TransAtlantic Petroleum Ltd

TransAtlantic Petroleum — Shareholder Meeting (May 2014)

34 slides from TransAtlantic Petroleum's shareholder meeting presentation, May 27, 2014

  1. Slide 1: 2014 Annual Meeting

    Exhibit 99.1 2014 27, May ANNUAL 2014 MEETING

  2. Slide 2: Forward Looking Statements

    FORWARD Outlooks, Ltd.’s and These results authorities, contracts; discussed www.sec.gov. reasonable informational date The economically “prospective from the estimated or Note used 2Cover exceed Company. capacities; information SEC hereof, in including on own include Photo: of isolation. Possible B

  3. Slide 3: Introduction

    N. Malone&Mitchell INTRODUCTION 3Chairman CEO 3rd

  4. Slide 4: New Track Record of Growth, Led by Experienced Team

    NEW TRACK Led Todd 37 President, B.B.A. Certified James 29 COO, Engineering Primary Previous 4B.S. years Longfellow inC. PRESIDENT Longfellow R. Petroleum inDutton, responsibility: of RECORD experience: Professional Huling, Petroleum Longfellow industry Manager, Energy President COO Engineering, Ene

  5. Slide 5: Selmo Lease Extension Approved and Production Increasing

    SELMO Received –Net 5Şelmo-54H1 Term Comprised sales extended EXTENTION are 10-year currently well of 3,850 until extension in southeastern BOPD June ~5,300 APPROVED 1,onand 2025 BOEPD Şelmo 8.8 Turkey, AND MMCFPD production duespudded PRODUCTION to production lease Aprilfrom 30, increases INCREASIN

  6. Slide 6: Expect New 3D Seismic to Improve Targeting in Turkey

    EXPECT In Selecting Currently 6Bahar-2ST the pastwell NEW drilling year, welllocations 3D in wetwo southeastern SEISMIC shot Bahar in more southeastern wells TO than Turkey, IMPROVE with 1,000improved Turkey spudded km2TARGETING (386 based March data miles2) on12, new2014 of IN seismic new TURKEY ba

  7. Slide 7: Targets in Known Producing Areas of Turkey and Bulgaria

    TARGETS (26 (110 Natural 13.8 BULGARIAN KOYNARE CHIREN 10.4 BASIN Crude 200 Note: MMBo kilometers BCF MMCFPD Bcf Production Oil Gas produced) GAS Proved ARE produced) PRODUCTION JURASSIC 9.9 FIELD Production IN is Reserves MMBOE average AREAS SOFIA OILFIELDS (19% (37% for OF Proved CONCESSION BULGAR

  8. Slide 8: Operating and Financial Highlights

    OPERATING Results % Unhedged Oil Average BOED Financial EBITDAX(1) Net 8(1)Oil EBITDAX (BBLD) (BBL) Sales income(1) 63% 4,022 $72.52 for Netback (US Prices $94.13 three 61% 2,527 4,076 AND $17.2 $MM) $73.67 2.9 and 58% months $103.04 (4.8) 2,500 net 4,391 FINANCIAL $19.9 63% $71.57 income (14.4) end

  9. Slide 9: Operations Review

    OPERATIONS 9Ian President J. DelahuntyREVIEW

  10. Slide 10: Three-Part Strategy to Increase Production and Cash Flow in Turkey

    THREE-PART Molla Recently Anticipate Şelmo Remodeled Recent Waterflood Thrace Successfully Acquired Expect 10 Area Field Basin to success spudded 800 234 drill drilling and Drilling field Redevelopment completed Development km2 conventional STRATEGY of polymer using horizontal two several ofProgram

  11. Slide 11: Estimated Q3-Q4 2014 Production Growth

    ESTIMATED Q3-Q4 Molla Current Pilots Guidance 7,000 6,000 1,150 5,000 BOPD 4,800 4,000 MMCFPD 3,000 Note: 11 Estimates excluded (450) BOPD (70) BOEPD 2,000 Net Area or 2014 Natural (2.7) range: Sales Şelmo or 1,000 Estimates (525) 2014 2.5 BOPD BOEPD Drilling 8,000 do 1,000 BOEPD Area from not PRODU

  12. Slide 12: Conservative Guidance Assumptions for Production Forecast

    CONSERVATIVE GUIDANCE Actual Estimated Basin Molla BOPD 12 Well Area Targeted Current results Type Bahar ASSUMPTIONS average Production Analog for Vertical PRODUCTION theofAnalog remainder 7Proved/Probable most FOR Well recent: FORECAST of2014 Reserves 2014 295are 250 BOPD Guidance based BOPDThrace

