aya 2. Zgounder Silver Mine 3. Exploration 4. Catalysts

  4. Slide 4: Aya Proven Management Team

    Aya Proven Management Team Benoit La Salle, FCPA, MBA Mustapha Elouafi Ugo Landry-Tolszczuk Elias Elias President & CEO, Director President-Managing Director, Chief Financial Officer Chief Legal and Morocco Sustainability Officer Benoit has over 25 years of Ugo’s involvement with Africa experience a

  5. Slide 5: Aya Experienced Board of Directors

    Aya Experienced Board of Directors Benoit La Salle, FCPA, MBA Robert Taub Natacha Garoute, CPA, CA Yves Grou, CPA, CA President & CEO, Director Chair Director Director Benoit has over 25 years of Natacha has more than 20 years experience as a corporate executive Robert is an entrepreneur in life sci

  6. Slide 6: Aya Our History

    Aya Our History Imiter bis, Amizmiz, Azegour +700 tpd mill capacity achieved at Zgounder projects acquired Zgounder flotation Construction start for Zgounder expansion 2009–2011 plant commissioned Boumadine acquired bringing production capacity to 700tpd 2022 2013 2019 2012 2020 2023 New management

  7. Slide 7: The Only TSX-Listed Pure-Play Silver Producer

    Aya The Only TSX-Listed Pure-Play Silver Producer 100% 80% 60% Silver Gold 40% Other 20% 0% rp t ld r t ic na as n a r a AG l lo g es eu ou Ay cl in ica Go co ni r tu ic es He M in Cr Co av er es er er o M aj Fo er de Am *G Am lv Fr tM lv R En Si SS Si rs n Pa Fi Source: Desjardins Capital Markets,

  8. Slide 8: Morocco Top Mining Jurisdiction

    Morocco Top Mining Jurisdiction By the numbers Phosphate – #16 Investment Attractiveness Global Index 1st producer #17 Policy Perception Global Index in Africa, 4th worldwide Fraser Institute Annual Survey of Mining Companies, 2022 Barite – 1st producer in Africa, 3rd worldwide 710,850 km2 Fluorite

  9. Slide 9: Morocco Developing the Mining Sector

    Morocco Developing the Mining Sector Mainly Moroccan miners: 2016 Baseline Mining Code OCP, SOMIFER, SAMINE, SACEM, Revision of mining Zgounder First modern mines SMI, CTT & ONA (now Managem) code 3% of Royalty sales 1920 1951–1995 2016 Tax rate* State free-carried 25% Nil interest Foreign ownership

  10. Slide 10: Our Assets Morocco-Focused, Quality Growth Portfolio

    Our Assets Morocco-Focused, Quality Growth Portfolio Zgounder Silver Mine – Cornerstone of Aya’s Growth Story • 2023 production of 1.97M oz • 2024 guidance of 2.6M – 3.2M oz Ag • Increase in 2024 production due to partial expanded capacity • 96M oz M&I resources at 306 g/t Ag* Development Upside • B

  11. Slide 11: Capital Structure Robust Balance Sheet

    Capital Structure Robust Balance Sheet Institutional Shareholder Breakdown1 60% USA 15% Board & Management 16% Europe 32% Family offices2 21% Canada 33% Institutional 3% Australia & ROW 20% Retail 1 Based on 42.5M shares institutional ownership 2 Affiliated with Aya Board and insiders Exchanges – TS

  12. Slide 12: Zgounder Industry-Low Discovery Costs

    Zgounder Industry-Low Discovery Costs • Resources as a unit of total shares outstanding In Moz Ag 96.1M oz* up >630% to 96.1M oz since 2020 Proven & probable reserves • Industry-low discovery cost of $0.18 with only M&I resources 25,2 $15.3M spent All mineral resources are exclusive of mineral reser

  13. Slide 13: Zgounder Top Silver Intercepts Globally

    Zgounder Top Silver Intercepts Globally Zgounder reported 3 out of the top 10 and 15 out of Los Ric os, 1 Zgou nde r, 2 85 450 118 399 the top 50 global silver intersections of 2020-2023¹ Eliza beth Hill, 3 Filo d el Sol, 4 La Colorad a, 5 69 147 80 762 77 683 Breccia, 6 65 930 • 21.6m @ 3,956 g/t A

