Pantoro Gold Limited · ASX:PNR

Pantoro Gold — Q1 FY2027 Earnings Presentation

15 slides from Pantoro Gold's earnings presentation, Oct 22, 2026

  1. Slide 1: Quarterly Results Presentation September Quarter 2026

    r personal use only ASX:PNR Quarterly Results Presentation September Quarter 2026

  2. Slide 2: Important Notes

    Important Notes r personal use only Nature of Document. This presentation has been prepared and issued by Pantoro Limited (Pantoro or Company) to Forward Looking Statements and future performance This presentation contains forward looking statements about provide general information about Pantoro. P

  3. Slide 3: Important Notes (Continued)

    Important Notes (Continued) r personal use only Past performance. Past performance metrics and figures (including past share price performance of Pantoro), as For the purposes of ASX Listing Rule 5.19, Pantoro confirms that all material assumptions underpinning the well as pro forma financial inform

  4. Slide 4: Production on Guidance, Growth Progressing

    Production on Guidance, Growth Progressing r personal use only • Strong balance sheet – $240.0M cash and gold at 30 September. • Debt free. No hedging. AISC • • $xx/oz Operational cashflow – $63.1M EBITDA. Cash and Gold increased $16.6M during the quarter, after major project and exploration expendi

  5. Slide 5: Taking advantage of our strong position

    Taking advantage of our strong position r personal use only Our key focus: 21,164 oz AISC EBITDA  Maintain strong margins and profitability under all Production $3,860/oz $63.1M conditions. 21% 8% 43%  Responsibly deploying capital to secure long- term growth in Mineral Resources, Ore Reserves and

  6. Slide 6: Safety and Community in Focus

    Safety and Community in Focus r personal use only Safety Performance Safety Statistics • LTIFR reduced to zero, 15 months LTI free. • Downward trend on all injury statistics. • Ongoing site focus on zero harm. Community Initiatives • Annual visit by Carmel Adventist College students as part of their

  7. Slide 7: Norseman Quarter Operations Summary

    Norseman June Quarter Operations Summary r personal use only • Improved production quarter on quarter in line with guidance. • 22,834 ounce sold at an average price of $6,067 per ounce. • Higher grades from both underground and open pit sources. Further grade improvement expected as stopes in Scotia

  8. Slide 8: OK Underground Mine

    r personal use only OK Underground Mine • Produced 6,497 ounces compared with 4,890 ounces during the previous quarter. • Mineral Resource and Ore Reserve replaced all mining depletion with approximately 4 years production in the Ore Reserve (123,000 ounces). • Redpath workforce now at full capacity

  9. Slide 9: Racetrack Discovery – Rapidly gaining momentum

    Racetrack Discovery – Rapidly gaining momentum r personal use only High-grade zone discovered at Racetrack More outstanding results from OK UG Structure Racetrack • High-grade results at Racetrack, just 600m north of Star of Erin (OK 900m Decline)*. • 4.94 m @ 349.14 g/t from 603.02 m 600m Approved

  10. Slide 10: Scotia Underground Mine

    Scotia Underground Mine r personal use only • Scotia produced 10,211 ounces during the quarter, improving on the previous quarter production. • Production underway in Scotia North Deeps and in Additional level historical workings advanced in extensions. Scotia South • Redpath workforce now at full c

  11. Slide 11: Open Pit Mining

    Open Pit Mining r personal use only • Mining at Green Lantern is well underway with ore being delivered to the mill. • Second fleet to mobilise during December 2026 quarter. Short campaign before transferring to Gladstone when the Stage 3 is further advanced. Scotia • Gladstone Stage 3 cutback progr

  12. Slide 12: Mainfield – New underground development underway

    r personal use only Mainfield – New underground development underway • In-ore ramp being developed in Phoenix area of the Mararoa Reef, approximately 300m long x 90m high with high grade development above, below and in the middle of the block. • Level access in the Butterfly area has commenced. • De

  13. Slide 13: Greenfield Exploration Underway

    Greenfield Exploration Underway r personal use only • On Lake exploration has been extremely limited in Norseman with a short campaign by Western mining Between Leeders Hinemoa 1990 and 1992. Snapper Killahoe Hill Davros • Resulted in the discovery of Harlequin Dhufish Tuna Buldania mine which went

  14. Slide 14: Mineral Resource and Ore Reserve Update

    Mineral Resource and Ore Reserve Update r personal use only Annual Mineral Resource and Ore Reserve Update • AISC Year on year, the total Mineral Resource and Ore Reserve have increased by approximately 2% $xx/oz and 9% respectively after mining depletion. • Total Mineral Resource now stands at 43.1

  15. Slide 15: Summary

    Summary r personal use only  Pantoro Gold continues to be in a very strong position with growth activities expanding and a strong, debt free balance sheet funded by ongoing production. Cash and gold of A$240.0 million as at September 30 2026.  Strong start to the year with production in line with

Pantoro Gold — Q1 FY2027 Earnings Presentation on 6ix