  13. Slide 13: Molla Area Growth Plan

    MOLLA Q3-Q4 Current Pilots Guidance 7,000 6,000 1,150 5,000 4,800 4,000 MMCFPD 3,000 Reserve Proved Probable Possible Exploration Facilities Seismic Total Note: Molla Targeting Expect Drilling 13 $43.8 Estimates excluded BOPD (70) BOEPD 2,000 Net Area Bahar 2014 $6.0 Natural exploration 3.0 Category

  14. Slide 14: Molla Area, Southeastern Turkey

    MOLLA Perenco’s (EUR Şelmo Bahar Spudded BatI Largest Drilled Idil Bakuk 14 Prospects Raman 15 Field Field 1oil AREA, 2MMBO) Kastel field Field Drilled Göksu inSOUTHEASTERN Field Turkey 5Molla Arpatepe TURKEY Field FieldEIGHT Field WELLS SPUDDED YEAR-TO-DATE

  15. Slide 15: Molla Southeastern Turkey Area: Bahar and Göksu Fields

    MOLLA SOUTHEASTERN Bahar, Currently Göksu Bahar-2ST 15 Göksu 3DAREA: drilling seismic operations fields BAHAR vertical isTURKEY, are being ininsoutheastern Bahar AND the processed; sweet OIL, GÖKSU wells; 100% spot Turkey; expect based of FIELDS WIsoutheastern to on spudded drill results, horizontal

  16. Slide 16: Bahar Field Development Plan: Initial Wells

    MOLLA SOUTHEASTERN Initial 1Top 16kilometer Bedinan fiveAREA: wells Structure will BAHAR TURKEY, be(10,000’) vertical FIELDOIL, inDEVELOPMENT order 100% toWI de-risk thePLAN geology of the Bahar structure

  17. Slide 17: Bahar Field Development Plan: Vertical Wells

    MOLLA SOUTHEASTERN Vertical 1Top 17kilometer Hazro wells AREA: F4 will Structure BAHAR produce TURKEY, (8,700’) FIELD fromOIL, both DEVELOPMENT 100% the Bedinan WI andPLAN Hazro formations

  18. Slide 18: Selmo Field Growth Plan

    ŞELMO Q3-Q4 Molla Current Pilots Guidance 7,000 6,000 1,150 5,000 4,800 4,000 MMCFPD 3,000 Reserve Proved Probable Possible Exploration Facilities Seismic Total Note: Şelmo Drilling Recent Waterflood 18 $32.0 Estimates excluded BOPD (70) BOEPD 2,000 Net Area Field success 2014 $27.0 Natural horizont

  19. Slide 19: Pilot Projects to Increase Oil Recovery

    PILOT SOUTHEASTERN Pilot Şelmo -Arpatepe Workover 19 Converted Injected Completed Four 20+ Currently Project candidates of field PROJECTS five field more operations in waterflood polymer two five Status wells planning waterflood than wells for well resulted TURKEY TO polymer 70,000 injection inpilot

  20. Slide 20: Selmo Field Development Plan

    ŞELMO SOUTHEASTERN Şelmo Recent 20 development successes FIELD DEVELOPMENT in TURKEY, southeastern is focused OIL, onportion increasing PLAN 100%ofWI the thefield, recovery lowest of well the field; concentration converting probable and possible reserves into proved reserves

  21. Slide 21: Changing Drilling Orientation in the Selmo Field

    ŞELMOthan SOUTHEASTERN Changing Rather Drilling 21 parallel Perpendicular Parallel FIELD well drilling orientation to DEVELOPMENT faults Faults TURKEY, perpendicular to decreases Faults in theOIL, Şelmo tothe PLAN 100% faults, risk field WI of drill towellbore lower parallel well instability to cost

  22. Slide 22: Selmo Field Development Plan: Waterflood Conversions

    ŞELMO SOUTHEASTERN Commenced Plan Şelmo 2014 Converted to MSD Field convert FIELD to 2014 Waterflood secondary Injectors atDEVELOPMENT LSD least TURKEY, 2015 in four recovery Conversions 1Hwells MSD 2014 OIL, into 2016 22 PLAN Şelmo 100% injection MSDin WI1Q 2017 in 2014 2014 MSDas to pilot increase

  23. Slide 23: Selmo Field Development Plan: Polymer Injection Results

    ŞELMO SOUTHEASTERN Initiated Initial Following One BOPD Well Şelmo 23 month Delta five well BOPD polymer FIELD observation wells Pre-Injection after 431 80 30 139 59 DEVELOPMENT injection, added injection +59 +21 +139 TURKEY, period, BOPD ~250 Post-Injection BOPD average in BOPD Şelmo Şelmo approxim