  14. Slide 14: 2023 Excellent Momentum Created for 2024

    2023 Excellent Momentum Created for 2024 Delivered a record year: • • Generated record revenue, earnings and operating cash flow Record production of 1.97M oz and third consecutive production guidance +5% Silver YoY production growth beat • 240% YoY increase in H&S training hours • 86% reduction in

  15. Slide 15: Zgounder Strong Execution and Operational Efficiencies

    Zgounder Strong Execution and Operational Efficiencies Solid operational standard reached in 2021 by: 700 000 89,9% 100 § Switch to cut-and-fill mining method 87,3% 82,8% 87,9%86,2% 87,1% 86,7% 90 § Implementation of operating best practices 600 000 86,6% 78,9% 82% 81%82,4% 80,4% § Capital infrastru

  16. Slide 16: Zgounder Mineral Reserves

    Zgounder Mineral Reserves Silver Reserves On a 100% basis. M&I resources shown inclusive of reserves.¹ • The reserves include drilling carried out between Tonnes Ag Content January and September 2021 (K) (G/T) (Ag K Oz) • Reserves include 29% open-pit and 71% Proven Reserves 2,100 288 28,748 undergr

  17. Slide 17: Zgounder Expansion Feasibility Study Highlights

    Zgounder Expansion Feasibility Study Highlights 71Moz $373M LOM Production Profile* P&P reserves Post-tax NAV5% ($22/oz) 10 000 000 350 9 000 000 300 8 000 000 $139.4M $9.58 7 000 000 250 Growth capex AISC (LOM) 6 000 000 200 5 000 000 150 11-year 48% 4 000 000 3 000 000 100 LOM Post-tax IRR ($22/oz

  18. Slide 18: Expanded operations will combine

    Expanded operations will combine: • 2,000 tpd Merrill-Crowe plant and 700 tpd flotation-cyanidation plant • Open-pit & UG operations TSX: AYA; OTCQX: AYASF

  19. Slide 19: Construction of Zgounder New Processing Plant

    2 CONSTRUCTION OF ZGOUNDER NEW PROCESSING PLANT March 2024 TSX: AYA; OTCQX: AYASF

  20. Slide 20: Zgounder Expansion Quarterly Spotlight at YE-2023

    Zgounder Expansion Quarterly Spotlight at YE-2023 90% of electrical pylons erected, and 30% of cabling installed at YE Water storage basins were completed before annual rainfall TSX: AYA; OTCQX: AYASF 20

  21. Slide 21: Zgounder Expansion Quarterly Spotlight at YE-2023

    Zgounder Expansion Quarterly Spotlight at YE-2023 2022 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Feasibility study (100%) FEED (100%) Long-lead purchasing (100%) EPC offer (100%) Detailed engineering (100%) Earth & civil works (100%) Construction (60%) Commissioning (0%) First silver pour (0%) P

  22. Slide 22: Aya Achieving Sustainability Leadership

    Aya Achieving Sustainability Leadership Low-Carbon Strategy and Corporate Social Environmental Commitment Health and Safety Responsibility Priorities: water, tailings management and 2024 priorities: consolidating management Priorities: national recruitment and clean energy. Near-zero Scope 2 emissio

  23. Slide 23: Aya Near-term Decarbonization Objectives

    Aya Near-term Decarbonization Objectives Estimated total GHG emissions for the Zgounder Silver Mine CO2 tonnes 70000 88% 60000 Reduction in 50000 overall emissions 40000 Construction and in 2025¹ ramp-up of new mill 30000 20000 10000 TOTAL WITH PPA 0 TOTAL BUSINESS AS USUAL 10802 10184 ZGOUNDER SILV

  24. Slide 24: Aya Governance and ESG Disclosure

    Aya Near-term Decarbonization Objectives Achieved in the last three Alignment of executive pay to performance Increased transparency years since arrival of new and shareholder interests of ESG disclosure management team in support of the below Other frameworks: 5% 37% Women board Market performance

  25. Slide 25: Exploration

    3 EXPLORATION 1. Aya 2. Zgounder Silver Mine 3. Exploration 4. Catalysts

  26. Slide 26: Aya 2024 Drill Program of 145,000m Focusing on Boumadine

    Aya 2024 Drill Program of 145,000m Focusing on Boumadine Zgounder Silver Mine • Budget of 15,000m • Follow up underground targets generated by 2023 program Boumadine (Development) • 11,332m completed of 120,000m budgeted • 60,000m: explore and expand 4.2 km strike • 60,000m: test new targets • Mobil

  27. Slide 27: Zgounder At-depth Drilling Prioritized on Near-Mine Permits in 2024

    Zgounder At-depth Drilling Prioritized on Near-Mine Permits in 2024 15,000m budgeted in 2024 At-depth drill results to date confirm high-grade silver mineralization near the granite contact, with two holes hosted within the rhyolite, which was previously believed to be barren. Recent Drill Result Hi

  28. Slide 28: Zgounder Regional Testing Possible East Extension & South Mirror in 2024

    Zgounder Regional Testing Possible East Extension & South Mirror in 2024 • 2,000m drilling to test drill conceptual target under the Neocene cover (Tuffs) east of the granophyre • Potential continuation of the Zgounder deposit (volcano-sediments). • 2,000m to test drill southern contact of the rhyol

  29. Slide 29: Tirzzit Test Drilling Cu-Ag Mineralization in 2024

    Tirzzit Test Drilling Cu-Ag Mineralization in 2024 (Cu, Ag) Historical copper mine offering near-surface silver and copper mineralization potential, with historical drilling intercepts of up to 3.5% Cu • 3,000m drill program to test Cu-Ag mineralization in 2024 • 2024 program informed by 2023 fieldw

  30. Slide 30: Boumadine 2024 Accelerated Development

    Boumadine 2024 Accelerated Development (Au, Ag, Pb, Zn) Through drilling¹ • 11,332m of 120,000m budgeted drill program completed • 60,000m – expand 4.2km open-ended strike and infill • 60,000m – test hypotheses and generate new drill targets • NI 43-101-compliant resource estimate expected in H1-202

  31. Slide 31: Boumadine Expand Main Zone Strike, Which is Open in All Directions

    Boumadine Expand Main Zone Strike, Which is Open in All Directions Drilling Highlights1 • 1,039 g/t AgEq over 23.5m (6.41 g/t Au, 116 g/t Ag, 4.7% Zn, 0.6% Pb and 0.4% Cu) • 763 g/t AgEq over 38.3 m (1.53 g/t Au, 311 g/t Ag, 4.4% Zn, 1.8% Pb and 0.04% Cu) • 474 g/t AgEq over 30.1m (2.57 g/t Au, 85 g

  32. Slide 32: Amizmiz Expand and Test Historical Work

    Amizmiz Expand and Test Historical Work (Au) Expand understanding of Amizmiz mineralization: Schematic cross section of Amizmiz • Mining permit located 55km SSW of Marrakech and 12km from historical Azegour Mine. • Follow up on detailed geological and structural mapping that identified mineralized z

  33. Slide 33: Aya Catalysts

    Aya Catalysts • Boumadine resource estimate • Zgounder & Boumadine drill program results • Zgounder Silver Mine expansion • Achieve 2024 silver production and cost guidance • Achieve 2024 ESG milestones of EBRD-CTF loan agreement TSX: AYA; OTCQX: AYASF 33

  34. Slide 34: Contact

    1320 GRAHAM, SUITE 132 VILLE MONT-ROYAL, QC H3P 3C8 BENOIT LA SALLE: Benoit.Lasalle@ayagoldsilver.com ALEX BALL: Alex.Ball@ayagoldsilver.com www.ayagoldsilver.com | info@ayagoldsilver.com TSX: AYA | OTCQX: AYASF TSX: AYA; OTCQX: AYASF