  24. Slide 24: Thrace Basin Growth Plan

    THRACE Q3-Q4 Molla Current Pilots Guidance 7,000 6,000 1,150 5,000 4,800 4,000 MMCFPD 3,000 Reserve Targeting Expect Underspending Total Note: 24 $8.3 Estimates excluded BOPD (70) BOEPD 2,000 Net Area newly 2014 Natural Category natural range: Sales BASIN MM Şelmo 1,000 Estimates from acquired BOPD

  25. Slide 25: Thrace Basin Northwestern Turkey Development Plan

    THRACE NORTHWESTERN Future Drilled Teslimkoy 541000 43820 12L Horizontal 25ocation New BTD-5H -860proved Drill two 542000 200 BASIN Structure Producing Teslimkoy Mezardere New BTD-4H 400m reserves 543000 Drill DEVELOPMENT 1:10240 TURKEY, Map New horizontal Location potential 544000 (BSL-m) Well -870

  26. Slide 26: Thrace Basin Development Plan: Horizontal Wells

    THRACE NORTHWESTERN Drilled Potential Drilling Gas 26 flare two the to inBASIN horizontal drill BTD-2H1 the Thrace 2-4 DEVELOPMENT Mezardere TURKEY, wells in Basin the in Thrace in1Q NATURAL horizontals, northwestern 2014: Basin PLAN BTD-2H inGAS, 3-5 northwestern Turkey. Teslimkoy 41.5% IP of 2MMCF

  27. Slide 27: Thrace Basin Development Plan: Osmanli 3D Seismic

    THRACE NORTHWESTERN Shot Planning Prospect-1 Prospect-3 Prospect-2 27 234 akm2 BASIN campaign Prospect-6 Prospect-4 (90 miles2) DEVELOPMENT TURKEY, for Prospect-5 conventional, of new NATURAL 3D PLAN seismic vertical GAS, inappraisal the 41.5% OsmanlI wells WI area to begin of thesummer southern2014

  28. Slide 28: Bulgaria Natural Gas Exploration

    BULGARIA NATURAL Bulgaria Currently Expect Deventci-R2 28 toWell request performing GAS, tested well EXPLORATION Status approval in 50% atBulgaria. a~2MMCFPD WI build-up to acidize pressure with the condensates well; test ofthis theiswell the after historical perforation method of stimulating wells

  29. Slide 29: 2014 Capex Budget Allocation

    2014 CAPEX $MM $24.8-$15.2 Bahar-1 Note: expenditures 29 Budget Net well Proved $4.7 are on is ALLOCATION subject production likely $3.0 Probable $88.5 to todeviate review Possible in southeastern from andExploration revision the initial Turkey. byFacilities plan TransAtlantic’s Şelmo according Seis

  30. Slide 30: 2014 Planned Drill Wells

    Molla 2014 Expected Horizontal Vertical 9Total 33 Note: expenditures well. Drilling 30––11 1449 Well PLANNED Budget Arpatepe 14 1 2rig –Total –year-end –2counts 722 on 4–are 1is10 location Area –Selmo subject likely 2DRILL are –production –9Field 8based –Thrace to –in 11 to12 WELLS deviate the revie

  31. Slide 31: Concluding Remarks

    CONCLUDING N. Chairman 31 Malone&Mitchell CEOREMARKS 3rd

  32. Slide 32: Conclusions

    Focusedcontinuity CONCLUSIONS Secondary Year-end Expect 32 on 2014 recovery targeted exitwith rate on drilling new legacy guidance senior with Şelmo based the management use field onofexpected conservative newly acquired to increase estimates 3D seismic recovery

  33. Slide 33: Net Present Value of Reserves per Share

    NET MM Reserves 37.4 $US/Share PDP Total Note: 33 $11.68 PRESENT 1P Proved Reserves as total of $8.76 reserves 12/31/2013 shares VALUE $21.93 PDNPatare 12/31/2013 OF $1.44 $15.87 DeGolyer Discounted RESERVES $0.990% and PUD at:10% MacNaughton PER $8.81 SHARE $6.12 as of 12/31/2013, based on $102.07/

  34. Slide 34: Contacts

    Taylor C.ofBeach CONTACTS Director Taylor.Beach@tapcor.com 34 Investor WilRelations F. Saqueton www.TransAtlanticPetroleum.com VP & CFO (214) 265-4746 (214) 220-4323

TransAtlantic Petroleum — Shareholder Meeting (May 2014) on 6ix